Professional Documents
Culture Documents
Summary Visit EEM - BIMA - BME Kungkilan 10 January 2023
Summary Visit EEM - BIMA - BME Kungkilan 10 January 2023
BPAC
1. Total Coal exposed around 4.000 MT.
2. Target production January 82.421 MT.
3. Production per day is around 2.000 MT/Day
4. High rain intensity & slippery influence of production. Especially at night shift.
5. Crusher plant at stockpile Talang Akar now is ready.
6. Hauling cargo going to IS 107 & Rapen Stock. Daily hauling depending readiness
stock cargo at talang akar. Currently hauling cargo around 2.000 Mt/day
7. During visit weather is Cloudy
BME KUNGKILAN
1. Since 1st January, no coal getting activity due to waiting doc RKAB sign from
ESDM Ministry
Stock Cargo BIMA 48
Date Visit SP. Talang Akar SP.SLR 107 SP.SLR 36 SP. Rapen SP. Fortune Jetty SP SDJ TOTAL
(mt) (mt) (mt) (mt) (mt) Port (mt)
*CC
26-Dec 10.358 2.589 - 7.065 58 9.138 29.208
2-January 9.400 582 - 9.700 10.295 7.980 37.957
10-January 12.200 10.200 - 7.000 17.300 1.386 40.086
Date Visit SP. Talang Akar SP. SLR 107 SP. Rapen SP. Fortune Jetty SP SDJ TOTAL
(mt) (mt) (mt) (mt) Port (mt)
*CC
26-Dec 2.781 130 - - - 2.911
2-January 3.600 130 - - - 3.730
10-January 4.951 130 - - - 5.081
Date Visit STOCKROM SP. PT. MAS SP. Rapen Station SP. Fortune Jetty SP. Jetty WBS TOTAL
(mt) (mt) (mt) (mt)
26-Dec 50.481 9.106 7.612 3.574 6.916 77.689
2-January 45.416 949 3.508 132 10.118 60.123
10-January 45.416 949 3.508 132 10.118 60.123
Stock Cargo BL
Date Visit SP. Serelo SP. SLR 107 SP. Fortune Jetty SP SDJ SP. Rapen TOTAL
(mt) (mt) Port (mt) Station
26-Dec 72 60 329 - 2.084 2.545
2-January 2.200 60 113 - 3.766 6.139
10-January 158 60 483 - 8.566 9.257
Date Visit ROM SP. SLR 107 SP. Fortune Jetty SP SDJ SP. Rapen TOTAL
(mt) (mt) Port (mt) Station
26-Dec 9.302 - 2.373 - 19 11.694
2-January 12.122 - 2.373 - 19 14.514
10-January 16.198 - 2.372 - 19 18.589