PIP-CL-015

CHECKLIST FOR NOZZLE & CLIP ORIENTATION DRAWING

SHEET 1 OF 2 abc
JOB No:

PROJECT:

DOCUMENT NUMBERS

REVISION DATE PREPARED BY CHECKED BY APPROVED BY

CHECK LIST YES NO N/A COMMENTS

1 Check the Nozzle orientation drawing with P & ID-


Number of nozzles, nozzle tags,nozzle sizes, any specific
requirements indicated in P & ID

2 Check relative orientations of


Nozzles ( e.g.,inlet w.r.to outlet)
Check Nozzle orientation with Process Data sheet,
particularly when internals /
Equipment specification to take care of process
baffles are present.
requirements

3 Nozzle orientation drawing is the


input for Vendor drg. Is it needed
Check Nozzle orientation with vendor drawing
to be checked with Vendor
drawing.

4 Check the following

- Flanges and the RF pads of the nozzles are not fouling

- Nozzles are not fouling and adequate clearance is


provided with weld seam, reinforcing ring/ stiffner ring

- Nozzles are not fouling with the internals


Check clearances on the sides as
- Nozzles are not fouling with external structurals
well as the top of the vessel
- Adequate clearance for the opening of manholes

- Orientation of supports, lifting lug, tailing lug, name


plate, earthing boss, anchor chairs, all nozzles are shown

- Elevation of Bottom T/L & Height of skirt, Under side


elevation of support lug/ring & its distance from Bottom
T/L is shown for vertical vessel.

P:\Andheri\Management\Ashtikar\Check List\PIP-CL-015.doc Rev. 0


PIP-CL-015
CHECKLIST FOR NOZZLE & CLIP ORIENTATION DRAWING
SHEET 2 OF 2 abc
CHECK LIST YES NO N/A COMMENTS

- Table indicating the elevation of all the nozzles from a


Common reference line(Bottom Tan line for Vertical and
Centrelline of Fixed saddle for horizontal vessel), the
projection of nozzles,the size, rating and orientation of
nozzles.

- Centre line elevation of horizontal vessel & Distance of


underside of saddle with centre line vessel is shown. Also
show fixed and sliding saddle.

- Orientation, elevation, extent of platform, ladder,


Staircase, column devit, lightening arrestor is shown.

- Scope of supply of the platform i.e. by the purchaser or


by vendor

- Internals are not located infront of manhole to block the


entry in the vessel

- Cathodic protection requirement & incorporate the


requirements. (Applicable for Vertical storage tanks and
buried vessels)

- Pipesupport cleats along with loading in a tabular format

- Cleats required for instrument/Electrical cables

- Provide loads if lines are supported on the platform.

- Check Slope of bottom plate and orientation of the drain


/ cleanout nozzle for vertical tanks checked.

- Check the extent of spiral staircase, intermediate


platforms,number of steps. Check manholes are accessible
from intermediate landings (For large vertical storage
tanks)

5 QA/QC Review/ Client’s comments

- SDC / IDC comments incorporated

- Clients comments incorporated

P:\Andheri\Management\Ashtikar\Check List\PIP-CL-015.doc Rev. 0