INSPECTION AND TEST PLAN (I&TP) FOR NON-METALLIC FIBER OPTIC CABLE

Type Factory Acceptance Test

Contract No. / Project Title:


Manufacturer Name: ITP No. : ITP-NFOC-01
Plant Location: Review Cycle No :
Equipment/Material Description: Non-Metallic Fiber Optic Cable Date:
Type of Equipment / Material NMFOC

Applicable Test Insp. Acceptance Criteria Tests Tentativ Remarks Mfr’s


Item Tests Description Sample
Standard procedures Type Location e Dates Compliance
Attenuation at given
48-TMSS-02,
Optical Attenuation at wavelength shall be as
1 Rev.02, Table 1 & 2, IEC 60793-1-40, cl. 8 100% W
@1310/1550/1625 nm per table 1 and 2 of 48-
IEC 60793-1-40
TMSS-02,Rev.2

48-TMSS-02,
2 Attenuation Uniformity Rev.02, IEC 60793-1-40, cl. 8 100% W Discontinuities ≤ 0.1 dB
IEC 60793-1-40

Data of the Source 48-TMSS-02, 100% RC


3 IEC 60793-1
Fibers Rev.02

48-TMSS-02, 20% ≤3.5 ps/nm.km, at 1310


4 Chromatic Dispersion Rev.02, IEC 60793-1-42, cl. 7 number of nm,
W
IEC 60793-1-42 Fiber from ≤18 ps/nm.km at 1550
each drum nm (G.652.D)

48-TMSS-02, 20%
5 PMD ( ps/√ km) Rev.02, IEC 60793-1-48, cl. 6 number of W 0.2. ps/√km (G.652D)
IEC 60793-1-48 Fiber from
each drum
The color of Fibers/
Fiber/Tube color coding 48-TMSS-02, Tubes shall be as per
6 Visual 100% W
and arrangement Rev.02 Table 3 of 48-TMSS-02,
Rev.02.

ITP-NFOC-01 Standards & Specifications Department PAGE 1 OF 2

License=Al Sharif Group & KEC Co. Ltd/SA-881-t Not For Resale ,1/23/2023 8:19:32 PM Saudi Time
INSPECTION AND TEST PLAN (I&TP) FOR NON-METALLIC FIBER OPTIC CABLE

Applicable Test Insp. Acceptance Criteria Tests Tentativ Remarks Mfr’s


Item Tests Description Sample
Standard procedures Type Location e Dates Compliance
Visual checking the The marking shall be as
FOC Outer Sheath 48-TMSS-02, 100% W
7 Marking on NMFOC per 48-TMSS-02, Rev.02,
Marking Rev.02 drums
sheath.

Legend:

W = Witness [by National Grid SA Engineers and/or National Grid SA approved 3rd Party Independent Inspection Agency (IIA) Inspector]
RC = Review of Certificates [by National Grid SA Engineers and/or National Grid SA approved 3rd Party Independent Inspection Agency (IIA) Inspector]

General instructions:
1- Manufacturer’s compliance shall be indicated in front of each test.
2- Approved Data Schedule & final drawings for the equipment / Material shall be attached.
3- Test Procedure & Day-to-day activity schedule shall be attached for approval.
4- The ITP must be duly signed and stamped by manufacturer's authorized personnel.
5- This document is valid for testing after S&SD approval.

Prepared by (Mfr's authorized QC test inspector) Approved by: (Mfr's authorized QA/QC personnel)

Date:
Date:
Manufacturer Stamp

S&SD Approval

ITP-NFOC-01 Standards & Specifications Department PAGE 2 OF 2