Professional Documents
Culture Documents
Pleasure Beach Planning Bridgeport CT Community Meeting 05.09.2011
Pleasure Beach Planning Bridgeport CT Community Meeting 05.09.2011
W elcom e ..
A G EN D A
Part 1: Introductions and Opening Remarks (10 minutes)
Honorable Bill Finch, Mayor, City of Bridgeport State Representative Don Clemens Ted Grabarz, AIA, ASLA, Sustainability Director, Deputy Director of Public Facilities
A G EN D A
Part 1: Introductions and Opening Remarks (10 minutes)
Honorable Bill Finch, Mayor, City of Bridgeport State Representative Don Clemens Ted Grabarz, AIA, ASLA, Sustainability Director, Deputy Director of Public Facilities
EXI N G C O N D I O N S STI TI
FLO O D ZO N ES
Building C onditions
C ondition Study f Building Ref bishm ent at Pleasur Beach or ur e U tilities and pavem ent Existing boar alk dw H ar H ut bor Pavilion
Signif icant H abitat: C oastal sand dunes habitat D EP N atur D iver D ata Base al sity
Sickle-leaf golden aster State Endangered Beach needle grass/Bitter panic grass State Endangered Blazing star State Species of Special Concern Eastern prickly-pear State Special Concern
Blazing Star
Eastern Prickly-Pear
Piping Plover State and Federally threatened species Least Tern State threatened Barn O w l State endangered
PI N G PLO VER PI
State & Federal Threatened Species
LEA ST TERN
State Threatened Species
BA RN O W L
State Endangered Species
O ur G oal:
D evelop a Feasible Program of Park I provem ents and m Prepare C oncept D esign Plans f Future I plem entation. or m
Study O bj ectives
I ntegrate w ork on parallel studies ( buildings, docks, access) Conduct a com prehensive outreach strategy Provide for public safety on site I dentify and protect endangered plants and w ildlife O btain regulatory concurrence I dentify potential program space I dentify a program of future recreation am enities D evelop alternatives and a preferred concept plan D evelop an im plem entation strategy ( com ponents, cost, access, endangered species protection, flood m anagem ent, public safety plan)
Public Safety:
Com m unication Mobility on-site and off-site Lifeguards Park patrol ( seasonal, full-tim e?) Storm notification Storm shelter Site and existing building preparation U tility service ( ater, electric) w
SC O PE O F W O RK
Proj K ick-O ff Meeting ect D ata Collection Site A ssessm ent Stakeholder I dentification Prelim inary Park Program Final Program /Site A ssessm ent/Regulatory Fram ew ork D evelop A lternative Schem atic Plans Refine A lternative Schem atic Plans Conceptual D esign/Final Master Plan D eliverable
PRO J T SC H ED U LE EC
A G EN D A
Part 1: Introductions and Opening Remarks (10 minutes)
Honorable Bill Finch, Mayor, City of Bridgeport State Representative Don Clemens Ted Grabarz, AIA, ASLA, Sustainability Director, Deputy Director of Public Facilities
N ature center Fishing pier ( m ainland and Pleasure Beach) on Concessions/refreshm ents Restroom s Beach ( im m ing and surf fishing) sw Passive open space and picnic area W ildlife sanctuary Paths and trails ( non-m otorized) O bservation and look-out areas
N eeds:
Public aw areness of w ildlife value and conditions A variety of passive recreation activities N eighborhood/youth activities Parking facilities on m ainland D ebris rem oval on m ainland vacant lots Established developm ent space on m ainland Establish reliable access from the East End Site patrols ( security, ecological m onitoring, enforcem ent of rules) Stabilization of existing buildings to prevent further deterioration and vandalism
Challenges:
State and Federal regulatory requirem ents ( CTD EP, U SFW S, A CO E, FEMA ) Protecting endangered and threatened species Establishing reliable access ( how , how often, m onitoring, cost, fee structure) Establishing funding partners ( private, public, non-profit) Capital funding Financial sustainability Staffing for program m ing, m aintenance, public safety, regulatory m onitoring, etc. Public safety and em ergency access
Challenges:
W aste disposal ( trash, sanitary) U tility m aintenance ( electric, w ater, other) Equipm ent and m aterial transport and access Building restoration Stratford and CTD EP role in enforcing access restrictions at Long Beach I pacts of clim ate change/sea level rise on m coastal resources
O pportunities:
A fter school, youth and sum m er cam p program s Youth training in environm ental stew ardship A quaculture education Local business investm ent at gatew ay ( ainm land) EcoTourism Recreational fishing G reen Energy pilot proj w ith corporate ect sponsorship
K eep it sim ple! A void lengthy regulatory review periods Secure existing buildings on site Program m ust allow people and w ildlife to coexist I dentify, delineate and protect sensitive areas Provide public safety m easures Establish access as soon as possible
PRO J T SC H ED U LE EC
Thank you!
Master Plan for Pleasure Beach Park, Bridgeport, CT