NIM : D111911144
MATA KULIAH : PROJECT II
NO. DESKRIPSI PEKERJAAN Spesifikasi MERK/TYPE JUMLAH SAT HARGA SAT HARGA TOTAL
7 PC Administrator Perpustakaan. All in Intel Core i5, 4GB DDR3, 1TB, DVDRW, VGA min 1GB, NIC, Wifi, HP All-in-One 24-G026D [D] 6 Unit 16,250,560 97,503,360
one PC Bluetooth, 23" , Win 10
TOTAL 1,066,348,860
TARGET PROGRES
PERHITUNGAN PEMBOBOTAN Minggu 1
No Deskripsi Bobot Progress
1 Buku IMO 30% 12%
2 Rak Buku 18% 10%
3 Meja Baca 5% 0%
4 Kursi 3% 0%
5 Software Manajamant Perpustakaan 20% 18%
6 PC Kepala Perpustakaan 10% 2%
7 PC Administrator Perpustakaan. All in one PC 14% 8%
100%
MEMBUAT GRAFIK
Minggu
Progres
Progres
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
0 1 2 3 4 5 6 7
TARGET PROGRES
Minggu 1 Minggu 2 Minggu 3 Minggu 4 Minggu 5
Bobot % Progress Bobot % Progress Bobot % Progress Bobot % Progress Bobot %
4% 20% 6% 32% 10% 45% 14% 56% 17%
2% 35% 6% 40% 7% 47% 8% 55% 10%
0% 20% 1% 37% 2% 48% 2% 67% 3%
0% 0% 0% 0% 0% 25% 1% 52% 2%
4% 38% 8% 47% 9% 58% 12% 72% 14%
0% 19% 2% 38% 4% 59% 6% 71% 7%
1% 22% 3% 35% 5% 50% 7% 66% 9%
10% 26% 37% 50% 62%
MEMBUAT GRAFIK
0 1 2 3 4 5 6 7 8
0 10% 26% 37% 50% 62% 76% 93% 100%
Progres
1
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
5 6 7 8 0 1 2 3 4 5 6 7 8
Minggu 6 Minggu 7 Minggu 8
Progress Bobot % Progress Bobot % Progress Bobot %
67% 20% 89% 27% 100% 30%
64% 12% 92% 17% 100% 18%
78% 4% 94% 5% 100% 5%
83% 2% 97% 3% 100% 3%
87% 17% 95% 19% 100% 20%
89% 9% 98% 10% 100% 10%
82% 11% 96% 13% 100% 14%
76% 93% 100%
6 7 8
Dasar Perhitungan
Progres Mingguan
NO Kegiatan Bobot
1 2 3 4 5
1 Analysis 20% 50 50
2 Design 30% 30 30 40
3 Coding 35% 25 25
4 Testing 15% 20
Bobot Progress
Bobot Progres Mingguan
NO Kegiatan Bobot
1 2 3 4 5
1 Analysis 20% 10 10
2 Design 30% 9 9 12
3 Coding 35% 8.75 8.75
4 Testing 15% 3
Akumulasi tiap minggu 10 19 9 20.75 11.75
Akumulasi sampai minggu ke dari awal pekerjaan 10 29 38 58.75 70.5
Mingguan
6 7 8
100 20
100 30
25 25 100 35
30 40 10 100 15
es Mingguan
6 7 8
20
30
8.75 8.75 35
4.5 6 1.5 15
13.25 14.75 1.5
83.75 98.5 100
JADWAL PELAKSANAAN PEKERJAAN PENGEMBANGAN APLIKASI
MINGGU KE
NO KEGIATAN
1 2 3 4
1 Tanda tangan kontrak
2 Kick of meeting
3 Datagathering
4 Analysis
5 Pengadaan hardware
6 Design
7 Coding
8 Testing
9 Instalation
10 Training
11 Serah Terima
MINGGU KE
NO KEGIATAN
1 2 3 4
100%
1 Tanda tangan kontrak
2 Kick of meeting 90%
3 Datagathering 80%
4 Analysis 70%
5 Pengadaan hardware 60%
6 Design 50%
7 Coding
40%
8 Testing
30%
9 Instalation
10 Training 20%
11 Serah Terima 10%
0%
0 1 2 3 4 5 6
MBANGAN APLIKASI SISTEM INFORMASI PERPUSTAKAAN
MINGGU KE
5 6 7 8
MINGGU KE
5 6 7 8
3 4 5 6 7 8