Intervention Report (Trouble)

Reference: PS1-FORM-08 Redaction Date: 22/10/2019 Review Date: 17/12/2020 Page: 1/1

Intervention Report (Trouble Report)


Plant: Rolling Mill #3 Plant code :911 Work Request n.o Work permit No.

Plant Unit / Area: MILL AREA Area code : Date : Date Time
Asset description: CRANK SHEAR Asset Code / Work Order n.o Date
Parent Asset Description : P. Asset Code Is Production Stopped? x Yes No
x
Requested by : / Is Equipment Stopped? x Yes No
x
Originated by x Mechanical Electrical Operator Others

Work Nature x Mechanical Electrical & Automation Electrical & Automation /Mechanical
x x
Equipment Failed on Equipment available on Job Priority (Check one)

Date: 30/04/2022 Time


00:20
: Date: 30/04/2022 Time : Immediate Within Week When Possible Next Shutdown
Failure Description
After cobble happened in crank shear on 30/04/2022 we faced problem in the gap was widened more than 8 mm, and caused lot off cobble in crank
shear.

x
x

PS1-FORM-08: Intervention Report (Trouble)


Intervention Report (Trouble)
Reference: PS1-FORM-08 Redaction Date: 22/10/2019 Review Date: 17/12/2020 Page: 1/1

Expected Reasons

After cobble happened bottom eccentric crank moved from home position ( the move happened between adapter sleeve and shaft ) and caused the
over gap. This problem happened because of the force of the billet hit impact with the eccentric crank.

Action Taken For Restoration


-Removed the LOWER and upper BLADE HOLDER.
-Removed bottom eccentric crank .
- Removed bottom adapter sleeve and fixed new one.
- Fixed new eccentric crank.
- Adjusted the position ‘0’ between top and bottom eccentric.
-Adjusted gap at 0.2 mm.
- marked between shaft and adapter sleeve .-

Preventive Action (Recommendations & Countermeasures)


-WE will make mark and check of eccentric crank position .

Resources Spare Parts


Craftsman (Labor) Equipment / Material / Special Tool Spares / Oil / Grease
n. Hours n. Hours
Code Trade Description Code Description Code Description Qty.
Act Act Act Act

PS1-FORM-08: Intervention Report (Trouble)


Intervention Report (Trouble)
Reference: PS1-FORM-08 Redaction Date: 22/10/2019 Review Date: 17/12/2020 Page: 1/1

GROUP LEADER 1
TECHNICIEN 3

Distribution Intervener Maintenance Responsible Area Responsible


1- Area Responsible Name Date Name Date Name Date
2- Maintenance Engineer. SAIID 30/04/2022
3- Maint. Planning Engineer
4- Originator’s Copy
5- Doc. Controller

PS1-FORM-08: Intervention Report (Trouble)