Karthick Resume

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

RESUME

KARTHICK PANDIYARAJ
Metallurgy Engineer - Quality Assurance & Business Development

JOB EXPERIENCES
PROFILE
2019 - Till Date A-Star Testing and Inspection Pvt. Ltd
Name
Assistant Manager - Quality
Karthick Pandiyaraj
Internal Auditor - ISO 9001:2015

Date of Birth EDUCATION


December 12, 1984
2009- 2011 PSG College of Technology, Coimbatore
Address M.E. (Industrial Metallurgy)
No.6, kuppusamy naicker street, 2006 - 2009 PSNA CET - Anna University
Poothapedu, Chennai, India - B.E. (Mechanical Engineering)
600116
2002 - 2004 CHRISTIAN POLYTECHNIC COLLEGE
Phone
Diploma in Mechanical Engineering
+91 9789116465

Email CERTIFIED COURSES


karthi.theja@gmail.com
ISO 9001:2015 Internal Auditor Certification No.PD/2021-22/3226
BOSIET-EBS Certificate No.: 91225700271119404

NDT Level II (VT, PT, MPT, UT & RT)


AUTOCAD 2007

SOCIAL MEDIA Piping software

PROFESSIONAL MEMBERSHIP
LinkedIn
www.linkedin.com/in/karthick- ASNT Membership ID: 335331
pandiyaraj
SKILLS
Metallurgist CAPA (Corrective Action and Preventive Action)
Non - Destructive Testing GAP analysis
Project management Pre-bid meetings, kick-off meetings and sub-contracting
Quality Assurance MS Office & SAP
Root cause analysis Codes & Standards - ASTM, ASME, API, IBR, AERB &
Budgeting & Cost Control BPVC
Contract Review ISO 9001:2015, ISO 14001:2015 & ISO 45001:2015
EXPERIENCE
A-STAR TESTING AND INSPECTION PVT. LTD PSNA COLLEGE OF ENGINEERING & TECHNOLOGY
Assistant Manager - Aug 2019 - Till date Assistant Professor Jan 2012 - Nov 2012

Document preparation & verification for MIS. Conducting lectures and preparing the study
Conduct internal audit periodically to maintain material for graduate students.
quality. Keeping abreast of developments in their field by
IMS System implementation, Internal auditor & reading current literature and participating in
Management Representative for Second and third professional conferences.
party audits. Initiate, facilitate, and moderate classroom
Root cause analysis and corrective and preventive discussions.
action implementation. Engineering drawing and interpretation using
Conversant with proposal document management, software.
Quality assurance and overall project management
of EPC projects. RANGAMMAL STEELS AND MALLEABLES
Contract Review and proposal preparation. Melting supervisor Jan 2006 - Jun 2006
Attending the Pre-bid meetings to understand the
Ensure the metallurgical properties of molten
complete project and assists in proposal.
metal and record production data and maintain
Participating in kick-off meetings and initiate the
the logs.
project.
Handling multiple projects in the areas of Offshore Drain, transfer or remove molten metal from

Rig, FPSO, Thermal power plants, Refineries and furnaces, and pour it into moulds, using hoists

cross country pipeline. and laddles.


Maintain the proper functioning of Induction
NIIT LIMITED furnace ensuring the safety operation.
Senior Executive Oct 2017 - Aug 2019 Conducted failure analysis (fracture and
metallographic) with other research group
Customer relationship management.
members.
Corporate business culture maintenance.
Negotiation skills and Business closure procedure.
Coordinator for quality control auditing system. RANGA FOUNDRY
Corrective and preventive action planning and Production supervisor Aug 2004 - Dec 2005
implementation.
Planning BOM & raw material procurement
schedules for ensuring seamless production
P A COLLEG OF ENGINEERING AND TECHNOLOGY function.
Assistant Professor Mar 2013 - Aug 2017 Planning, execution and maintenance of cupola
Handling the issues in the project related to furnace operations.
metallurgy and manufacturing. Executing cost saving techniques / measures
Coordinator for the accreditation bodies like NAAC and modifications to achieve substantial
and NBA. reduction / Improve Quality / Productivity /
Conducting research activities in collaborating with Reliability at manufacturing with continual
research organization like IISC, banglore. improvement.
Supervising, advising, and mentoring teaching Prepare monthly production planning report
assistants and graduate students. based on marketing schedule.
Mentoring in the basic conceptual and the
engineering drawings.
Participating in faculty and departmental meetings.
PROJECTS
"Rope access painting during the Turn Around shutdown 2022" (Oct 2022 to Dec 2022) - Client: M/s.Nayara
Energy, Vadinar, Gujarat.

"Non Destructive testing works including RT, PWHT, Hardness including supply of all materials and labour
for crude storage tanks including tank pads and associated civil works at Rajasthan refinery complex at
pachpadra (Package-5), Barmer Rajasthan" (Apr 2022 to till date) - Contractor: M/s. Bridge & Roof Co (I)
Ltd. Client: M/s. HRRL

"Carrying out UTG of secondary cycle piping components and NNPV Performing QC
inspection by NDT" (Apr 2022 to till date) - Client: M/s. NPCIL

"Erection of 2x8oo MW STPP of NTPC at Ramagundam" (Dec 2021 to till date) - Client: M/s. NTPC

"The RLA of wind towers of siemens gamesa by PAUT & TOFD method using temporarily suspended
platform at various locations in india" (Oct 2021 - Apr 2022) - Client: M/s. Siemens Gamesa

"Bokaro angul pipeline project" (Feb 2021 to Feb 2022) - Client: M/s. KPTL

"Installation of 36" OD Pipeline of Brahmani River crossing project by Horizontal Directional Drilling
(HDD) Technique and associated works for GAIL India Ltd." (Feb 2021 to April 2021) - Client: M/s. GAIL

"NDT activities in Construction of steel pipeline for Coimbatore City Gas Distribution project for IOCL
Spread-A" (Jan 2021 to Apr 2022) - Client: M/s. IOCL

"PL.101 HASSAN CHERLAPALLI PIPELINE PROJECT SCH - 03" (sep 2020 to Aug 2022) - Client: M/s. HPCL

"PL.101 HASSAN CHERLAPALLI PIPELINE PROJECT SCH - 05" (sep 2020 to Aug 2022) - Client: M/s. HPCL

"Laying of 144 km of 16" Dia pipeline from Tiruvallur to Chitoor pipeline section of IOCL" (Dec 2020 to april
2021) - Client: M/s. IOCL

"PROVISION OF NDT SERVICES FOR OFFSHORE HOOKUP AT CRP FOR BLOCK KG-DWN-98/3 (KG-D6)
LOCATED IN THE KRISHNA GODAVARI BASIN OFF THE EAST COST OF INDIA" (Jan 2020 to mar 2021) -
Client: M/s. McDermott

"Short shutdown and maintenance of TATA Thermal Power Plant, Trombay" (Nov 2019- Feb 2020) - Client:
M/s. Siemens

You might also like