Professional Documents
Culture Documents
File Note - 1
File Note - 1
7th March 2023
FILE NOTE FOR APPROVAL
Through: GM Design & Engineering
To: President
Sub: Infrastructure Requirement – Workstation & Desktop for Engineering team.
Total ₹675000
Please sanction the above at the earliest.
Name