Painting Work, Housekeeping & Scrap Yard Schedule
Painting Work, Housekeeping & Scrap Yard Schedule
7 BCN-8 HEAD PULLEY AREA AND BCN-9 TAIL PULLEY AREA 07.09.2013
12 TUNNEL AREA
25 TG FLOOR-9 METER
26 CONTROL ROOM -I
12.10.2013
28 TG FLOOR-4 METER 12.10.2013
30 TG FLOOR-0 METER
31 CABLE GALLERY