HMAS Condition Inspection Report

Vessel Name: M.T.XXXX

Critical and Emergency Equipment checks and tests

EQUIPMENT IMAGE
Emergency fire pump tests with fire hoses

Foam monitor test with Emgcy fire pump

Page 1 of 46
HMAS Condition Inspection Report

Lifejackets light test

Lifebuoy S.I lights test

SCBA sets bottle pressure and whistle test

Page 2 of 46
HMAS Condition Inspection Report

Lifeboat lights tested

Lifeboat -sea sickness tabs checked

Foam isolation valve checked

Page 3 of 46
HMAS Condition Inspection Report

Fire line isolation valve checked

Foam monitor movements checked

Fire hose boxes checked

Page 4 of 46
HMAS Condition Inspection Report

Magnetic compass checked

PPE – eye wash checked

Emgcy lighting on deck tested

Page 5 of 46
HMAS Condition Inspection Report

Rollers checked for free movement

Fwd life raft light checked

PV valves lift checked

Page 6 of 46
HMAS Condition Inspection Report

Emgcy Showers checked

Wilden pumps checked

High level and over fill alarms tested

Page 7 of 46
HMAS Condition Inspection Report

Portable gas meters checked

Ballast pump room bilge alarm tested

Page 8 of 46
HMAS Condition Inspection Report

Ballast pump room bilge alarm tested

ECDIS – ENC updated checked

ECDIS – Presentation library

Page 9 of 46
HMAS Condition Inspection Report

ENC – PI checked

Navigational light failure alarm tested

Aldis lamp tested on mains and battery

Page 10 of 46
HMAS Condition Inspection Report

GMDSS Radios tested

Provision store food items checked

ESB 220 V earth meter tested

Page 11 of 46
HMAS Condition Inspection Report

MSB 440 V earth meter tested

MSB 220 V earth meter alarm tested

Self-closing devices in Engine room


checked

Page 12 of 46
HMAS Condition Inspection Report

Portable Fire extinguisher inspection


records checked

OWS 15 ppm Bilge alarm tested

Main air compressor 1 & 2 tested

Page 13 of 46
HMAS Condition Inspection Report

A/E exhaust gas temp checked

Portable lifting gear in engine room


checked

Workshop equipment emgcy stops tested

Page 14 of 46
HMAS Condition Inspection Report

Workshop equipment checked

Workshop equipment checked

Steering gear reserve tank oil level


checked

Page 15 of 46
HMAS Condition Inspection Report

Steering gear telephone checked

Emgcy fire pump bilge alarm tested

Fire dampers checked

Page 16 of 46
HMAS Condition Inspection Report

Emergency generator tried out

Emgcy generator fuel tank shut off valve


tested

ESB gloves checked

Page 17 of 46
HMAS Condition Inspection Report

Critical spares checked

Critical spares – fire detector heads


checked as per inventory

A/E No.3 load tested

Page 18 of 46
HMAS Condition Inspection Report

A/E No.3 load tested ~ 400 KW

FO purifier test run- 35 Deg.C. (vessel on


LSMGO – ECA region)

FO purifier alarm tested

Page 19 of 46
HMAS Condition Inspection Report

A/E No.1 leak off alarm tested

Alarms test history verified in ECR

No.3 A/E LO checks – Water content

Page 20 of 46
HMAS Condition Inspection Report

No.3 A/E LO checks- BN

No.3 A/E LO sample checks

Boiler water tests- chloride

Page 21 of 46
HMAS Condition Inspection Report

Boiler water tests- pH 10.5

Bilge alarm test

Steering gear alarms tested, Boiler low low


water level tested

Page 22 of 46
HMAS Condition Inspection Report

PMS-Ship soft checked for defects – 2 nos

PMS – Overdue jobs verified

Critical spares checked in PMS

Page 23 of 46
HMAS Condition Inspection Report

IGG oxygen calibration

PMS – sample tested for jobs history

Page 24 of 46
HMAS Condition Inspection Report

EEBD live test – Safety Meeting

Page 25 of 46