Planning

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6

Planning and Pre-Production

Unit 6: Visual Production

Contents

o Production Schedule
o Script / Shooting Script
o Storyboard
o Props List
o Crew List
o Location Recces
o Clearances and Confirmations
o Contingency Plan
Production Schedule
Please include location, time of film, what you are filming and teams members including actors

Date:
Monday Tuesday Wednes Thursday Friday Saturday Sunday
16th
March

Date:
Monday Tuesday Wednes Thursday Friday Saturday Sunday

Date:
Monday Tuesday Wednes Thursday Friday Saturday Sunday
Crew List

Person Role Dates Needed


Joe Stonell Camera man/DOP

Joe Stonell Editor

Joe Stonell Director


Location Recce
Please produce a location recce for EVERY location used

Location Address:

Wylam, Bracknell RG12 8XS

Bracknell Forest, Bracknell

Lighting Information: Solutions: N/A


Natural Light

Sound Information: Solutions:


Forest Ambiance Microphone and Online SFX

Power Information Solutions: N/A


None

Hazards None Solutions: N/A


Clearances and Confirmations
You need confirmation emails from everyone that is featuring in your music video. Please
screenshot these emails including the dates and times they are agreeing to paste them below.

If you are filming somewhere that requires permission, please obtain permission and paste the
confirmation below.
Contingency Plan
What are your plans for if something goes wrong? What back up actors, locations and
equipment do you have?

You might also like