CLARIFICATION - 1

With reference to OPTCL Tender TS-E26, we require below mentioned clarification:

S. Tech Description as mentioned in TS Clarification Required OPTCL Replied Remarks


No specific Pre bid clarification
. ation Pkg(II).
No.
1. TS-E26, Ground Clearance - 220kV The Ground clearance provided Shall be provided by We are
i) 7.015 m ref cl no 4.1.4. Table pg 34 of 83. in TS is different in various OPTCL in the event of considering
ii) 7.230 m ref cl no table C-26 pg 73 of 83. clauses creating ambiguity. award of the contract. 7.23 m as per
Hence we are proposing As per TS.
IS/CBIP manual the Ground
Clearance shall be 7.015 m & We
are Considering 7.23 m.
Kindly confirm.
2. TS-E26 Mid span clearances- 220kV The Mid span clearance provided Shall be provided by We are
i) 8.1 m ref cl no 5.1.21.iv pg 47 of 83. in TS is different in various OPTCL in the event of considering
ii) 8.5 m ref cl no Table 26 pg 73 of 83. clauses creating ambiguity. award of the contract. 8.5 m, as per
Hence we are proposing As per IS code/CBIP
IS/CBIP manual the Mid span manual.
clearance shall be 8.5 m & We
are Considering 8.5 m.
Kindly confirm.
3. TS-E26 i) An allowance of 4% of the max sag shall be provided to As per CBIP manual 150mm sag Max. Sag as per latest We are
account for errors in stringing, ref cl no 5.1.21.9.a, pg 46 of error is recommended. However IS for tower design. considering
83. with 4 % of sag, sag error shall be 150mm sag
530mm. with 530mm sag error, error as per cl.
all the tower height shall be 3.6.2.1 of CBIP
increase by 380mm. manual.
Kindly confirm.
4. TS-E26 Minimum clearance between the subject power line and any other power As per CEA regulations on safety
line crossing shall not be less than 7000 mm, ref cl no 5.1.21.9.b, pg 46 and Electricity Supply-2010 Min
of 83. clearance is 4.58 m .Kindly clarify
& confirm.