SHOP DRAWING

- ALL SIZES ARE IN MILIMETERS, UNLESS OTHERWISE PROVIDED IN THE DRAWING

Ø100 KE SUMPPIT 08
- ELEVATION IS IN MILIMETER
- COORDINATE IS IN METER

KEY PLAN

Ø100 FROM FILTER


TO CWT SSL BOP+150

NT-7

ST-2
ST-1
FD
GUTTER

R0 ISSUED FOR REVIEW 15-02-2023


NO REVISI / REVISI0N TANGGAL / DATE
NAMA PROYEK / PROJECT NAME

B Ø100 OVER FLOW PEMBERI TUGAS / OWNER


TP.03 A/B TP.06 A/B TP.05 A/B BOP +150 FFL
PT. ALFA GOLDLAND REALTY
100 OVER FLOW Wisma Argo Manunggal, Lt.18, Jln. Jendral Gatot Subroto Kav.22

400 kg

400 kg

400 kg

400 kg

400 kg

400 kg
OP +150 FFL Kelurahan Karet Semanggi, jakarta Selatan 12930
GUTTER

ARSITEK / ARCHITECTS

GV.100

GV.100

GV.100
INTEGRA DESIGN CONSULTANT

GV

GV

GV
PT. INTER TEKNIKA GRAHANATA
Silkwood Residence Suite OKG-01.GF

BY OTHER

MANHOLE
800X600
LADDER

LADDER
Jl. Lingkar Barat, Alam Sutera.Serpong - Banten
e-mail : studio@integradesignconsultant.com
MANHOLE
800X600
LADDER

LADDER

STRUKTUR / STRUCTURE

FJ

FJ

FJ

FJ

FJ

FJ
FJ.65 FJ.65 FJ.65 FJ.65 FJ.65 FJ.65

TP.01 A/B TP TP TP.07 A/B TP TP TP.02 A/B TP TP


PT. HAERTE (HRT)

STR

STR

STR

STR

STR

STR
STR.65

STR.65

STR.65

STR.65

STR.65
STR.65

GUTTER
GV

GV

GV

GV

GV

GV
GV.65

GV.65

GV.65

GV.65

GV.65

GV.65
M.E.P / M.E.P

GV.100 GV.100 HEADER Ø250


BFV.250 BFV.250

GV

GV
GV GV

GV.100

GV.100
GUTTER GUTTER GUTTER
KONSULTAN PENILAI / QUANTITIY SURVEYOR

HEADER Ø250
BOP SSL+ 388 Ø100 OVER FLOW FV FV Ø100 OVER FLOW PT. RAYYA SATU INDONESIA

BOP +150 FFL BOP +150 FFL


Intiland Tower Level 2, Jl.Jend. Sudirman Kav.23,Jakarta 10220
T: +6221 5795 0338, M: +62 817 409337

KONTRAKTOR UTAMA / MAIN CONTRACTOR

member of ASTRA

MEP

CWT 1 CWT 2 NAMA GAMBAR / DRAWING NAME :

PARSIAL 1
LAYOUT PUMP ROOM

SKALA / SCALE : PARAF / SIGN TANGGAL / DATE


1:50

DIGAMBAR OLEH/DRAWN.BY:
LUTHFI 15-02-2023
DIPERIKSA OLEH/CHECK.BY:

DISETUJUI OLEH/ APPROV. BY: PARAF / SIGN TANGGAL / DATE


SE ARSITEKTUR / ARCH. ENG.

SE STRUKTUR / STR. ENG.

SE M&E / M&E. ENG.

ENGINEERING MANAGER
KERISTIYANTO
NO.GAMBAR / DRAWING NO. REVISI / REVISION
SD-MEP-LV-D&S-P.ROOM-B2-P-001 R0

Ø100 FROM P.DAM NO.GAMBAR REF / REF. DRAWING KODE PROYEK /


PROJECT CODE
TO CWT
CW
Ø4"
PL - 1601 LV