INSPECTION AND TEST PLAN (ITP) For Optical Fiber Ground Wire (OPGW)
3. Complete OPGW
10-TMSS-04, Rev.2
3.5 DC resistance at 20°C IEEE1138 4 samples W As per IEEE 1138
IEEE1138
10-TMSS-04, Rev.2
4.1 Diameter ASTM B398M 4 samples RC ASTM B398M
ASTM B398M
10-TMSS-04, Rev.2
4.2 Tensile Strength Test ASTM B398M 4 samples RC ≤95% of specified value
ASTM B398M
10-TMSS-04, Rev.2
4.3 Elongation ASTM B398M 4 samples RC ASTM B398M
ASTM B398M
License=Al Sharif Group & KEC Co. Ltd/SA-881-t Not For Resale ,1/23/2023 8:20:14 PM Saudi Time
INSPECTION AND TEST PLAN (ITP) For Optical Fiber Ground Wire (OPGW)
10-TMSS-04, Rev.2
4.5 Bend Test ASTM B398M 4 samples RC No fracture shall occur
ASTM B398M
10-TMSS-04, Rev.2
5.1 Appearance ASTM B415 4 samples RC ASTM B415
ASTM B415
10-TMSS-04, Rev.2
5.2 Diameter ASTM B415 4 samples ASTM B415
ASTM B415 RC
10-TMSS-04, Rev.2
5.3 Tensile Strength ASTM B415 4 samples ASTM B415
ASTM B415 RC
10-TMSS-04, Rev.2
5.4 Elongation ASTM B415 ASTM B415 4 samples RC ASTM B415
10-TMSS-04, Rev.2
5.5 Conductivity at 20°C ASTM B415 ASTM B415 4 samples RC ASTM B415
10-TMSS-04, Rev.2
5.6 Twist test ASTM B415 4 samples RC ASTM B415
ASTM B415
10-TMSS-04, Rev.2
5.7 Thickness of Aluminium ASTM B415 4 samples RC ASTM B415
ASTM B415
Legend:
W = Witness [by National Grid SA Engineers and/or National Grid SA approved 3rd Party Independent Inspection Agency (IIA) Inspector]
RC = Review of Certificates [by National Grid SA Engineers and/or National Grid SA approved 3rd Party Independent Inspection Agency (IIA) Inspector]
General instructions:
1- Manufacturer’s compliance shall be indicated in front of each test.
2- Approved Data Schedule & final drawings for the equipment / Material shall be attached.
3- Test Procedure & Day-to-day activity schedule shall be attached for approval.
4- The ITP must be duly signed and stamped by manufacturer's authorized personnel.
5- This document is valid for testing after S&SD approval.
License=Al Sharif Group & KEC Co. Ltd/SA-881-t Not For Resale ,1/23/2023 8:20:14 PM Saudi Time
INSPECTION AND TEST PLAN (ITP) For Optical Fiber Ground Wire (OPGW)
Prepared by (Mfr's authorized QC test inspector) Approved by: (Mfr's authorized QA/QC personnel)
Date:
Date:
Manufacturer Stamp
S&SD Approval
License=Al Sharif Group & KEC Co. Ltd/SA-881-t Not For Resale ,1/23/2023 8:20:14 PM Saudi Time