JOB TITLE / AIM: Lifting of fibre tank with crane

JSA DATE: 16/03/2023 JSA NO./ REVISION: 00


SUPERVISOR/ JSA LEADER: Ismail Khan SCRIBE:
PARTICIPANTS : Muhammad Imran, Mr. Zahid Hameed, Jamsheed
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1. Mobilization of Equipment/vehicle
2. Lifting & unloading of fiber tank
3. working in live / Green Zone areas
4. Demobilization

Part 3: Equipments / Tools to be used: Heavy Vehicles, Crane, Rigging accessories & Hand Tools
Part 4: Contingency Plans. Standard PPE’s: First aid kit must be present at work site and the HSE personnel will be the first response in case of
emergency, ERPs & Emergency contact numbers to be in placed at job location
Part 5:JSA Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In
case of any new hazard indentified by any of the working team member during the job, JSA review process should be carried on.

JSA No: JOB TITLE: Lifting & unloading of fibre Tank & vehicle/equipment movement
Step Describe Job Step Potential Hazards Hazard Controls
No
1 Mobilization of equipment/vehicle  Crane/vehicle hit with  Ensure banks man to monitor movement
people/equipment & materials of heavy vehicles/crane
 Involvement of unskilled personnel  Ensure JSA briefing & TBT
 Movement of crane/vehicle without  Take care of overhead structures/pipe
presence of banks man racks
 Breaking of culvert due to movement of  Use of appropriate PPE’s
heavy vehicles  Ensure placement of steel plates on culvert
 Vehicles/equipments hit with overhead to avoid its damaging
structure/pipe racks  Hard barricade structures (as required)
 Unauthorised/ uninspected  Only Third party inspected
equipment/tools at site Equipment’s/Tools must be allowed at
work site
 Use right tools for right job
 Personnel injury / property damage  All of materials to be secured while its
transportation to work site
 Close safety supervision
JSA No: JOB TITLE: Lifting & unloading of fibre Tank & vehicle/equipment movement
Step Describe Job Step Potential Hazards Hazard Controls
No
2 Lifting & unloading of steel plates  Uncertified Crane & Operator,  Crane & its operator should be certified
 Personnel/structures hit by movement  Banks man/signal man should be available
of crane  Place crane at levelled & compacted
 Unbalancing of out riggers ground surface
 Unauthorized personnel involvement  Ensure wooden/rubber packing to avoid
 Sharp edges of steel plates damaging of web belts/slings
 Careful handling with steel plates, use of
appropriate PPE’s
 Keep away all unauthorized people during
movement of heavy vehicle/equipments
 Ensure Close HSE monitoring
/supervision
 Be careful of nearby structures/pipe racks
 Third Party Certified Sling broken, load  Ensure proper & inspected accessories
drop being used for lifting operation
 Miscommunication/signal error  Ensure that load is properly placed &
lifted
 Ensure proper communication between
rigger/signal man & operator
 Keep away during crane operation
 Swing area should properly barricaded
 Slip, Trip & fall  Ensure proper stacking of all materials
 Keep access/walk ways always clear from
any obstruction
 Ensure proper housekeeping of workplace
JSA No: JOB TITLE: Lifting & unloading of fibre Tank & vehicle/equipment movement
Step Describe Job Step Potential Hazards Hazard Controls
No
 Inclement weather condition  Stop crane work in case of any inclement
weather conditions (Rain, storm, fog etc.)
 Restrict movement of heavy
vehicles/equipments in rain/fog
 Fire & explosion  Ensure availability of inspected fire
extinguishers at site
 Flame arrestor to be installed in all
vehicles/equipments
4 Demobilization  Same as item one Same as item one

Prepared By: Ismail Khan Approved By: _____________________