JSA (Job Safety Analysis) Sheet

Activity Name:- Window fixing.

Location:-

Sr.No. Sub-Activity Name Type Of Hazard Risk(s) Involved

Manpower
1 Untrained worker Personal injury
Mobilization

Fall of material,
Personal Injury, cut
Fixing of Window fall of man,
2 injury, property
Frame & Glass. electric
damage
shock,sharp edge

Darkness, fall of
Work during dark Personal injury,
3 person, fall of
hours damage to property
machinery

Name & Signature of Site Engineer / Supervisor :_________

Name & Signature of Project In-charge :__________


JSA (Job Safety Analysis) Sheet

Ref-

Date :

Risk Control measures


Only inducted worker shall be deputed at the work place.
Given Tool Box Talk to all workers.
Required work permits should be taken before start of activity
Work Shall be carried out under continuous Supervision.
Ensure continuos supervision.
Ensure only inspected portable equipments should use for work
Ensure only inspected ladder/ scaffold should use for work
Ensure safety belt(FBSH) above 2 mtr. Height
Ensure tools and material is not kept on window frame .
Ensure required PPE's eg. Safety shoes,reflective jacket,cotton
handgloves,safety helmet, safety goggle etc.
Ensure area below the work is barricaded with signage
Ensure stacking of window frame should not be above 1.5 mtr height .

Deploy trained person for work

Ensure unauthourised enrty in barricated area


Night work permit to be taken from concern engg.and safety dept.
Ensure person can carry weight
Electrical cable should lead min 2 m height. No exposed electrical
wire.Earthing.
Route shall be illuminated.

Name & Signature of Site In-charge :___________

Name & Signature of HSE Officer : ______