04 Februari 2020

RENCANA PEMBANGKITAN DAN PENYALURAN


SISTEM TENAGA LISTRIK JAWA BALI

######### 5
HARI/TANGGAL : RABU, 5 FEBRUARI 2020

Beban Puncak : 26050 MW 990 Cadangan Pkl 19.00


PEMBANGKITAN YANG TIDAK SIAP OPERASI
PLTA
1 PLTA JTLHR #1 30 PO Pemeliharaan tahunan 05-02-2020 00:00:00 06-02-2020 23:55:00
2 PLTA RAJAMANDALA #1 47 MO Pengisian gas N2 05-02-2020 14:00:00 05-02-2020 19:00:00
PLTG
3 PLTG GILIMANUK 1 130 NC Assesment gasifikasi PLTG Gilimanuk oleh Mitra OEM GE Power 05-02-2020 07:00:00 07-02-2020 23:30:00
4 PLTG MTWAR #4. 2 140 NC Performance test pada beban base load 05-02-2020 09:30:00 05-02-2020 11:30:00
5 PLTG BALI PSRAN #2 18 FO-1 saat ini PLTG unit #2 tdk siap operasi 31-01-2020 12:34:00
PLTDG
6 PLTDG PSRAN B2 #6 47 PO Pemeliharaan 18.000 Jam 06-01-2020 07:00:00 10-02-2020 23:59:00
PLTGU
7 PLTGU MTWAR #1 .0 204 FO-1 (OMC) Recovery pasca GITET pekerjaan har rutin Bay(Diameter 3) 22-12-2020 15:01:00
8 PLTGU GRATI #3 .1 145 FO-3 Keterbatasan pasokan Gas 24-01-2020 00:00:00 06-02-2020 23:30:00
9 PLTGU GRATI #3 .2 145 FO-3 Keterbatasan pasokan Gas 24-01-2020 00:00:00 06-02-2020 23:30:00
10 PLTGU GRATI #3 .0 165 FO-3 Keterbatasan pasokan Gas 24-01-2020 00:00:00 06-02-2020 23:30:00
11 PLTGU CLGN #1 .2 212 FO-3 Keterbatasan pasokan Gas 25-01-2020 17:39:00 06-02-2020 23:30:00
12 PLTGU PRIOK #3 .2 235 PO CI, dapat dilakukan setelah PLTGU Priok 4.2 masuk normal 30-01-2020 00:00:00 19-02-2020 00:00:00
13 PLTGU GRBRU #1 .0 175 PO Mean Inspection (ME) 03-02-2020 00:00:00 27-02-2020 23:30:00
14 PLTGU GRBRU #1 .2 100 PO Turbine Inspection + Module Preheater (TI + Module Preheater) 03-02-2020 00:00:00 27-02-2020 23:30:00
15 PLTGU MKRNG #2 .2 237 FO-1 Gangguan panel eksitasi, karena ditemukan hotspot dibagian panel 03-02-2020 11:58:00
16 PLTGU MKRNG #2 .03 70 FO-1 Terkait GT-2.2 MKRNG trip 03-02-2020 12:07:00
PLTP
17 PLTP DIENG #1 45 PO Pemeliharaan tahunan 01-02-2020 00:00:00 06-03-2020 23:55:00
PLTU
18 PLTU TBROK #3 110 FO-3 Ketersediaan energi primer (OMC) 29-10-2019 00:01:00
19 PLTU TJAWAR #2 323 PO Mean Inspection, 13-12-2019 00:00:00 11-02-2020 23:30:00
20 PLTU LONTAR #2 280 FO-2 Gangguan Generator 28-12-2019 00:00:00
21 PLTU ADIPALA #1 615 PO Serious Inspection min (SE-) 06-01-2020 00:00:00 17-02-2020 23:59:00
22 PLTU INDRAMAYU #3 290 FO-1 SST Trip 06-01-2020 05:42:00
perbaikan :HP Bypass Valve, Hot air gate Mill C & E, IV 3 & 4 kebocoran steam,
23 PLTU PAITON #9 615 MO Line Drain spray Superheater, Line Filling Feedwater to BCWP HE dan Drain pipe 30-01-2020 00:00:00 05-02-2020 23:30:00
HPH 1 to HPH 2 leakstrough
24 PLTU SRLYA #7 575 ME Penggantian Pipa Area Primary Superheater dan Assesment Boiler 01-02-2020 00:00:00 07-02-2020 23:59:00
25 PLTU PAITON #2 370 NC Performance Test Pada Beban Maksimum 05-02-2020 08:00:00 05-02-2020 16:00:00
26 PLTU PEC #8 610 NC Routine plant test of main turbine valve, unit dibebani maksimum 05-02-2020 10:00:00 05-02-2020 14:00:00
27 PLTU PEC #7 610 FO Gangguan Bottom Ash 01-02-2020 12:12:00

PEMBANGKITAN YANG DERATING


1 PLTGU PRIOK #3 .0 250 125 PD GT 3.2 PO 30-01-2020 00:00:00 19-02-2020 00:00:00
2 PLTP SALAK #2 57 52 MD Pemeliharaan FCT Cell no 3 & 4 05-02-2020 08:00:00 05-02-2020 11:00:00
3 PLTP WYNDU #1 112 97 MD Turbine stem free test 05-02-2020 08:00:00 05-02-2020 08:30:00
4 PLTU PEC #8 610 450 FD De-Slaging Boiler Online 05-02-2020 00:00:00 05-02-2020 03:00:00
5 PLTU PEC #3 813 650 FD De-Slaging Boiler Online 05-02-2020 00:00:00 05-02-2020 03:00:00
6 PLTU TJATI #3 661 450 MD Trevi test area superheater outlet 05-02-2020 00:30:00 05-02-2020 01:30:00
7 PLTU TJATI #3 661 500 MD Trevi test area stem drum 05-02-2020 02:00:00 05-02-2020 08:00:00
8 PLTU SRLYA #8 590 470 MD pressure boiler sesuai rekomendasi sec 24-05-2019 17:30:00
9 PLTP KMJNG #5 33 28 FD ada anomali pada turbin 28-08-2019 05:00:00
10 PLTP KARAHA #1 18 11 FD Sumur 'T32' ditutup karena chassing sudah tipis, tidak sesuai standard 18-11-2019 19:24:00
11 PLTP SALAK #6 61 55 FD Gangguan vibrasi turbin generator 03-12-2019 17:40:00
12 PLTP DIENG #1 45 40 FD Pasokan (tekanan) panas bumi berkurang 06-01-2020 12:30:00

Pembatasan pembebanan PLTU Pacitan Unit #1 di SUTT PLTU Pctan - Ngtdi #2


13 PLTU PACITAN #1 280 260 FD 22-01-2020 18:56:00
sebesar 1100 A (keterbatasan penghantar dan aksesoris pada Tower Emergency)

Pembatasan pembebanan PLTU Pacitan Unit #1 di SUTT PLTU Pctan - Ngtdi #2


14 PLTU PACITAN #2 280 260 FD 22-01-2020 20:55:00
sebesar 1100 A (keterbatasan penghantar dan aksesoris pada Tower Emergency)
15 PLTU PEC #8 610 600 FD Kendala flue gas exit temparature tinggi 31-01-2020 19:40:00
16 PLTU PEC #3 813 800 FD Gangguan temperature exit gas tinggi 31-01-2020 19:50:00
Temuan hotspot BGBRU-SNTUL#2. GI BGBRU minta pembatasan transfer
17 PLTU PRATU #1 323 290 FD 03-02-2020 23:45:00
BGBRU-SNTUL <800A.
Temuan hotspot BGBRU-SNTUL#2. GI BGBRU minta pembatasan transfer
18 PLTU PRATU #2 323 290 FD 03-02-2020 23:45:00
BGBRU-SNTUL <800A.
Temuan hotspot BGBRU-SNTUL#2. GI BGBRU minta pembatasan transfer
19 PLTU PRATU #3 323 290 FD 03-02-2020 23:45:00
BGBRU-SNTUL <800A.

PEMBANGKITAN STEAM UNIT YANG RS


1 PLTU GRSIK #1
2 PLTU GRSIK #2
3 PLTGU TBROK #1 .0
4 PLTU MKRNG #5
5 PLTGU PRIOK #2 .0

CATATAN:
Diluar peak, PLTU Batu Bara >200 MW diberi spinning reserve 2.5% DMN

BOPS/FML/04-009A
AREA JAWA TENGAH & DI YOGYAKARTA
RENCANA OPERASI HARI/TANGGAL : RABU, 5 FEBRUARI 2020

Jam 00.30 01.00 01.30 02.00 02.30 03.00 03.30 04.00 04.30 05.00 05.30 06.00 06.30 07.00 07.30 08.00 08.30 09.00 09.30 10.00 10.30 11.00 11.30 12.00 12.30

PLTA ss Ungaran 1-2 & T Jati 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 29 29 29 29 29 3 3


PLTA ss Ungaran 3 & Pedan 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
PLTA MRICA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60

PLTU TJATI #1 644 644 644 644 644 644 644 644 644 644 644 644 644 644 644 644 644 644 661 661 661 661 661 644 644
#2 644 644 644 644 644 644 644 644 644 644 644 644 644 644 644 644 644 644 661 661 661 661 661 644 644
#3 450 450 450 500 500 500 500 500 500 500 500 500 500 500 500 500 590 645 661 661 661 661 661 645 645
#4 645 645 645 645 645 645 645 645 645 645 645 645 645 645 645 645 645 645 661 661 661 661 661 645 645

PLTU RMBNG #1 273 273 273 273 273 273 273 273 273 273 273 273 273 273 273 273 273 273 273 280 280 280 280 273 273
#2 273 273 273 273 273 273 273 273 273 273 273 273 273 273 273 273 273 273 273 280 280 280 280 273 273

PLTU CLCAP #1 233 233 233 233 233 233 233 233 229 229 227 141 208 233 274 274 274 274 274 281 281 281 281 274 274
#2 233 233 233 233 233 233 233 231 141 141 141 141 141 143 233 274 274 274 274 281 281 281 281 274 274
#3 480 390 307 307 307 307 307 367 457 547 599 599 599 599 599 599 599 599 599 614 614 614 614 599 599
#4 773 916 901 601 473 473 473 473 473 773 916 916 916 916 916 916 916 916 916 945 945 945 945 916 916

PLTU ADPLA #1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

PLTGU 1 TBROK 1.1 (OC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0


TBROK 1.2 (OC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TBROK 1.3 (OC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TBROK 1.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TBROK 1.1 (CC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TBROK 1.2 (CC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TBROK 1.3 (CC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

PLTGU 2 TBROK 2.1 (OC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0


TBROK 2.2 (OC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TBROK 2.3 (OC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TBROK 2.0 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 48 48 48 65
TBROK 2.1 (CC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TBROK 2.2 (CC) 93 93 93 93 93 93 93 93 93 93 93 93 93 93 93 93 93 93 93 93 93 70 70 70 70
TBROK 2.3 (CC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30 30 30 70

PLTU TBROK #1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

PLTP DIENG #1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

(*) Pembangkitan Area-3 4810 4863 4766 4516 4387 4387 4387 4445 4441 4831 5024 4938 5005 5032 5163 5204 5294 5348 5440 5513 5513 5523 5523 5358 5476
(**) Beban Area-3 3220 3188 3155 3120 3080 3053 3056 3089 3233 3396 3511 3511 3276 3216 3360 3484 3636 3726 3792 3820 3850 3859 3868 3729 3702
Selisih (*) - (**) 1590 1675 1611 1396 1307 1334 1331 1356 1208 1435 1513 1427 1729 1816 1803 1720 1658 1622 1648 1693 1663 1664 1655 1629 1774
Cadangan Seketika 108 65 61 94 87 87 87 90 90 109 43 39 42 44 37 25 30 0 0 0 0 0 0 0 0
Cadangan Putar 677 624 722 972 1100 1100 1100 1042 1046 656 463 549 482 455 324 283 193 139 73 0 0 0 0 139 139
BDSEL - UNGAR 1665 1437 1462 1398 1576 1695 1902 1938 1707 1636 1735

BOPS/FML/04-009B 39 - 8
AREA JAWA TENGAH & DI YOGYAKARTA
RENCANA OPERASI HARI/TANGGAL : RABU, 5 FEBRUARI 2020

Jam 13.00 13.30 14.00 14.30 15.00 15.30 16.00 16.30 17.00 17.30 18.00 18.30 19.00 19.30 20.00 20.30 21.00 21.30 22.00 22.30 23.00 23.30 24.00 Rata-2

PLTA ss Ungaran 1-2 & T Jati 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 6


PLTA ss Ungaran 3 & Pedan 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
PLTA MRICA 60 60 60 90 90 90 90 120 150 180 180 180 180 180 180 150 120 90 0 0 0 0 0 48

PLTU TJATI #1 644 661 661 661 661 661 661 644 644 644 644 644 644 644 644 644 644 644 644 644 644 644 644 648
#2 644 661 661 661 661 661 661 644 644 644 644 644 644 644 644 644 644 644 644 644 644 644 644 648
#3 645 661 661 661 661 661 661 645 645 645 645 645 645 645 645 645 645 645 645 645 645 645 645 596
#4 645 661 661 661 661 661 661 645 645 645 645 645 645 645 645 645 645 645 645 645 645 645 645 648

PLTU RMBNG #1 273 280 280 280 280 280 280 273 273 273 273 273 273 273 273 273 273 273 273 273 273 273 273 274
#2 273 280 280 280 280 280 280 273 273 273 273 273 273 273 273 273 273 273 273 273 273 273 273 274

PLTU CLCAP #1 274 281 281 281 281 281 281 274 274 274 274 274 274 274 274 274 274 274 274 274 274 233 233 259
#2 274 281 281 281 281 281 281 274 274 274 274 274 274 274 274 274 274 274 274 274 274 233 233 249
#3 599 614 614 614 614 614 614 599 599 599 599 599 599 599 599 599 599 599 599 599 599 599 599 556
#4 916 945 945 945 945 945 945 916 916 916 916 916 916 916 916 916 916 916 916 916 916 916 616 857

PLTU ADPLA #1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Pemakaian Gas TBROK 50 bbtu
PLTGU 1 TBROK 1.1 (OC) 0 0 0 0 0 0 0 0 0 70 93 93 93 93 93 93 70 0 0 0 0 0 0 15
TBROK 1.2 (OC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TBROK 1.3 (OC) 0 0 0 0 0 0 0 0 0 70 93 93 93 93 93 93 70 0 0 0 0 0 0 15
TBROK 1.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TBROK 1.1 (CC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TBROK 1.2 (CC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TBROK 1.3 (CC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Pemakaian CNG TBROK 14 bbtu
PLTGU 2 TBROK 2.1 (OC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TBROK 2.2 (OC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TBROK 2.3 (OC) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TBROK 2.0 65 65 65 65 65 65 65 65 65 116 126 126 126 126 126 126 106 45 45 45 45 45 45 62
TBROK 2.1 (CC) 0 0 0 0 0 0 0 0 0 70 93 93 93 93 93 93 70 0 0 0 0 0 0 15
TBROK 2.2 (CC) 70 70 70 70 70 70 70 70 70 93 93 93 93 93 93 93 93 93 93 93 93 93 93 87
TBROK 2.3 (CC) 70 70 70 70 70 70 70 70 70 93 93 93 93 93 93 93 70 0 0 0 0 0 0 31

PLTU TBROK #1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

PLTP DIENG #1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

(*) Pembangkitan Area-3 5476 5615 5615 5645 5645 5645 5645 5536 5566 5902 5981 5981 5981 5981 5981 5951 5809 5438 5348 5348 5348 5266 4966 5310
(**) Beban Area-3 3829 3960 3932 3914 3877 3845 3809 3779 3809 3915 4114 4305 4320 4331 4292 4231 4135 4002 3809 3682 3546 3473 3365 3671
Selisih (*) - (**) 1647 1655 1683 1731 1768 1800 1836 1757 1757 1987 1867 1676 1661 1650 1689 1720 1674 1436 1539 1666 1802 1793 1601 1639
Cadangan Seketika 0 0 0 0 0 0 0 0 0 7 0 0 0 0 0 0 7 0 0 0 0 23 54 26
Cadangan Putar 139 0 0 0 0 0 0 139 139 185 139 139 139 139 139 139 185 139 139 139 139 221 521 317
BDSEL - UNGAR 1701 1596 1731 1917 1950 1878 1489 1486 1351 1452 1872 1536

BOPS/FML/04-009B 39 - 17