TESTING AND COMMISSSIONING

Installation: Main Low Voltage Panel

Location: Transformer Room No 1 Phase 2A

Project: Le Clos du littoral 2 Grand Baie

Client: Evaco Construction

Remarks

Earth Test

MLVP:

Generator Neutral:

Generator Casing:

Voltage Test
Villa Ref. Polarity CEB Side Changeover Changeover Remarks
No. to Generator Toggle
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Remarks:

Approved By

Client & Consultant: Contractor: Contractor’s Representatives:

Name: Name: Name:


1 1 1

2 2 2

3 3 3
Signature: Signature: Signature:
1 1 1

2 2 2

3 3 3

Date: Date: Date: