Effect Ranking Criteria: Severity of Effect (Example)
Effect Ranking Criteria: Severity of Effect (Example)
May endanger machine or operator. Failure will occur without warning, Very high
Hazardous - without warning 10 severity ranking when the failure mode affects safe operation and/or involves
noncompliance with statutory requirements
May endanger machine or operator. Failure will occur with warning, Very high severity
Hazardous - with warning 9 ranking when the failure mode affects safe operation and/or involves noncompliance
with statutory requirements
Major disruption of production. 100% of the product may not pass quality standards.
Very High 8
Loss of primary function. Customer very dissatisfied
Minor disruption of production. A portion of the product may not pass quality standards.
High 7
Machine operable but at a lower performance level. Customer dissatisfied
Minor disruption of production. A portion of the product may not pass quality standards.
Moderate 6
Machine operable but some item(s) inoperable. Customer experience discomfort
S O D R S O D R
Equipment System Primary Component/ Potential Failure Mode Potential Failure Effects E Potential Causes C Current Controls E P Actions Recommended Execution Resp. Finalized Target Date Status Actions Taken E C E P Remarks
Equipment/Process Sub-Proc ess V C T N V C T N
cau se o r FM?
an d pro ce dure s (i nspectio n What ar e the action s fo r Wh at are the com plete d
I n wh at ways doe s the red ucing the occurre nce of the action s taken with the
occur?
Wh at is the im pact on the Key What causes the Key Inpu t an d test) that pr event ei ghth
Eq uip ment/ Process go Cau se , o r impro ving detectio n? recalcul ated RPN? Be
wr ong? Outp ut Var iabl es? to go wrong ? th e cau se or the Fai lu re Should have ac tions only sure to include
Mode ? Should include an
SOP number. on high R PN's or easy fixes. completion month/year
pump un available
n o leakag e checked d urri ng PM as per
Suction pipe assembly Leakage 10 Normal wear and tear/ 2 Visual inspection from 2 40 D-metering needs to be done Maint engg Durring monthly PM 2 3 6 36
cur rentl y p ersist checkli st
Internal corrosion outside To be checked on next PM
pump un available
Discharge pipe n o leakag e checked d urri ng PM as per
Leakage 10 Normal wear and tear/ 2 Visual inspection from 2 40 D-metering needs to be done Maint engg Once in a year 2 4 5 40
cur rentl y p ersist checkli st
Internal corrosion outside To be checked on next PM
Service water transfer completely
All l ekages has
stopped to main plant
b een atte nded checked d urri ng PM as per
under ground pipe Leakage 10 2 8 160 D-metering needs to be done Maint engg Once in a year 6 2 6 72
wi th ne w pi pe checkli st
Normal wear and tear/ Visual inspection from
lin es.
Internal corrosion outside To be checked on next PM
Service transfer completely
stopped to main plant Befo re excavation depa rtment Du rrin g Excavati on work don e
cl earan ce i s r equi red an d und ergro und pip e All l ekages has wi th pro per gu ida nce and
Leakage 10 Improper Excavation 2 8 160 prop er mean s of excavati on as Maint engg closel y mo nite red for 4 5 6 120
mai nten ance been a tte nde d.
per safety standar ds i s un derg roun d pi peli ne whil e
Visual inspection from wo rk. To b e closely mo nitor whi le
outside requ ired . di ggi ng. di ggin g wo rk
individual pump is not available I n goo d condi tion checked d urri ng PM as per
Coupling Coupling damage 10 Over loading of coupling/ 2 Checking of coupling 2 40 inspection in every AOH. Maint engg Durring monthly PM 2 2 6 24
Improper alignment of shaft condition during PM observed checkli st To be checked on next PM
Re gul ar moni torin g of CBM checked d urri ng PM as per
Play in coupling High vibration 6 2 Checking of coupling 4 48 Maint engg Durring monthly PM Healthy 2 3 5 30
Failure of spider/bore size condition during PM repo rts i s req ui red checkli st To be checked on next PM
pump unable to deliver flow, Prop er materi al shou ld b e Ch ecked on no de fect fou nd ti ll
Pump casing Failure of pump casing pressure 10 Improper material of 1 Visual inspection from 2 20 menti oned in PR . Maint engg PMI test done 2 1 6 12
construction outside augu st 2 015 no w To be checked on next PM
10 Corrosion/Erosion/abrasion 1 Observation during 8 80 Insfection in every AOH Maint engg Durring monthly PM no de fect fou nd ti ll checked d urri ng PM as per 5 3 5 75
in service Overhauling no w checkli st To be checked on next PM
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Probability of failure Ranking
Very remote Very remote likelihood that current control(s) will detect failure 9
mode
Remote Remote likelihood that current control(s) will detect failure mode 8
Very Low Very low likelihood that current control(s) will detect failure 7
mode
Low Low likelihood that current control(s) will detect failure mode 6
Very high Very High likelihood that current control(s) will detect failure 2
mode
Almost certain Current control(s) almost certain to detect the failure mode. 1
Reliable detection controls are known with similar
processes/systems