Professional Documents
Culture Documents
Vi PDF
Vi PDF
Vi PDF
When approach a modern concept such as 5G, it is realised that the presmise can be nothing more than the promotion of
thought of the future of technology, communication and information. To promote such abstract ideas one must promote specu-
lation and wonder through presenting the viewer with something unconventional yet efficient to stimulate wonder.
AN ARCHITECTURAL
FOLLY MEANT TO PROVOKE .
MASSING LAYOUT LOGIC
SEATING AREA
STRUCURE LOGIC : HYBRID-TENSEGRITY
The main structure has some
member anchored to the
ground and the rest in the air
making this a hybrid struc-
ture.
Basic tensegrity structure which highlights the members in tension and com- Here is the interpretation of a hybrid tensegrity structure applied on to the
pression and each of their forces in relation to each other. concept.
Tensegrity is a prestressed strucutral system, meaning it attains its strength as a The required notion of a floating form is achieved as the main mass never di- INNER FRAMING
whole system that is in unstable equillibrium. rectly touches any compression member.
The floor plate is connected to the main structure and the rest of the loads are
transfered through this floor plate.
OUTER FINISH
80mm DIA
BAMBOO
ROAD
ENTRY
FRAMING OF ONE
MODULE
LAKE
EXPLODED STRUCTURE
SITE PLAN (1:500)
PLANS GREEN AREA
ROAD
ENTRY
LAKE
SITE PLAN (1:200)
EXHIBIT ENTRY
W/C
MEETING W/C +- 00
RM +600
MEETING
OFFICE
+1350 +200
RM OFFICE
OFFICE
RECEPTION
-900
-900 DN FROM EXHIBTION
UP TO EXHIBITION -900
CAFE SEATING/ RELAX- CAFE
+200 ING AREA 600
3350
+600
+3350 +- 00
CONFERENCE
+600 +3100 +-00
RECEPTION
+2100
-900
RECEPTION/RAMP -900
+200
CAFE
CAFE SEATING/ RELAXING AREA
3350
EXHIBITION SPACE: GF
EXHIBITION SPACE: Interactive Experience TO +2100
DN
+4100
Introduction space with projected
information onto inner surfaces EXHIBITION SPACE: EXHIBITION SPACE:
UP Enclosed Experience Exit space with
FR
OM projected onto funtionality from
GF
inner surfaces app on phone.
+4100
+4100
DETAIL A
DETAILS
SINGLE TENSEGRITY UNIT
B’
DETAIL D
4 Cable Joinery Junction
B
A’
DETAIL E
DETAIL F
DETAIL A
Bamboo Anchored To Ground KEY PLAN
DETAIL D
DETAIL E DETAIL B
Multiple Cable Joining Junction
DETAIL B
Bamboo To Bamboo Joinery
DETAIL C
DETAIL A
DETAIL D
SECTIONS
+10100
+4100
+-00
-900
+10100
+4100
B’
+-00
-900
B
A’
DETAIL E
DETAIL F
KEY PLAN SECTION - BB’ (1:200)
KEY PLAN
DETAIL D
DETAIL B
DETAIL C
ELEVATIONS
+10100
+4100
+-00
-900
+10100
+4100
+-00
-900
+10100
B’
+4100
B
A’
-900
DETAIL E
DETAIL F
KEY PLAN
KEY PLAN
DETAIL D
DETAIL B