W01

W02

ffl ffl
Ngl ffl Ngl
Ngl Ngl
EAST ELEVATION. SOUTH ELEVATION.
100mmØ PVC at 1:40 fall to
Scale 1:100. Municipal sewer connection point. Scale 1:100.
Invert level at min 450 below NGL.

ffl ffl ffl


Ngl Ngl Ngl Ngl

WEST ELEVATION. NORTH ELEVATION.


Scale 1:100. Scale 1:100.

ab ab ab

ab
Serving Counter.
W02

Granite top counter


finish by specialist.

Storage Room.
W01

whb
W01
Invert level at min 450 below NGL.
Municipal sewer connection point.
100mmØ PVC at 1:40 fall to

23 Degrees
Roof pitch. P
by g refab
ang ricat
nail ed
or s timbe
imil
ar a r truss
ppr e
ove s
d.

Reinforced continueous
concrete ring beam.

Eating Room.
interior plaster apply rhinoset
and 1 coat under coat and paint
with 2 coats PVA interior quality
final finish.

Ngl
p p

ab
SECTION P.P.
SCALE 1:100.

CLIENT : Munexy Car Wash.