Manual Handling
GENERAL PERMIT
• Remember to use safe lifting practices
• Use mechanical means when possible to move heavy loads FEB23-P042
• Don't lift alone, get help if needed
SAFETY REQUIREMENTS TOOLBOX TALK (TBT) ATTENDANCE RECORD - To be completed before work commence
Work Zone
• Notify personnel in the immediate vicinity Discussion to be completed:
• Follow your company's Hot Work Program as required Emergency Evacuation Route & Plannings YES / NO
• For more information on Google 's Hot Work Policies, visit go/Hotwork
• Assure a safe work zone is established with signage or caution tape Personal Safety & PPE YES / NO
• Post this work permit in visible location Incident Reporting YES / NO
• Review posted building evacuation map
• Follow all safe work practices established by your company Tools & Equipment Used on site YES / NO
• Locate the closest First Aid cabinet and AED unit Job Specific Details YES / NO
• Use all PPE required for your job
Others (Please Specify):
• Contact your Google Host if new or changed hazards are presented YES / NO
Electricity
• Work can only be performed on de-energized systems unless specific authorization has
been provided prior to the start of work Name of Workforces Workforces TBT Time
Date Of Work
• Follow your companies Electrical Safety Program Attended TBT Signature Conducted By Conducted
Emergencies
• Fire, Medical or other Emergency requiring emergency responders Call Google Security
(GSOC) +1 650-253-5555
• Immediately contact your Google Host
Server Room
• Only authorized personnel allowed in Server Rooms
• No photography or recording is permitted
• Follow your company's safe electrical work procedures
Fire Watch
• Must be present when necessary
WORKFORCE SELECTED
Aniket Ghosh
Should you have any other information or enquiries, please input here:
Test permit
Page 2 of 3
GENERAL PERMIT FEB23-P042
HIGH RISK WORK CHECKLIST - To be completed at the jobsite AUTHORISATION - You must only sign if you agree with the statement below
Hot Work - To be completed at jobsite I confirm that I have reviewed the risk assessment and any supporting written safe system of work
• Will any part of an installed sprinkler/gas floor or similar fixed fire installation be affected by the against the specific work mentioned above and I am satisfied that all the necessary precautions are in
activity. [__] Yes [__] No [__] N/A
place to effectively manage the risks
• Has smoke/fire detectors equipment been isolated or otherwise prevented from operating? [__] Yes
[__] No [__] N/A Permit Approver Name:
• If the above is YES, confirm the integrity of adequate fire precautions are maintained and have been
approved? [__] Yes [__] No [__] N/A Siva Soumya Narapa Reddy
• Suitable extinguishers (other than those installed at Google) and/or fire blanket specifically been
provided at the work scene? [__] Yes [__] No [__] N/A Work Requester Name: Signed: Date/Time:
• There is an adequate means of raising the fire alarm, especially if local system is isolated; full details
should be in risk assessment? [__] Yes [__] No [__] N/A soumya
• The area is clear of combustible materials, flammable liquids, flammable liquid containers and vessel/
lines are purged and clear? [__] Yes [__] No [__] N/A Contractor Name: Signed: Date/Time:
• Adequate precautions are implemented to ensure flammables are completely protected from fire risk
including gas cylinders/hoses? [__] Yes [__] No [__] N/A
• Walls/floors including gullies, ducts, etc are suitably protected from exposure to flame? [__] Yes [__]
No [__] N/A CLOSURE
• The work causes conditions that affect systems under the control of others, they have authorised the Work Requester Name: Signed: Date/Time:
works and controls? [__] Yes [__] No [__] N/A
• The Person in Charge of doing work has been made aware all systems and work in the immediate soumya
vicinity of this work area? [__] Yes [__] No [__] N/A Contractor Name: Signed: Date/Time:
• Areas likely to be affected by the work have been sectioned off and alternative access routes
provided? [__] Yes [__] No [__] N/A
• Suitable warning signage has been displayed at all appropriate places and emergency exit routes?
[__] Yes [__] No [__] N/A PERMIT NOTES
• All other parties likely to be affected have been notified of the activity/works including any system
shutdown, etc? [__] Yes [__] No [__] N/A
• I am satisfied that other activities/critical systems related to this work have been identified and it is
safe to do the work? [__] Yes [__] No [__] N/A