Name of Project : Proposed Steel Gate & Fence

Location : Philbest Canning Corporation, General Santos City


Subject : Project Cost Estimate
Date : 5/20/22
Duration: : 5 days

Unit Cost
Item Description Unit Total Quantity Material Cost Material & Labor Cost
Material Cost Total

Direct Cost
STEEL AND CONCRETE WORKS
1 Steel Gate & Fence
a Mobilization/Demobilization lot 1.00 - 500.00
b 2" x 2" x 20' x 1.2mm Square Tube pcs 6.00 600.00 3,600.00 3,600.00
1.0 c 1" x 1" x 20' x 1.2mm Square Tube pcs 6.00 350.00 2,100.00 2,100.00
d Metal Primer Grey (1Liter) pcs 2.00 250.00 500.00 500.00
e Cylindrical Hinges pcs 4.00 300.00 1,200.00 1,200.00
f Paint Black (1Liter) pcs 2.00 250.00 500.00 500.00
Subtotal 8,400.00

PPE, CONSUMABLES, TOOLS 2,100.00


TOTAL (MATERIAL COST) 10,500.00
MISCELLANEOUS AND OVERHEAD EXPENSES 1,050.00
SUPERVISION AND LABOR 3,150.00

PROJECT COST (Labor, Tools and Power Tools Only) 4,200.00

PROJECT COST (Labor and Materials ) 14,700.00

Prepared By:

Jose Carlito Y. Briones Jr. / Andrew Dalugdugan