ROOFTOP SOLAR PV PROPOSAL

FOR GHASSAN ABOUD GROUP


Our Business: Solar PV and its Applications
100% comprehensive, fully-integrated design, procurement, installation, project management, commissioning,
maintenance and monitoring solution provided by SMR

SMR Customer
• One – time upfront cost to
• SMR designs, procures, set up the solar PV system, or
installs, commissions and signs a long-term Power
maintains the solar plant Purchase Agreement (“PPA”)
• SMR also provides the with SMR
option to invest 100% of the • Power rate cheaper than
capital required current tariff, leading to
significant savings to you over
the project’s lifetime

We offer you a cost – effective solution with Guaranteed Savings from Day 1
Comprehensive Solar PV Solution
100% comprehensive, fully-integrated design, procurement, installation, project management, commissioning,
maintenance and monitoring solution provided by SMR

Inspection Permitting/ Monitoring &


Installation Commissioning Maintenance
Sample Testing
Procurement Quality Checks
Interconnect permits Periodic Cleaning
Safety Walks
Site Analysis System Design Directly from Grid Synchronization Predictive Monitoring
On-site supervision
Shading manufacturers/ Preventive Checkups
Structural Analysis SOPs
Interconnection vendors Emergency Responses
Plant layout
Equipment Specifications
Placement
Our Business Proposition
We deliver immediate, risk-free savings with no hassle of operations or maintenance

CAPEX/OPEX Model Predictable Supply


We are Solar PV Specialists
• SMR either executes a project • Focus on system reliability and
• Team with a cumulative
on a turnkey basis, or funds safety
experience of over 50MWp
100% of the project with a PPA • Reduced impact from grid
• Worked on 40+ projects
• You save on every unit outages and lower dependence
consumed on diesel generators

Guaranteed Savings Internal Maintenance Team Customized Solution


• Savings over your current • SMR takes full responsibility • Customized solutions that
electricity costs for all O&M work for you
• Long term certainty on • High Uptime Rates • Design that optimizes
electricity prices generation at your premise
Fast Growing Company
We’ve commissioned over 20MWp of ground mount and 9MWp of rooftop solar PV in
India,1.4 MWp in UAE* and over 25MWp in the pipeline based in India and UAE

World Class Design


International validation of mounting structures
design and remote monitoring system
High Quality Components
We only work with Tier 1 component India & Middle East Focus
suppliers, ensuring high system
reliability
Accolades
SMR was recognized as one of India’s Greatest Brands for 2018 – 19 and awarded India’s
Greatest Leaders for 2108 – 19 by AsiaOne at The Taj Land’s End, Mumbai
Accolades
SMR was awarded the “Star of the Industry” by the Visakhapatnam Chamber of
Commerce for outstanding performance in the Renewable Energy Sector in 2019
Accolades
SMR was a part of the team to commission a 15 and 5MW under the National Solar
Mission Phase 1 Batch II in Rajasthan, India. We were awarded by the ex – Prime Minister
of India for excellence in performance and work of the plant.

AWARDED by Dr Manmohan Singh for a


15 and 5MW plant
Rooftop Solar PV Proposal for Ghassan Aboud Group
Project Details - Model of Adoption

Key Highlights
• One time capital investment to enjoy more
economical and clean energy for 25 years
• One – stop – solution for client willing to
adopt solar PV
• SMR will provide all relevant product
guarantees and warranties
• SMR will assist in procuring all relevant
permits and approval
Project Details - Locations
S.No Name of Location Average monthly Theoretical Solar Area Solar Capacity that % Savings per
consumption based on PV Capacity Availability can be month
DEWA bills (kWh) required based (m2) accommodated
on consumption (kWp)
(kWp)
1. GAG – HQ 122,500 kWh 1,020kWp ~5,500 m2 430kWp ~42%

2. Grandiose 205,208.60 kWh 1,710kWp ~3,500 m2 218kWp ~12.70%


Catering – DIP
3. Gallega Global 67,125.33 kWh 560kWp ~2,500 m2 280kWp ~50%
Logistics – NIP
Total Solar PV Capacity (kWp) 928kWp
Project Details – Electricity Consumption Analysis
Project Details – System Parameters
As per the Sanctioned Load of the establishment aligned with the solar rooftop policy of DEWA

Particulars System Details Comments


Project Size in DC (AC) 928kWp Approx area requirement: Approx 8,000 sq
m
Module Technology Mono – Crystalline Modules DEWA Approved (Tier 1)
>500Wp – ~1,525 nos
Inverter Technology String Inverters DEWA Approved (Tier 1)
100 kW – 8 nos

Annual Energy Yield P50 1,473,014.40 kWh/year Substantial Yield:


(1st year) 1,587.30 kWh/kWp
Performance Ratio (1st Year) >80% As per DEWA guidelines, RTPV plants are
mandated to have 75% PR

Interconnection 415V/11kV 3 phase, LT side This will depend on DEWA approval.


Project Details – Commercials
Particulars Details
Total Project Capacity (kWp) 928kWp
Total Project Cost AED 1,950,000 + VAT
Current Grid Tariff AED 0.42/kWh
Project Cost/Wp AED 2.10/Wp + VAT
Grid Tariff Escalation per annum 2%
(average)
Plant Life 25 years
Debt:Equity 50:50
Interest Rate 3%
Tenure 12 years
O&M TBD
Gross Savings over 25 years AED 19,123,095.20 Please Note:
Equity IRR 60.84% This price does not include:
- DEWA Meter Charges
Project IRR 39.22% - DM/DDA/JAFZA Approval
- Modifications to the existing MDB
Solar LCOE AED 0.104/kWh
- Any civil works, apart from Solar EPC
Payback 2.55 years - Any deviation from BoM estimation will be charged extra
Project Details – Commercials
Particulars GAG – HQ, JAFZA Grandiose Catering, DIP Gallega Global Logistics, DIP
Total Project Capacity 430kWp 218kWp 280kWp
(kWp)
Total Project Cost AED 903,000 + VAT AED 459,000 + VAT AED 588,000 + VAT
Current Grid Tariff AED 0.42/kWh AED 0.42/kWh AED 0.42/kWh
Project Cost/Wp AED 2.10/Wp + VAT AED 2.10/Wp + VAT AED 2.10/Wp + VAT
Grid Tariff Escalation per 2% 2% 2%
annum (average)
Plant Life 25 years 25 years 25 years
Debt:Equity 50:50 50:50 50:50
Interest Rate 3% 3% 3%
Tenure 12 years 12 years 12 years
O&M TBD TBD TBD
Gross Savings over 25 AED 8,860,904.76 AED 4,492,285.71 AED 5,769,904.76
years
Equity IRR 60.84% 60.84% 60.84%
Project IRR 39.25% 39.25% 39.25%
Solar LCOE AED 0.104/kWh AED 0.104/kWh AED 0.104/kWh
Payback 2.55 years 2.55 years 2.55 years
Please Note:
This price does not include:
- DEWA Meter Charges
- DM/DDA/JAFZA Approval
- Modifications to the existing MDB
- Any civil works, apart from Solar EPC
- Any deviation from BoM estimation will be charged extra
Project Details – PV Layout – GAG HQ JAFZA
Project Details – PV Layout – Grandiose Catering DIP
Project Details – PV Layout – Gallega Global Logistics NIP
Scope of Works
1. Engineering/Procurement/Construction/Commissioning of Rooftop Solar PV Plant
Supply of Solar PV Modules
Supply of Solar Inverters (string)
Supply of MMS (module Mounting Structures), AC, DC Cables
Remote Monitoring with Data Logger, Earthing, Lightning Arrestor & BOS
Design, Engineering, Installation, Testing and Commissioning

2. Assistance in DEWA Permissions and Approvals


DEWA permits
Net Metering approval
DEWA NOC for interconnection of Solar PV Rooftop Project

3. All items will be delivered at site

4. Validity of Offer: 15 days

5. Timeline: 24 weeks from date of signing PO (Purchase Order)

Please Note:
- Manpower, tools, machinery, equipment and PPE will be under our scope
- Power (if required) needs to be made available
- Water to be made available
- Cleaning brush/wipe to be made available
Life Expectancy of Equipment

1. Supply of Solar PV Modules


a. 10+2 years product warranty (Please refer technical datasheet)
b. 25 year linear power output warranty @ 0.55% degradation annually (Please refer technical datasheet)

2. Supply of Solar Inverters (string)


a. 5(+2) year workmanship warranty

3. Supply of MMS (module Mounting Structures)


a. 5 year standard warranty

4. Electrical Balance of System (AC, DC Cables, Remote Monitoring with Data Logger, Earthing, Lightning Arrestor)
a. 2 year standard warranty

5. 2 year comprehensive warranty on the entire solar PV plant


Team Organization
SMR Energy
Systems LLC

Partner & Director:


Samay Mangalagiri

Design & Project Delivery


Contracts & Finance
Procurement Team Team

Design Head: Kartik Project Manager: Financial Controller:


Indoriya Maruthi Raj Srinag Susarla

Electrical Lead: Site Supervisor: Legal & Contracts:


Afzal Ahmed Santosh Vikas Jain

Structural Lead: Solar Technician 1: Compliance: Tejas


Nisar Khan David Shah

Solar Technician 2:
Poovi
Project References – Dubai
Sl.no Plot No Number Phone No Capacity kWP - DC Capacity –KW -AC
1 2654916 0555585109 4.29 4
2 2654995 509244114 4.29 4
3 2655095 508872626 4.29 4
4 2654727 508544411 4.29 4
5 2654733 501144867 4.29 4
6 2654923 503436688 4.29 4
7 2654184 505454141 4.29 4
8 2654194 507780787 4.29 4
9 2654144 507599940 4.29 4
10 2654746 504260368 4.29 4
11 2654238 507451133 4.29 4
12 2654934 504578789 4.29 4
13 2654207 508900201 4.29 4
14 2654156 507606060 4.29 4
15 2654819 505511070 4.29 4
16 2654279 506944452 4.29 4
17 2654158 506788355 4.29 4
18 2654189 508518484 4.29 4
19 2654212 508533356 4.29 4
20 2654230 503977445 4.29 4
Project References – Dubai
Sl.no Plot No Number Phone No Capacity kWP - DC Capacity –KW -AC
21 2654233 504160666 4.29 4
22 2654263 502726905 4.29 4
23 2654266 505408886 4.29 4
24 2654276 506577442 4.29 4
25 2654723 504554223 4.29 4
26 2654729 506560087 4.29 4
27 2654747 504666552 4.29 4
28 2654751 507788099 4.29 4
29 2654759 504827724 4.29 4
30 2654764 504544743 4.29 4
31 2654771 507559913 4.29 4
32 2654773 507650076 4.29 4
33 2654777 504105050 4.29 4
34 2654783 0504676306 4.29 4
35 2654795 509177750 4.29 4
36 2654801 0508881041 4.29 4
37 2654804 0505359935 4.29 4
38 2654816 506766331 4.29 4
39 2654822 504542240 4.29 4
40 2654836 505282220 4.29 4
Project References – Dubai
Sl.no Plot No Number Phone No Capacity kWP - DC Capacity –KW -AC
41 2654925 503467775 4.29 4
42 2654945 507144457 4.29 4
43 2654956 504508802 4.29 4
44 2654958 506788779 4.29 4
45 2655024 507140945 4.29 4
46 2655096 507859774 4.29 4
47 2655098 504600098 4.29 4
48 2654186 508457565 4.29 4
49 2654287 504542818 4.29 4
50 2654906 506755006 4.29 4
51 2655097 502283223 4.29 4
52 2655099 561700905 4.29 4
53 2654762 508819777 4.29 4
54 2654234 503474797 4.29 4
55 2654835 502975763 4.29 4
56 2654237 506941511 4.29 4
57 2654249 505663303 4.29 4
58 2654199 506247909 4.29 4
59 2654193 502747771 4.29 4
60 2654190 506755667 4.29 4
Project References – Dubai
Sl.no Plot No Number Phone No Capacity kWP - DC Capacity –KW -AC
61 2654188 503414113 4.29 4
62 2654265 505941678 4.29 4
63 2654142 502555487 4.29 4
64 2654147 503593933 4.29 4
65 2654285 501136665 4.29 4
66 2654239 506741212 4.29 4
67 2654917 551003002 4.29 4
68 2654143 507800091 4.29 4
69 2654750 502511550 4.29 4
70 2654724 0507661554 4.29 4
71 2654772 505441177 4.29 4
72 2654793 505642423 4.29 4
73 2654922 505513353 4.29 4
74 2654927 567799807 4.29 4
75 2655022 554041484 4.29 4
76 2654828 506882288 4.29 4
77 2655000 507785559 4.29 4
78 2654982 502844661 4.29 4
79 2654999 507788481 4.29 4
80 2654807 508788744 4.29 4
Project References – Dubai
Sl.no Plot No Number Phone No Capacity kWP - DC Capacity –KW -AC
81 2654959 507547552 4.29 4
82 2654957 503536977 4.29 4
83 2654839 503445114 4.29 4
84 2654146 507594757 4.29 4
85 2654169 505383508 4.29 4
86 2654168 505578858 4.29 4
87 2654166 506761650 4.29 4
88 2654167 507455778 4.29 4
89 2654196 501444585 4.29 4
90 2654646 505097779 4.29 4
91 2654984 505862199 4.29 4
92 2654941 504995845 4.29 4
93 2654942 506950093 4.29 4
94 2654885 505290898 4.29 4
95 2654800 505595997 4.29 4
96 2654786 505350565 4.29 4
97 2654761 505431944 4.29 4
98 2654737 502242083 4.29 4
99 2654739 505143117 4.29 4
100 2654794 501841118 4.29 4
Project References – Dubai
Sl.no Plot No Number Phone No Capacity kWP - DC Capacity –KW -AC
101 2654760 506889910 4.29 4
102 2655005 508887544 4.29 4
103 2654996 504502204 4.29 4
104 2654994 506531289 4.29 4
105 2654909 502066603 4.29 4
106 2654837 505245559 4.29 4
107 2654991 507744008 4.29 4
108 2655025 507855158 4.29 4
109 2654815 509515459 4.29 4
110 2654814 508870006 4.29 4
111 2654797 507706033 4.29 4
112 2654150 508931114 4.29 4
113 2654915 502255900 4.29 4
114 2654220 503455026 4.29 4
115 2654643 506252583 4.29 4
116 2655001 507970827 4.29 4
117 2654998 506998877 4.29 4
118 2654829 508488001 4.29 4
119 2654642 507788494 4.29 4
120 2654813 505690202 4.29 4
Project References – Dubai
Sl.no Plot No Number Phone No Capacity kWP - DC Capacity –KW -AC
121 2654888 971506188722 4.29 4
122 2654926 971505511198 4.29 4
123 2654929 971503555070 4.29 4
124 2654843 971507847449 4.29 4
125 2654838 971505506608 4.29 4
126 2654845 971505455339 4.29 4
127 2655002 971506544337 4.29 4
128 2654213 971504669992 4.29 4
129 2654811 971505585543 4.29 4
130 2654262 971505445255 4.29 4
131 2654261 971505888442 4.29 4
132 2654183 971506500112 4.29 4
133 2655101 971504566001 4.29 4
134 2654720 971506000343 4.29 4
135 2654665 971505231000 4.29 4
136 2654284 971507655554 4.29 4
137 2655016 971503153333 4.29 4
138 2654675 971504212808 4.29 4
139 2654663 971505888842 4.29 4
140 2654173 971505522115 4.29 4
Project References – Dubai
Sl.no Plot No Number Phone No Capacity kWP - DC Capacity –KW -AC
141 2654191 971501429998 4.29 4
142 2655014 507655653 4.29 4
143 2654179 971506262694 4.29 4
144 2654197 971507355593 4.29 4
145 2654271 971504244221 4.29 4
146 2654640 971508187712 4.29 4
147 2654654 971507983337 4.29 4
148 2654862 971504500855 4.29 4
149 2654880 971509286666 4.29 4
150 2654884 971504445583 4.29 4
151 2654936 504534746 4.29 4
152 2654939 567880237 4.29 4
153 2654944 506888280 4.29 4
154 2654948 505872820 4.29 4
155 2654955 509120203 4.29 4
156 2654971 504256333 4.29 4
157 2654973 507544481 4.29 4
158 2654993 501444411 4.29 4
159 2655021 502582555 4.29 4
160 2655100 507858182 4.29 4
Project References – Dubai
Sl.no Plot No Number Phone No Capacity kWP - DC Capacity –KW -AC
161 2654699 505203937 4.29 4
162 2654676 971501006004 4.29 4
163 2654710 971507440433 4.29 4
164 2654866 971505683030 4.29 4
165 2654201 971504255002 4.29 4
166 2654667 971507856560 4.29 4
167 2654693 971505444043 4.29 4
168 2654668 971504255226 4.29 4
169 2654662 971507880054 4.29 4
170 2654694 971552255322 4.29 4
171 2654210 971505711145 4.29 4
172 2654268 971505659009 4.29 4
173 2654858 971504504455 4.29 4
174 2654670 971509565657 4.29 4
175 2654678 971567799377 4.29 4
176 2654695 971507444157 4.29 4
177 2654979 971506945196 4.29 4
178 2654875 971504212922 4.29 4
179 2654278 971506788689 4.29 4
180 2654180 971507744366 4.29 4
Project References – Dubai
Sl.no Plot No Number Phone No Capacity kWP - DC Capacity –KW -AC
181 2654195 971504698787 4.29 4
182 2654227 971504777454 4.29 4
183 2654235 971506363022 4.29 4
184 2654872 504566161 4.29 4
185 2654882 971508498821 4.29 4
186 2654850 971507210001 4.29 4
187 2654954 971504448499 4.29 4
188 2654674 971506550078 4.29 4
189 2654919 505530905 4.29 4
190 2654847 504788955 4.29 4
191 2654848 505755900 4.29 4
192 2654149 502099985 4.29 4
193 2654224 504218182 4.29 4
194 2654877 505852220 4.29 4
195 2654869 508438886 4.29 4
196 2654874 507388993 4.29 4
197 2654704 505744450 4.29 4
198 2654706 506252664 4.29 4
199 2654687 505244556 4.29 4
200 2654690 508811662 4.29 4
Project References – Dubai
Sl.no Plot No Number Phone No Capacity kWP - DC Capacity –KW -AC
201 2654692 506545430 4.29 4
202 2654639 505883705 4.29 4
203 2654703 506744436 4.29 4
204 2655017 507451122 4.29 4
205 2654937 505758589 4.29 4
206 2654859 504239099 4.29 4
207 2654969 503445220 4.29 4
208 2654967 507563634 4.29 4
209 2654883 501444408 4.29 4
210 2654879 503565550 4.29 4
211 2654657 505053055 4.29 4
212 2654709 508466688 4.29 4
213 2654732 505948222 4.29 4
214 2655102 507107117 4.29 4
215 2654970 504588291 4.29 4
216 2654966 507519994 4.29 4
217 2654679 508556550 4.29 4
218 2654716 505599008 4.29 4
219 2654855 502253010 4.29 4
220 2654851 507655242 4.29 4
Project References – Dubai
Sl.no Plot No Number Phone No Capacity kWP - DC Capacity –KW -AC
221 2654269 506366087 4.29 4
222 2654209 567908007 4.29 4
223 2654659 507499900 4.29 4
224 2654222 504741313 4.29 4
225 2654159 509111225 4.29 4
226 2654658 504966599 4.29 4
227 2654226 505651619 4.29 4
228 2654246 504983835 4.29 4
229 2654270 502592279 4.29 4
230 2654714 508485540 4.29 4
231 2654689 508461446 4.29 4
232 2654685 507949006 4.29 4
233 2654776 504275788 4.29 4
234 2654758 5088411865 4.29 4
235 2654980 5022887745 4.29 4
236 2654953 505043636 4.29 4
237 2653978 505351112 4.29 4
238 N/A 0504277002 4.29 4
239 2662034 502852211 4.29 4
240 2661779 504577345 4.29 4
Continues..
Sl.no Plot No Number Phone No Capacity kWP - DC Capacity –KW -AC
241 2661805 508232444 4.29 4
242 2662046 507554403 4.29 4
243 2662144 508483553 4.29 4
244 2661987 505868767 4.29 4
245 2661983 505847637 4.29 4
246 2661985 5025212225 4.29 4
247 2662026 506766776 4.29 4
248 N/A 505949739 4.29 4
249 N/A 501339989 4.29 4
250 2661854 505359650 4.29 4
251 N/A 507644460 4.29 4
252 2662003 508582221 4.29 4
253 2662055 504296692 4.29 4
254 2661960 554424434 4.29 4
255 2661146 502664282 4.29 4
256 2662009 503463456 4.29 4
257 2662027 503440030 4.29 4
258 N/A 971509707578 31.32 30
259 N/A 971509707578 20. 52 20
260 N/A 971509707578 32. 66 30
Project References – UAE
S.No Project Name Client Work Scope Contract Value Project Duration Status

EMPOWER SOLUTION RESIDENCE AND SUPPLY, INSTALLATION AND T&C OF 72KW GRID
1 EMPOWER SOLUTION 400,000 AED 2 MONTHS Current Project
OFFICE BUILDING CONNECTED ZERO INJECTION SOALR PV SYSTEM.

CIVIL DEFENCE BUILDING –RAS AL MINISTRY OF ENERGY AND SUPPLY, INSTALLATION AND T&C OF 52KW GRID
2 350,000 AED 2 MONTHS Current Project
KHAIMAH INFRASTRUCTURE CONNECTED ZERO INJECTION SOALR PV SYSTEM

900MW DEWA Phase 5 Solar Park – Al May 2021 to July


3 SHANGHAI ACWA Installation of 100MW Solar Ground Mounting System 1,500,000 AED Completed Project
Maktoum Solar Park Al Qudra 2021

AMAF HEADQUARTER BUILDIN On Plot No.


2140909, M/R. Awqaf & Minors Affairs Design, Supply, Installation and T&C of 132Kw Solar Sep 2021 to
4 475,000 AED Completed Project
Al Garhoud. Dubai-UAE Foundation On-Grid PV system. November 2021

DESIGN, SUPPLY, INSTALLATION & TESTING &


SPECIAL SECURITY FORCES BUILDING – MINISTRY OF INFRASTRUCTURE Jan 2021 to April
5 COMMISSIONING OF 50KW PVSOLAR SYSTEM (Zero 550,000 AED Completed Project
RAK & DEVELOPMENT 2021
Injection System with Car Park shed)

MBR3 PHASE III – SOLAR PARK @ AL Nov 2020 to Dec


6 DEWA SOLAR INSTALLATION & MAINTENANCE WORK 100,000 AED 2020
Completed Project
QUDRA

Installation 4.5Kw soalr system in Private Sep 2019 to Dec


7 Ethihad Esco Partial Supply and Installation of Solar PV ssytem 250,000 AED Completed Project
Villas - 250 Villas 2019
Project References – India
Details of major projects executed in CAPEX model in INDIA
S.No Company Name Site Address Capacity (kW)
1 Gandhi Institute of Technology & Management GITAM University, Vizag 1070
2 KL Steels G B Nagar, Uttarpradesh 300
3 St. Andrews Hyderabad 110
4 ANJ Infra Delhi 120
5 People's Education Society University North Campus,Blore 325
6 TAFE MOTORS & TRACTORS LIMITED Talbros - 256kW 256
7 Arista Management Services LLP. DPS, Gurugram 50
8 TAFE MOTORS & TRACTORS LIMITED Lucknow - 8kW 8
9 Sudarsan Infra Project - V-Conventions Visakhapatnam 40
10 Defence Officers Flats Complex Defence Flats, Visakhapatnam 10
11 Gandhi Institute of Technology & Management GITAM University, Bengaluru 500
12 RN Bajaj Overseas Agra 100
13 Raj Niwas Palace Dholpur 142.82
14 Varun Motors Pvt. Ltd. Vijayawada 55
15 Dasapalla Hotels Pvt. Ltd. Visakhapatnam 61.25
16 Dasapalla Hotels Pvt. Ltd. Visakhapatnam 3.5
17 People's Education Society University PESIT, South Campus, Bengaluru 415.35
INS CIRCARS and Navy Children School,
18 Military Engineering Services 450
Visakhapatnam
19 Shyam Manchukonda Visakhapatnam 14
20 M.K.Maharaja Exports Jalandar 15.05
Project References – India
Details of major projects executed in CAPEX model in INDIA

S.No Company Name Site Address Capacity (kW)


21 Bharat Petrolium Corporation Limited Visakhapatnam 7.2
22 Kautilya Industries Private Limited Gurugram 62.9
23 CnC Residence Visakhapatnam 7
24 M.V.V. Satyanarayana (MP) Visakhapatnam 6
25 Military Engineering Services Visakhapatnam 20
26 SB Structures Delhi 25
27 Gandhi Institute of Technology & Management Visakhapatnam 36
28 Mangalagiri Residence Visakhapatnam 10
29 TAFE MOTORS & TRACTORS LIMITED Jaycee - 85kW, 7kW 92
30 TAFE MOTORS & TRACTORS LIMITED Udaipur - 38kW 38
31 TAFE MOTORS & TRACTORS LIMITED Mundka - 71.4kW 71.4
32 TAFE MOTORS & TRACTORS LIMITED Nilakottai - 500kW 500

Major projects cumulative capacity in KWp 4921.47


Project References – India
RESCO/OPEX Projects
S.No Company Name Project Name & Capacity Capacity (kW)
1 Indian Navy Naushakti - 120kW 120
2 Indian Navy Main Complex - 60kW 60
3 Indian Navy Dolphin Hills - 31kW 31
211
Work In Progress in India

S.No Company Name Project Name & Capacity Capacity (kW)


1 MES Delhi Delhi 400
2 NTPC Andaman 260
3 People's Educational Society Kuppam 60
720

Total Project capacity of Executed projects in CAPEX models, OPEX models, I&C projects and
5852.47 kW
projects which are in progress (in terms of kW)
Project References – India
Maintenance Contracts
S.No Company Name Project Name & Capacity Capacity (kW)
1 Gandhi Institute of Technology & Management GITAM University, Vizag 1070
1070

List of Projects in Pipeline in India


S.No Company Name Project Name & Capacity Capacity (kW)

1 EPGC Golf Court - Visakhapatnam 100


2 St. Andrews residence Hyderabad 8
3 Subhodaya Chemicals West Godavari 435
4 Runaya Industries Jarsiguda, Odisha 300
5 Runaya Industries Daman and Diu 300
6 Runaya Industries Bhilwara, Rajasthan 600
7 Globus Sprits Rajasthan 500
2243
DUBAI - UAE
(SELECTED PROJECT SHOWCASE)
Name of the project : Oud al muteena
Proposed Villas with Meter Cabinet Layout

Project Capacity : 4.29kWp/ 4 kW


No of Project site : 319 No's
SMR Project Delivery Framework
SMR takes 100% responsibility of Project Execution and follows a well-laid process to deliver high quality
projects within timelines.
Project Handover to PM Team
Comprehensive document checklist and
Project Team protocols followed while transferring the
Project execution team is created project from Business Development Team
consisting of: A Project Manager, LE – to Project Management Team.
Electrical, LE-Structures, Buyer,
Regulatory Engineer and Construction
Manager
Site Surveys
Site visits are conducted for surveying
Project Execution and collecting site data to do basic and
Schedule for PV Solar Project is detailed engineering
typically between 1 to 5 months
depending on size and complexity in
terms of interconnection voltage (LT
or MV).
HSE
SMR has a strict HSE Policy and Procedure
which is mandatorily implemented at all
Performance Guarantees Project Sites.
SMR adheres to all performance SMR also ensures fulfillment of any additional
guarantees which it promises to its HSE requirements that the client may have.
clients while signing PPAs.
SMR Project Design Capabilities
SMR has optimized generation through development of proprietary designs over time. Our design
modification vis a vis industry standard produces higher generation and a better performance ratio
Generation O&M Intervention
Shading Analysis
Optimum Tilt
Represents
Air Ventilation of Modules increase in
Layout generation

Equipment Placement
Cable Sizing/Type/Material Represents
increase in
Structure Material reliability of
Conduits supply
Lightning Arrestor
Remote Monitoring
String Level Monitoring
CCTVs
SMR O&M Capabilities
Dedicated 8 member professional projects team and a three-tier Operations and Maintenance
process to ensure High Uptime

Modules before and after cleaning


1 Predictive
Maintenance o Remote Monitoring System
o Cost effective cleaning Cycles

o Periodic equipment testing


Preventive
2 o Quick response teams
Maintenance
o Monitoring regular wear & tear Remote Monitoring Systems
o 24X7 on-call maintenance
o Dedicated project manager
Corrective
3 o Monitoring system alerts
Maintenance
Samay Mangalagiri