This inspection checklist is for columns and walls for the Eastern Regional Hospital Phase 1 project. It contains 20 items to check regarding dimensions, positioning, formwork, reinforcement bars, concrete placement, and accessibility. Inspectors mark each item as pass, fail, or not applicable and provide comments on any failures. Engineers overseeing electrical and mechanical work must also sign off.
This inspection checklist is for columns and walls for the Eastern Regional Hospital Phase 1 project. It contains 20 items to check regarding dimensions, positioning, formwork, reinforcement bars, concrete placement, and accessibility. Inspectors mark each item as pass, fail, or not applicable and provide comments on any failures. Engineers overseeing electrical and mechanical work must also sign off.
This inspection checklist is for columns and walls for the Eastern Regional Hospital Phase 1 project. It contains 20 items to check regarding dimensions, positioning, formwork, reinforcement bars, concrete placement, and accessibility. Inspectors mark each item as pass, fail, or not applicable and provide comments on any failures. Engineers overseeing electrical and mechanical work must also sign off.
DATE: INSPECTION NO: Area of work inspected: FOOTING ID: INSPECTOR: COMPANY: Inspection Comments/Notes: If inspection result pass DATE: SIGN: If inspection results failed DATE: SIGN:
F=Fail=non complaince with approved plans and documentation
P=Pass=Complaince with approved plans and documentation N/A= Non applicable
ITEM DESCRIPTION P F N/A Comment (reason for decision)
1 Check dimension of columns with approved drawing. (L * B X*H) 2 Check orientation and position of column 3 Check column/pedestrial position with axial drawings 4 Formwork material should be strong enough to withstand against load of concrete 5 Formwork should be water tight 6 Check verticality of the column shutters 7 check the right angles at the corners of column shutters 8 Formwork support should be strong enough to withstand load of concrete 9 Check the number, dimension and position of bars 10 Check all reinforcement bars are free from crack and clean 11 check all rebars properly burnt and fixed 12 Check Leg-of column properly provided and fixed 13 check spacing for column stirrup 14 Check binding wire properly fixed 15 Check cover blocks properly placed at sides of column 16 Stirrup lock should be as per standard drawings and positioned in opposite directions 17 check for cleaning of pieces of binding wires,nails, dirt, dust, wooden pieces etc removed 18 Check accessibility to column 19 Check tools, machinery such as vibrator, shovel, trowel and other necessary items available 20 Check specifiacation of concrete 21 Check placing and compacting of concrete as per specification 22 check Electrical works 23 check Mechanical works ( plumbing, AC ducts & pipes ) SIGNATURE COMMENT Electriacal Eng: