Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Integrated Mining Company

Indragiri Hulu-Riau, April 27, 2021


Ref. No. O11/FCO/EPS-GDKJIV/2021

Messrs.
PT. ZIRKON
UP. Anas Khairudin
Cq. Yusnan Yusuf

FULL CORPORATE
OFFER GAR 5600-5800
Coal origin: JAMBI province, Sumatera

We, hereby on behalf of Seller, Miner, and Concession bolder of IUP-OP, would like
to confirm to you our suppliability in form of offer of the steam coal in our supply
chain management system:

Product: Coal with origin of Jambi province, Sumatra. Name of Mine: PT. Bumi Indo
Power.

Quantity: 30,000 MT (+/-10%)

Loading Port: Jetty PT. Karya Buana Sejahtera, for delivery to Anchorage Kuala
Tungkal, Jambi province, Indonesia.

Coal Specification:

Quality: As per ASTM/ISO

standard: Crushed coal:

Table of Specifications as per ISO Standard:

Specification Typical Rejection Limits

Indicative Total Moisture (ARB) 25% Above27%


Inherent Moisture (ADB) 17% -
Ash (ADB) 8% Above 10%
Volatile Matter (ADB) 35-45% -
Fixed Carbon By difference -
Integrated Mining Company
Total Sulphur (ADB) 0.8% Above 1,0%
HGI (index) 45-55 -
NET Calorific Value (AS 5800 Kcal/Kg Below 5600 Kcal/Kg
RECEIVED BASIS): NAR

Size (0 - l00mm) 95% min -

AFT (IDT) Reducing Atmosphere min 1050 deg C -

Price: FOB Barge Jetty PT. Karya Buana Sejahtera, Jambi province at
IDR 7 0 0,000/MT, Spec Guarantee, Bonus/Penalty
applies. Bonus ceiling at NAR 5000.

Terms of Payment:
5-4-1:
• 50% within 3 banking days after mutual contract signing.
• 40% when the cargo is 100% ready at the jetty for barge loading.
• 10% when complete documents are available (SKAB, COA
Barge, etc.),

Thank you.

You might also like