Professional Documents
Culture Documents
245 Ecs 9001 - 0
245 Ecs 9001 - 0
FIBRE PORT
ETHERNET PORT
TER01
NATOR
ACTIVE PROFIBUS DP TERMINATOR
VE
DP ACTI
TERMI
NOTES
D002 D003
CONTINUED ON
245-ECS-9002
D102 D103
NTERFACE MODULE
NTERFACE MODULE
NTERFACE MODULE
-16 MODULE
-16 MODULE
-16 MODULE
DO-8 MODULE
DO-8 MODULE
DPY COUPLER
-8 MODULE
RACK 01
RACK 02
M 153-2
M 153-2
SPACE
M 157
M 157
AI
DI
DI
DI
I
I
I
I
I
I
I
I
2031
2051
2231
2211
245CPL9001-D201 245-UPS-9031
UNINTERRUPTED POWER SUPPLY
REF DRG 245-ESL-9031
24VDC 24VDC TER01 245CPL9001-D202
NATOR
REF DRG REF DRG
VE
245-ECS-9012 245-ECS-9012
DP ACTI
TERMI
2371
24VDC
REF DRG
245-ECS-9012
1: koch
marcus.
10 PM
51:
16/10/2018 dgn
ng\ECS Control Sys & PCCs\245\245-ECS-9001.
na de Cobre CPC Scope\02. Drafti
oduced.
ns
y
n
CLIENT
lnotbe passed on i
t
MINA DE COBRE PANAMA
em ai
DRAWN M KOCH 16.10.18
d par
d.
ect
NGS
ylt
oj
om
y pr
ng r
r
CSA WASHDOWN/REFUELLING
he pr
hi
r
REFERENCE DRAW I
ovalf
l
o any t
nal
CHECKED
ects\C1443B Mi
K REDWOOD 16.10.18
awi
245-ECS-9021 245-CPL-9001 TERMINATION DIAGRAMS SHEET 1 MINERA PANAMA S.A
ONS
ort
gi
SUBSTATION CTRL PANEL 245-CPL-9001
en appr
s dr
i
thas been or
yf
m att
ABN 53 131 815 337
SI
DISCIPLINE
d.
Thi
el
REVI
t
CONNECTION DIAGRAM SHEET 1
yl
ENGINEER
ng shal
y ofPr
t
or
t
QUALITY ENGINEERING SOLUTIONS
oni
PRINCIPAL
SCALE DRG. No. CLIENT PROJECT NUMBER
t
A DINGLEY 16.10.18 REV. No.
i
awi
0 ISSUED FOR CONSTRUCTION MK KR JT 16.10.18 245-EGA-9002 245-CPL-9001 GENERAL ARRANGEMENT
ch i
oper
houtpr
r
www.ProcessEI.com.au ENGINEER
ect
COPYRI
\Proj
orwhi
s dr
245-ECS-9001 1824 0
any el
N.T.S
tshal
he pr
Tel: +61 8 9344 6030 A1
Thi
t
REV DRN CHK ENG DATE REV DRN CHK ENG DATE DRAWING No. DESCRIPTION CLIENT
wi
DESCRIPTION DESCRIPTION
Pr
J:
f
t