TARGET DATE FOR VEGETATION REMOVAL

S.No AREA TRAGET DATE

1 Main Gate, Car Paring Assembly area 11.08.2013

2 Switch yard , Transformer area. 14.08.2013

Coal Yard Ground near Pump House & Boundary Wall


3 Surrounding Area(with Chemical Treatment) 15.08.2013

Chp control room to conver belt ph-2 secondary, LDO


4 17.08.2013
Tank Surrounding Area
5 Ph-2 Chiminey , silo surround area 22.08.2013

6 Front of Stores ,cooling tower area. 25.08.2013

7 DM Plant, RO Plant,Pump house area 27.08.2013

8 Scrap yard, canteen boundary area. 30.08.2013

TARGET DATE FOR SCRAP COLLECTIN & SEGREGATION


S.No AREA TRAGET DATE
1 Bioler - 1 , Boiler- 2,& Silo-1 & 2 area 08.08.2013

2 Boiler - 3 & silo 1,2 ( ph-2) area 12.08.2013

3 TG floor & Other area 14.08.2013

4 CHP area 17.08.2013

5 Stores,cooling tower & Dm Plant area 20.08.2013


TARGET DATE FOR PAINTING WORK(AREA-WISE)
S.No AREA TRAGET DATE

1 Ph# 1 silo 1 & 2 ESP & Chiminey.


12.05.2013
2 Weigh Bridge, DG Set

3 Boiler# 1 Surrounding Area 19.08.2013

4 Boiler# 2 Surrounding Area 26.08.2013

5 TIPPER TROLLEY AND BUNKER AREA


02.09.2013
6 BCN-12 HEAD AND TAIL PULLEY AREA

7 BCN-8 HEAD PULLEY AREA AND BCN-9 TAIL PULLEY AREA 07.09.2013

8 BCN-1 HEAD PULLEY AREA (JT top)

9 BCN-2 TAIL PULLEY AREA+JT

10 BCN-2 HEAD PULLEY AREA 15.09.2013

11 CHP COAL SHED AREA

12 TUNNEL AREA

13 BCN-3 HEAD PULLEY,TAKE OFF PULLY AND AREA

14 PRIMARY CRUSHER FLOOR


21.09.2013
15 BCN-4 TAIL PULLEY AREA

16 BCN-4 HEAD PULLEY AREA

17 RBF-1 AREA (BC-6)

18 PRIMARY VIBRATING SCREENS FLOOR

19 SECONDARY CRUSHERS FLOOR


31.09.2013
20 SECONDARY SCREENS FLOOR

21 SECONDARY CRUSHER HOUSE GROUND FLOOR

22 BCN-5 HEAD AND TAIL PULLEY AREA

23 CHP CONTROL ROOM AND MCC ROOM 03.10.20.13

24 LDO STORAGE AREA 06.10.2013

25 TG FLOOR-9 METER

26 CONTROL ROOM -I

27 PACKAGE A.C UNIT ROOM

12.10.2013
28 TG FLOOR-4 METER 12.10.2013

29 TG FLOOR- 4 METERS HT & BATTERY ROOM

30 TG FLOOR-0 METER

31 CABLE GALLERY

32 WORK SHOP .STORES,DM PLANT RO PLANT 14.10.2013

33 Cooling tower 17.10.2013

34 KSK Admin office, OEGI Admin Office, Security Office 30.10.2013