GBL-GT-22530
Interconnection Of New 380/132KV BSP, Al-Buhairah With 132KV
Tabuk Network
NPCC Email GBL Response
1) Particle Size Distribution report for Borehole # Noted. It will be rectified accordingly.
3A, 4A, 10A, 11A, 12A, 14A, 16A, 20A, 1B, 2B, For boreholes 4A, 20A & 14B, the first SPT is
3B, 5B, 7B, 9B, 11B, 14B, 17B & 18B is missing performed at 0m depth, and the rock layer starts
in the report. Furthermore, if any sample from 1.5m depth, so as per your comment Sieve
depth is mentioned as zero, it needs to be analysis cannot be performed at 0m depth, that’s
changed to either 1 or 1.5m. why there are no sieve results for these boreholes.
2) Total depth of boring mentioned in Borehole
log for tower # 21A & 21B is 12m although
their actual boring depth is 15m as per Noted. It will be rectified accordingly.
borehole location plan and design parameters
table.
Coordinates are still
3) Coordinates for tower # 17B in borehole log wrong in BH log
Noted. It will be rectified accordingly.
are inaccurate.
6) Layer # 3 mentioned in BH log for tower # 17A It was mistakenly written as a layer. The log will be
is not reported in design parameters table. rectified accordingly. Total BHs are still
40.0
7) In heading no. 4.1.2 total boreholes needs to We have mentioned the number of sieve analysis
be changed to 42. tests. It will be revised accordingly.