Check up for Operation of a LIAG / MAN Marine Gen Set

Thank you for choosing a LIAG / MAN MARINE GENERATING SET!


With this document LIAG wants to give you a short overview how to
avoid any failure of your Generating Set so you can look forward to
many years of trouble free operation.

Please Note: This is a summery of the most important matters for operating LIAG Marine Generating Sets. Due to your special
wishes and to latest technological development LIAG can not guarantee for completeness of this document and reserves the
right to modify the content of this document without notification. Please read your complete final documentation for more
detailed information about operation of your LIAG-Generating Set.
Table of content
Revision mark.......................................................................................................................................... 2
General information ................................................................................................................................. 3
Description of Generating Set ................................................................................................................. 3
Instructions to avoid errors and damages: .............................................................................................. 4
Important Addresses and Phone numbers.............................................................................................. 8
Amendment 1: Filling standard for MAN Diesel Engines ........................................................................ 9
Amendment 2: Lifting Instruction........................................................................................................... 10
Amendment 3: Conversion Table.......................................................................................................... 11
Amendment 4: Check List ..................................................................................................................... 12

Revision mark

Rev. Wrought Checked Approved Comment

Name Date Name Name Date Status

01 Loosen 07.05.2010 Loosen 07.05.2010 OK E-Mail adress Spares changed


02 Loosen 21.12.2010 Loosen 21.12.2010 Ok Change to new address

Managing director: Postal address: Delivery address: Tel.: 0049 (0) 2204 48103 - 0 Page 2 / 12
Dipl.-Ing.(FH) Olaf Berghoff Lindenberg-Anlagen GmbH Lindenberg-Anlagen GmbH Fax.: 0049 (0) 2204 48103 - 109
Postfach 5164 Hoffnungsthaler Strasse 417 email: postmaster@lindenberg-anlagen.de Rev.: 02
Trade register: HRB 45514 51486 Overrath 51491 Overrath Internet: www.lindenberg-anlagen.de Date: 17.03.2011
DE 121 961 663 Document-No.:000 014
General information

• This documentation instruction should be kept in a safe place for future use. It does not take all the
design details and variants nor all the possible chance occurrences and events which might happen
during installation, operation and maintenance into account.

• We retain all copyright for all LIAG-Documents . It is intended only for personal use by the owner of
the diesel generator set and / or for operation or installation of the LIAG-Generating Set.

• The documentation contains technical instructions and drawings which may not, as a whole or in
part, be reproduced, distributed or used in any unauthorized way for competitive purposes or
passed on to others.

Description of Generating Set

• LIAG / MAN Marine Diesel Generating Sets produce electricity for several applications depending
on the kind of generating set. A generator, with the help of a diesel engine, produces power to be
used on your ship as an auxiliary for daily use, in harbour mode or as an emergency generating set.

• The LIAG / MAN Generating Set is build by Lindenberg-Anlagen GmbH in Rösrath, Germany. The
main component, the engine, is made by MAN. All spare parts and equipment are available from
Lindenberg-Anlagen GmbH - Spare Parts Department (Spares@lindenberg-anlagen.de). Please
use the spare part numbers which can be found in this documentation for an easy and fast
procedure.

• For technical help or in case of any damages please contact our Service Department
(Service@lindenberg-anlagen.de). Please keep the intervals of maintenances work and follow
the descriptions by manufacturer to prevent unnecessary damages.

Managing director: Postal address: Delivery address: Tel.: 0049 (0) 2204 48103 - 0 Page 3 / 12
Dipl.-Ing.(FH) Olaf Berghoff Lindenberg-Anlagen GmbH Lindenberg-Anlagen GmbH Fax.: 0049 (0) 2204 48103 - 109
Postfach 5164 Hoffnungsthaler Strasse 417 email: postmaster@lindenberg-anlagen.de Rev.: 02
Trade register: HRB 45514 51486 Overrath 51491 Overrath Internet: www.lindenberg-anlagen.de Date: 17.03.2011
DE 121 961 663 Document-No.:000 014
Instructions to avoid errors and damages:
(Most instructions are also summarized in the checklist in Amendment no. 1)

Important instructions
• It may be used only the manufacturer released and specified service and maintenance materials.
(For example filter, lube oil...)

• No warranty can be granted for damages, when the damage is based on working without
consideration of the regulations and / or the operating instructions. If any information cannot be
found in the documentation, please contact LIAG.

Transport
• Keep the instructions for transport and moving. LIAG gives you detailed instruction but you also
need to inform about national and local rules of transportation.

• Only use the bolts, designed for transport to lift up the gen set as shown in this example. Do not use
bolts directly on the engine or on the generator.

• Please see Transport description in Amendment 2 or at your Generating Set.

When lifting Generating Set always keep in mind that the lifting device
may brake.
Do not stand under Generating Set

Storage
• The generating set needs to be stored dry and safe. This includes no direct influence by weather or
seawater. The generating set must not dangle, incline nor be easily moveable.

• In case the generator set is stored for over 12 month the Engine needs to be conserved according
to MAN rule M3069-4 / C3 and arranged and confirmed by LIAG, otherwise warranty cannot be
granted.

Engines
• The LIAG / MAN commissioning certificate for generating sets has to be filled out for every engine.
It has to be sent back to Lindenberg-Anlagen GmbH - Service dept. The commissioning report can
be found in our Working / Final Documentation Chapter1 Notice / Documents.

• Please note that MAN can refuse warranty, if the commissioning certificate is not filled out
and sent back.

Managing director: Postal address: Delivery address: Tel.: 0049 (0) 2204 48103 - 0 Page 4 / 12
Dipl.-Ing.(FH) Olaf Berghoff Lindenberg-Anlagen GmbH Lindenberg-Anlagen GmbH Fax.: 0049 (0) 2204 48103 - 109
Postfach 5164 Hoffnungsthaler Strasse 417 email: postmaster@lindenberg-anlagen.de Rev.: 02
Trade register: HRB 45514 51486 Overrath 51491 Overrath Internet: www.lindenberg-anlagen.de Date: 17.03.2011
DE 121 961 663 Document-No.:000 014
The running generating set makes a noise level above 80 dB (A).
Everybody in the Engine room or near running generating set must
use hearing protection!!

Surface of engine gets extremely hot. Do not touch or contact with


flame able material while or after engine runs!

Generator
• Check that all connection, cable glance and settings have been made as stated in operation /
installation and maintenance instructions by manufacturer to be found in working / final
documentation in Chapter 3 Alternator.

The open generator and cable glance may be energized with


dangerous voltage!

Coupling
• Check with a lamp if the coupling has any obvious damages before starting the engine for the first
time. Please repeat this check before each start of the generating set.

Cooling Water System


• The cooling water level has to be controlled before starting. The needed amount of cooling water for
your engine is stated in the Amendment No 1. Please also check MAN Operation Instruction for
correct filling.

• The requirements for the cooling water as hardness, chloride, sulphates and PH-value have to be
considered and the cooling water has to be filled up with the prescribed additives according to the
regulations of the MAN. These can be checked on the internet page by MAN
http://www.man-engines.com/en/Ship_motors/Ship_motors.jsp. → Approved service products.
The additives have to be filled in, independently of the outside temperature. The antifreeze and
corrosion protection prevents cavitations of the cooling water pump.

• Only use antifreeze according MAN standard 324.

• In the tropics there are also additives according MAN standard 249.

• Chemicals which are permitted for high power engines (for example MAN B&W) can not be used by
MAN engines.

Managing director: Postal address: Delivery address: Tel.: 0049 (0) 2204 48103 - 0 Page 5 / 12
Dipl.-Ing.(FH) Olaf Berghoff Lindenberg-Anlagen GmbH Lindenberg-Anlagen GmbH Fax.: 0049 (0) 2204 48103 - 109
Postfach 5164 Hoffnungsthaler Strasse 417 email: postmaster@lindenberg-anlagen.de Rev.: 02
Trade register: HRB 45514 51486 Overrath 51491 Overrath Internet: www.lindenberg-anlagen.de Date: 17.03.2011
DE 121 961 663 Document-No.:000 014
• For auxiliary engines the cooling water pressure has to be controlled.

The cooling water and additives may be harmful and poisonous


substances!

Lubrication Oil System


• The lubrication oil level has to be controlled before start.

• Just use MAN approved Lubrication Oils. See: Fuels, Lubricants and Coolants for MAN Diesel
Engines, please check the approved products on the internet page by MAN
http://www.man-engines.com/en/Ship_motors/Ship_motors.jsp → Approved service products

• Lubricating oil has to be used according to MAN standard 3275 or 3277.

The Lube oil is strongly flame able. Do not smoke or light fire near
the engine or when refilling lube oil!

Fuel System
• The ship lateral installation, of fuel oil pre filter with water traps, has to be considered.

• The permissible suction height and tank level have to be considered.

• Crude oil is not allowed to be used for MAN High Speed engines.

The fuel oil is strongly flame able. Do not smoke or light fire near
the engine or the fuel oil tank!

Exhaust Gas System


• Compensators have to be inserted with pre loading.

• Please pay attention to the sufficient cross section.

• The line has to be checked to be free of work materials. (steel, papers, tags)

Managing director: Postal address: Delivery address: Tel.: 0049 (0) 2204 48103 - 0 Page 6 / 12
Dipl.-Ing.(FH) Olaf Berghoff Lindenberg-Anlagen GmbH Lindenberg-Anlagen GmbH Fax.: 0049 (0) 2204 48103 - 109
Postfach 5164 Hoffnungsthaler Strasse 417 email: postmaster@lindenberg-anlagen.de Rev.: 02
Trade register: HRB 45514 51486 Overrath 51491 Overrath Internet: www.lindenberg-anlagen.de Date: 17.03.2011
DE 121 961 663 Document-No.:000 014
Exhaust System gets extremely hot. Do not touch or contact with
flame able material while or after engine runs!

Supply Air System


• The cross section of the supply air openings / channels are to be considered in sufficiently
dimensioned. So no water or dust is carried into the engine room.

The distance between in- and outflow holes must be long enough, so
that no short circuit develops!

The air cleaners have to be checked for contamination and damage


before the start.

Check screws if screws are tight and sealed. As well as air pressure
hoses are not damaged.

Compressed Air System (in case of air starter)


• The starting air pipes have to be clean and without condensation.

• It is not allowed to use oil in the start air pipes.

• In the ship lateral air supply line, has to be planned before the starter an air cleaner with automatic
water trap.

• Before using, each starter must have 18Æ30 bar starting pressure. (Depending on type of air
starter the starting pressure may vary.)

Battery Set (if provided by LIAG)


• Batteries need to be vented sufficiently and in adequate ambient temperature.

• Batteries may not remain discharged.

• Batteries may not be overloaded.

Furthermore attention should be paid to following points:


• All lines and connections have to be checked general for tightness. They have to be retightened if
necessary. This check has to be repeated over the whole period of operation time.

• The ambient temperature limit needs to be kept (depending on classification 45° C or 50° C) in the
engine room. Watch out for heating through exhaust material.

Managing director: Postal address: Delivery address: Tel.: 0049 (0) 2204 48103 - 0 Page 7 / 12
Dipl.-Ing.(FH) Olaf Berghoff Lindenberg-Anlagen GmbH Lindenberg-Anlagen GmbH Fax.: 0049 (0) 2204 48103 - 109
Postfach 5164 Hoffnungsthaler Strasse 417 email: postmaster@lindenberg-anlagen.de Rev.: 02
Trade register: HRB 45514 51486 Overrath 51491 Overrath Internet: www.lindenberg-anlagen.de Date: 17.03.2011
DE 121 961 663 Document-No.:000 014
Important Addresses and Phone numbers

LIAG Service Department


• Email: service@lindenberg-anlagen.de
• Phone: +49 (0) 2204 48103 - 0
• Fax: +49 (0) 2204 48103 - 234

LIAG Spare Parts Department


• Email: spares@lindenberg-anlagen.de
• Phone: +49 (0) 2204 48103 - 0
• Fax: +49 (0) 2204 48103 - 232

LIAG Sales Department


• Email: marine@lindenberg-anlagen.de
• Phone: +49 (0) 2204 48103 - 0
• Fax: +49 (0) 2204 48103 - 164

LIAG Postal address


• Lindenberg-Anlagen GmbH - Postfach 5164 - 51486 Overrath

LIAG Delivery address


• Lindenberg-Anlagen GmbH – Hoffnungsthaler Strasse - 51491 Overrath

Webpage
• www.lindenberg-anlagen.de

Managing director: Postal address: Delivery address: Tel.: 0049 (0) 2204 48103 - 0 Page 8 / 12
Dipl.-Ing.(FH) Olaf Berghoff Lindenberg-Anlagen GmbH Lindenberg-Anlagen GmbH Fax.: 0049 (0) 2204 48103 - 109
Postfach 5164 Hoffnungsthaler Strasse 417 email: postmaster@lindenberg-anlagen.de Rev.: 02
Trade register: HRB 45514 51486 Overrath 51491 Overrath Internet: www.lindenberg-anlagen.de Date: 17.03.2011
DE 121 961 663 Document-No.:000 014
Amendment 1: Filling standard for MAN Diesel Engines

Cooling water System * Lube oil system *


Engine type with Cooler with
Engine Summe min. max
radiator cooler pipes
D 0824 LE 201 28 ltr 9 ltr 37 ltr 9 ltr 13 ltr
D 2866 E 20 29 ltr 13 ltr 42 ltr 14 ltr 18 ltr
D 2866 TE 20 29 ltr 13 ltr 42 ltr 14 ltr 18 ltr
D 2866 LXE 20 30 ltr 13 ltr 43 ltr 14 ltr 18 ltr
D 2866 LE 201/203 35 ltr 13 ltr 48 ltr 14 ltr 18 ltr
D 2876 LE 201/203 35 ltr 13 ltr 48 ltr 34 ltr 40 ltr
D 2840 LE 201/203 65 ltr 21 ltr 86 ltr 24 ltr 30 ltr
D 2842 LE 201/203 75 ltr 23 ltr 98 ltr 24 ltr 32 ltr
Engine type without
radiator cooler
D 2866 LXE 30 58 ltr 14 ltr 18 ltr
D 2876 LE 301 58 ltr 26 ltr 30 ltr
D 2840 LE 301 80 ltr 24 ltr 30 ltr
D 2842 LE 301 96 ltr 24 ltr 32 ltr

*: If you have a normal standard Generting Set with MAN engine

Managing director: Postal address: Delivery address: Tel.: 0049 (0) 2204 48103 - 0 Page 9 / 12
Dipl.-Ing.(FH) Olaf Berghoff Lindenberg-Anlagen GmbH Lindenberg-Anlagen GmbH Fax.: 0049 (0) 2204 48103 - 109
Postfach 5164 Hoffnungsthaler Strasse 417 email: postmaster@lindenberg-anlagen.de Rev.: 02
Trade register: HRB 45514 51486 Overrath 51491 Overrath Internet: www.lindenberg-anlagen.de Date: 17.03.2011
DE 121 961 663 Document-No.:000 014
Amendment 2: Lifting Instruction

Managing director: Postal address: Delivery address: Tel.: 0049 (0) 2204 48103 - 0 Page 10 / 12
Dipl.-Ing.(FH) Olaf Berghoff Lindenberg-Anlagen GmbH Lindenberg-Anlagen GmbH Fax.: 0049 (0) 2204 48103 - 109
Postfach 5164 Hoffnungsthaler Strasse 417 email: postmaster@lindenberg-anlagen.de Rev.: 02
Trade register: HRB 45514 51486 Overrath 51491 Overrath Internet: www.lindenberg-anlagen.de Date: 17.03.2011
DE 121 961 663 Document-No.:000 014
Amendment 3: Conversion Table

Pressure

Bar Pascal
1 bar 100000 Pa

Bar Mega Pascal


1 bar 0,1 MPa

Temperature

Fahrenheit to Celsius Celsius to Fahrenheit


( TFahrenheit - 32 ) × 5 / 9 (( TCelsius × 9 ) / 5 ) + 32

Length

Inch Millimetre
1’’ (in) 25,4 mm

Energy

Horse Power Kilowatt


1 horsepower 0,746 kW

Managing director: Postal address: Delivery address: Tel.: 0049 (0) 2204 48103 - 0 Page 11 / 12
Dipl.-Ing.(FH) Olaf Berghoff Lindenberg-Anlagen GmbH Lindenberg-Anlagen GmbH Fax.: 0049 (0) 2204 48103 - 109
Postfach 5164 Hoffnungsthaler Strasse 417 email: postmaster@lindenberg-anlagen.de Rev.: 02
Trade register: HRB 45514 51486 Overrath 51491 Overrath Internet: www.lindenberg-anlagen.de Date: 17.03.2011
DE 121 961 663 Document-No.:000 014
Amendment 4: Check List

Please check following list before first start of the generating sets

The service personnel have read the instruction manuals


------------------------------------------------------------------------------------------------------------------------------------
The cooling water is filled up according to the regulations of the manufacturer
------------------------------------------------------------------------------------------------------------------------------------
The lubrication oil level is in between the limits
------------------------------------------------------------------------------------------------------------------------------------
The permissible suction height and tank level is in between the limits
------------------------------------------------------------------------------------------------------------------------------------
Compensators are inserted with pre loading
------------------------------------------------------------------------------------------------------------------------------------
The cross sections in the exhaust gas system are sufficient
------------------------------------------------------------------------------------------------------------------------------------
The line of the exhaust gas system is free of work materials. (Steel, papers, tags)
------------------------------------------------------------------------------------------------------------------------------------
The cross section of the supply air openings / channels are sufficiently dimensioned
------------------------------------------------------------------------------------------------------------------------------------
The distance between in- and outflow holes is large enough so that no short circuit develops
------------------------------------------------------------------------------------------------------------------------------------
The air cleaners are free of contamination and damage
------------------------------------------------------------------------------------------------------------------------------------
The starting air pipes are free of condensation or dirt
(in case of compressed air starter)
------------------------------------------------------------------------------------------------------------------------------------
Each starter has a starting pressure of the least 18Æ30 bar before start
(in case of compressed air starter)
------------------------------------------------------------------------------------------------------------------------------------
Commissioning certificate is filled out and sent back to LIAG (after commissioning)

Managing director: Postal address: Delivery address: Tel.: 0049 (0) 2204 48103 - 0 Page 12 / 12
Dipl.-Ing.(FH) Olaf Berghoff Lindenberg-Anlagen GmbH Lindenberg-Anlagen GmbH Fax.: 0049 (0) 2204 48103 - 109
Postfach 5164 Hoffnungsthaler Strasse 417 email: postmaster@lindenberg-anlagen.de Rev.: 02
Trade register: HRB 45514 51486 Overrath 51491 Overrath Internet: www.lindenberg-anlagen.de Date: 17.03.2011
DE 121 961 663 Document-No.:000 014

You might also like