The document appears to be a report from an AOR (Area Optimization Review) conducted on February 15, 2023 at tower SUM-LA-GDT-0190 by technician Regi Dwi Saputra. It includes details on the tower configuration and performance metrics for 6 sectors on bands 1800MHz and 900MHz. Optimization adjustments were made to the electrical tilts of the antennas.
The document appears to be a report from an AOR (Area Optimization Review) conducted on February 15, 2023 at tower SUM-LA-GDT-0190 by technician Regi Dwi Saputra. It includes details on the tower configuration and performance metrics for 6 sectors on bands 1800MHz and 900MHz. Optimization adjustments were made to the electrical tilts of the antennas.
The document appears to be a report from an AOR (Area Optimization Review) conducted on February 15, 2023 at tower SUM-LA-GDT-0190 by technician Regi Dwi Saputra. It includes details on the tower configuration and performance metrics for 6 sectors on bands 1800MHz and 900MHz. Optimization adjustments were made to the electrical tilts of the antennas.