CONSTRUCTION OF SIDE METTALED ROAD ALONG NATIONAL HIGHWAY FROM START OF

MISSION PETROL PUMP (MUSAFIR KHANA) TO GULLAN HATTI TOWARDS AHMAD PUR EAST
(LENGTH: 1.00 KM) TEHSIL & DISTRICT BAHAWALPUR (SUGAR CESS)

FIRST RUNNING BILL

Sr. No. Description of Items Qty. Unit Rate Amount (Rs.)


Earth work in ordinary soil for embankment with all
leads and lifts i/c ploughing, and mixing with blade
grade or discharrow or other suitable equipment and
1 compaction by mechanical means at optimum moisture 145.000 %0Cft. 11237.93 1,629,500
contents and dressing to design section complete in all
respect compacted 95% to 100% maximum modified
AASHO dry density
Providing and laying sub base course of crushed stone
agg: of approved quality and grade, i/c placing, mixing
spreading and compaction of sub base course material
2 189.60 %Cft. 19040.74 3,610,124
to required depth, camber and grade to achieve 100%
maximum modified AASHO dry density i/c carriage of
all material to site of work complete in all respect.

TOTAL GROSS AMOUNT 5,239,624