This document provides a cooling load estimate summary for multiple buildings and areas of the TECOM Innovation Hub Phase 2 project. It lists the cooling loads in kilowatts for space cooling, fan air handling units (FAHUs), and make-up air handling units (MAHUs) of Buildings 8A and 8B, the basement levels, and boutiques. The total estimated cooling load is 7435.7 kW, with the diversified load at 80% being 5948.5 kW and the total load with 10% spare capacity for future expansion being 6543.4 kW.
This document provides a cooling load estimate summary for multiple buildings and areas of the TECOM Innovation Hub Phase 2 project. It lists the cooling loads in kilowatts for space cooling, fan air handling units (FAHUs), and make-up air handling units (MAHUs) of Buildings 8A and 8B, the basement levels, and boutiques. The total estimated cooling load is 7435.7 kW, with the diversified load at 80% being 5948.5 kW and the total load with 10% spare capacity for future expansion being 6543.4 kW.
This document provides a cooling load estimate summary for multiple buildings and areas of the TECOM Innovation Hub Phase 2 project. It lists the cooling loads in kilowatts for space cooling, fan air handling units (FAHUs), and make-up air handling units (MAHUs) of Buildings 8A and 8B, the basement levels, and boutiques. The total estimated cooling load is 7435.7 kW, with the diversified load at 80% being 5948.5 kW and the total load with 10% spare capacity for future expansion being 6543.4 kW.
This document provides a cooling load estimate summary for multiple buildings and areas of the TECOM Innovation Hub Phase 2 project. It lists the cooling loads in kilowatts for space cooling, fan air handling units (FAHUs), and make-up air handling units (MAHUs) of Buildings 8A and 8B, the basement levels, and boutiques. The total estimated cooling load is 7435.7 kW, with the diversified load at 80% being 5948.5 kW and the total load with 10% spare capacity for future expansion being 6543.4 kW.