Download as pdf
Download as pdf
You are on page 1of 1
i—__» 7 3 a —f ion 15 4. Top Tank 2. Bottom tank 3. Valve 4. Pneumatic Cylinder-Valve Control - ON/OFF (20-25 cycles/Hour) 5. Full Switch Sensor Control Level actuate the Pneumatic Cylinder & and open the Valve 3 5. _ Empty Sultch Sensor Control Level actuate the Pneumatic Cylinder 4 and close the Valve 3 7. Gravity Ashes Discharge 8. AirPressure inlet Hole 1X inches. 8. Ashes removed out by air compressed (6 Bar. 10. Pipeline Ashes Out. ‘When the Top Tank (1) is full ashes, the switch sensor contro! level (5), open the Valve (3) and discharge the ashes tothe Bottorn Tank (2). ‘Ater the Top Tank (1) is empty, the switch sensor level control (6 lose the Valve (3) and open the alr pressure inet (8). State! ‘Now the Bottom Tank (2) is full (ashes) and beginning the inlet air compressed process at 6 Bar (8) to remove all ashes out of the Tank (2) through a Pipeline (20) ‘Mot nthe actual system installed the hot ashes are med with Sand Grains and when the inlet alr compressed beginning at 6 Bar, they have a Shot Blasting effect against tothe internal vessel wall, ‘The second problem is, when the Bottom Tank is with no pressure and I in state process of receive ashes from the gravity top tank, some of ‘these ashes willinadvertently enter in the air inlet tube

You might also like