Equipment assembly
Equipment debugging
This machine is mainly used for automatic forming of plane mask: the whole roll of cloth is driven by
roller after being unrolled, and the cloth is automatically folded and wrapped.The bridge of the nose strip is
pulled and unrolled in a single roll, cut at a fixed length and then imported into the edge of the bag cloth. The
two sides are welded to the seal by ultrasonic welding, and then through the ultrasonic side seal, through the
cutting knife cutting molding;The mask is transported to two mask lug welding stations through an assembly
line, and the mask is finally formed through ultrasonic welding.When the mask is made, it is delivered to the
flat line by an assembly line for collection.
• Function description
Unwinding
Distributary
mechanism Ear belt spot
Mechanism The second
Forming welding
delivery line
mechanis
m
Welding slicing
mechanism
Aluminum
section Aluminum
frame section
The first
Control frame
delivery Collecting
Cabinet line line
Equipment assembly
Equipment size::6850mm(L)×3600mm(W)×1900mm(H);
Appearance color: RAL9003,Follow this standard unless otherwise specified
Equipment weight: ≤5000kg, ground load ≤500KG/m2;
POWER:Machine 220VAC±5﹪,50HZ,Rated power9KW;
Equipment weight: ≤5000kg, ground load ≤500KG/m2;
Compressed air: 0.5-0.7mpa, compressed air flow : about 300L/min;
Operating environment: temperature 10 ~ 35℃, humidity 5-35%HR, no
combustible, corrosive gas, no dust (cleanliness not less than 100,000).
• Butt joint of material rack unit and sheet making unit
They have to be on the same level After docking, lock the anchor, adjust the levelness
and lock the connecting block of the two units
• The distribution table is connected with the film making unit
The spacing between the two ensures that the mask can
easily enter the mask tray without affecting the
operation of the mask conveyor belt
将传送带放进
Place the
定位销内Place
theconveyor
conveyor
belt
beltinto thethe
into
locating pin
locating pin
Melt-
blown
fabric
Outer
non-
woven The
fabric bridge of
the nose
Inner
non-
woven
fabric
公司概况
1.2.Slicing unit
Pressure
molding Trimming
Folded Material
section and cutting
Transport structure Folded stacking
mechanism mechanism
mechanis 2 structur mechani
of bridge of e1 sm
m
nose
公司概况
1.3.Separate material transfer unit
Push
No. 2 Ear belt mecha
welding working nism 2
station conveyor
belt
Separation
No. 1 ear belt mechanism
welder station
conveyor belt
Pushing
mechanism 1
公司概况
1.4.Lug spot welding unit Ear tape
transfer
mechanis
m
Lug
welding
mechanis
m
Ear Conveyor
band belt
leveling
口罩下 Conveyo
料机构 r belt
Mask
feeding
mechan
Ear band
ism
cutting
mechanis
m
2.Debugging procedures of mask machine
Material
material bordure
feeding folding
installation debugging
adjustment
切刀效果及
Effect 位置调试
Size adjustment Adjustment Embossing
adjustment of bridge of of cutter debugging
the nose effect and
position
Material Length
flatness adjustment The end
adjustment of ear band
2.1feeding
Attention should be paid to feeding:After tearing off the protective film of the
material, it is necessary to check whether the raw material has quality problems and
whether there is fault and other phenomena. The three raw materials shall be
installed according to the materials and materials on the schematic diagram, and
the rotary shaft shall be fixed after installation.
2.2Threading the material
Knife wheel
Folding structure
Trimming wheel Guide plate
Guide wheel
Welding die head
steps:
1. The folding mechanism
shall be specified in
accordance with this size
requirement
2. Pass the cloth through
130 the folding mechanism and
8
15 8 straighten it out
12 15
15 8
8
8 15
2.4Trimming debugging
steps:
1. Install the guide plate on
the material
2. Ensure the materials on
both sides of the guide
plate are as uniform as
possible
3. Boot and start the
package edge mechanism
to make the material fold in
naturally
Trimming mechanisms 4. Make sure the width of
the mask is 95±2mm. If the
mask is too wide, manually
adjust the opening width of
the lower edge wrapping
mechanism.
2.4Embossing debugging
steps:
1. Turn on the
ultrasonic wave and
Adjust the outer hexagon screw start the slicer
2. Loosen the inner
hexagon screw and
rotate the outer
hexagon screw
3. Observe the
embossing effect to
ensure the
embossing effect
and uniformity
4. After the effect is
confirmed, lock the
hexagon socket
screw
2.5Adjustment of cutter effect and position
Steps:
1. Start the equipment and
slowly rotate the outer
hexagon screw to adjust the
cutter to cut off the product
2. Adjust the presswork shaft
Adjust the outer hexagon screw gear to ensure that the
embossing position is
consistent with the cutting
position. The presswork shaft
fine-tuning rotates clockwise, the cutting
position is forward, and the
presswork shaft rotates
Pressure shaft gear counterclockwise
3. If the position deviation is
not large, the adjustable fine-
tuning mechanism can fine-
tune the cutting position
2.6Effect adjustment of bridge of the nose
Steps:
1 2 3 1. First loosen screw 1, 2, 3, and pass the
bridge of the nose through the traction
链条
wheel
The and the cutter wheel
chain
2. Remove the chain, manually rotate and
cut, and rotate the outer hexagon screw
to ensure that the bridge of the nose
tendon can be cut normally and the
screw can be locked
3. Put up the chain, start the machine
and test to confirm whether the position
of the bridge rib is correct. If it is
misaligned and cheap, remove the chain
and adjust the rotation Angle of the gear
4. Press the material with the block piece,
and the pressing point is 10~15mm away
from the discharging port, so that the
bridge rib has enough support points to
move. If the pressing point is too close,
the bridge bar will fly out, and if the
pressing point is too far away, the bridge
rib will not be able to move to the
discharging port
5. In order to ensure that the bridge rib
passes through the predetermined
position correctly, flexible materials can
be used as the guide groove
2.6Size adjustment
Steps:
1. The size of the mask can
be adjusted by adjusting the
tightness of the traction
wheel
2. Adjust the damper to
control the tightness of the
material and adjust the size
of the mask
3. Ensure the length of the
mask is 175±2mm
Steps:
1. Adjust the positions of the three
materials to ensure that the first
layer and the second layer coincide,
and the distance between the two
sides of the third layer is equal
2. Adjust the damper on the
material rotation shaft to ensure
smooth rotation of each material
Materia
l
position
adjustm
ent
mechan
ism
damper
2.8Length adjustment of ear band
Steps:
1. Adjust the travel of the
telescopic cylinder to ensure
the length of the ear band is
160±2mm, and ensure the
left and right sides are equal
This chapter mainly talks about the common problems of mask Here are based on the experience of the discussion, learning from
machine equipment. Through this chapter, it is hoped that each other.If there are shortcomings and mistakes, I hope you have
maintenance or operation personnel can quickly and accurately the courage to correct, the content, for reference only.
judge the problem points and quickly solve them.Improve
production efficiency.
• Mask embossing is not clear
1、正常情况下蓝色框内的
显示数值不得>20.00
2、检查超声波是否开启
3、检查超声波是否报警,
若报警可根据超声波报警
代码进行处理
超声波异常
Counterclockwise for
loose, more fuzzy
embossing.
Use visual
inspection to see if
the cutter has a
rolled edge.
Gently touch the
cutter blade of the cutter
with your hand. If
there is a slight
grinding feel, it
indicates that the
cutter is worn and
needs to be
replaced.
• The mask is not cut off
Steps:
1. First loosen screw 1, 2, 3, and pass the
1 2 3 The chain bridge of the nose through the traction
wheel and the cutter wheel
2. Remove the chain, manually rotate
and cut, and rotate the outer hexagon
screw to ensure that the bridge of the
nose tendon can be cut normally and
the screw can be locked
3. Put up the chain, start the machine
and test to confirm whether the position
of the bridge rib is correct. If it is
misplaced, remove the chain and adjust
the rotation Angle of the gear
The bridge of the nose line and 4. Press the material with the block
the cutter bite too loose, the piece, and the pressing point is
bridge of the rib can not send 10~15mm away from the discharging
out, need to adjust the cutter port, so that the bridge rib has enough
and roller support points to move. If the pressing
point is too close, the bridge bar will fly
out, and if the pressing point is too far
away, the bridge rib will not be able to
move to the discharging port
5. In order to ensure that the bridge rib
passes through the predetermined
position correctly, flexible materials can
be used as the guide groove
• The incision position of the mask is deviated from the position