Radiography Test of Pipe Joints Night

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6

HAZARD / RISK MANAGEMENT

HAZARD / RISK IDENTIFICATION


Can all personnel in the group answer YES to the following
questions
Will the work involve?
 Have all the significant hazards involved with the Yes/No
 The use of lifting equipment? YES/NO
Job Safety Analysis
Work been identified?
1. Is a separate lifting plan required? YES/NO
 Have control measures been identified for these Yes/No
 Working in a noisy area? Yes/No
hazards?
 Line breaching or potential Hydrocarbon Yes/No
 Have the people responsible for implementing these Yes/No release?
control measures been identified and are the controls
in place?  Any Environmental impact? Yes/No

 Manual handling, moving objects/loads? Base/ Project DFP


 Has the method of communication been agreed Yes/No (If yes obtain/complete a manual handling Yes/No
assessment)
and tested? Work Area DFL WORKSHOP AREA
 Working near objects that may move? Yes/No
 Is everyone aware what is being done at the Yes/No Talk Leader...........................
work-site?  Working in an area with poor lighting or a Yes/No
tight/confined Space?

 Are we aware of what everyone else is doing at Yes/No Supervisor / Foreman:


 Working at height? Yes/No
the work-site?
 Working near areas that could cause personnel Yes/No Date: 24-08-2022
 Does everyone know that any changes to the work Yes/No to slip, trip or fall?
plan have been communicated to everyone involved
 Using portable electric equipment? YES/NO
Operation / Activity description:
in the work?
 Working with dangerous goods and substances YES/NO RADIOGRAPHY TEST OF PIPE JOINTS USING GAMMA
 Does everyone know that any new people joining Yes/No Hazardous to health?
the work party must be given a full and thorough
SOURCE –NIGHT
update of what is going on.  Personnel who are new to the location or each Yes/No 1............................................. 7........................................
other?
2............................................. 8.........................................
If the answer to any of these questions is NO,  Equipment which is potentially dangerous? Yes/No
3............................................. 9.........................................
then the safety of people is at risk.
If so the work may be hazardous and care should 4............................................. 10.......................................
be taken to ensure the work is done safely 5............................................. 11......................................
The talk leader should confirm the Remember, everyone is responsible for:
6............................................. 12.......................................
understanding of the group by asking  Using the correct tools for the job Review by (initials): Action Required
open questions on the above points  Being aware of the hazards around them and remaining vigilant to Updated Procedure
Foreman.......................
change.
Update R. A
 Using the correct PPE. Supervisor....................
 Making themselves aware of, and working within the requirements of
* H.O.D: ..........................
the PTW system and construction procedures.

Saipem Classification - General Use


Complete this document during a Pre Job
meeting and attach it to Relevant Work Permit.

Saipem Classification - General Use


RADIOGRAPHY TEST OF WELD JOINTS BY USING (GAMMA RAY) –DAY/NIGHT
(Planning the work, Transportation of equipment, personnel and tools to the site, Positioning the crane/barriers, Loading and Offloading of material, End of task / general housekeeping .
Possible Hazardous Situations Control in
Operation/Activity Stage Responsible
What are the hazards present in Indicate Necessary Measures to be Taken place
S/N (The steps involved in doing the (Who is going to
the activity and What would the How can the hazards be prevented and/or eliminated N
job) take action) Yes
effects be o
1 Preparation of work in non- 1. Unauthorized entry 1. All the people involve in the activity need to to attend plant HSE
process building area 2. Incompetent personnel induction and sticker to be posted on their helmet Supervisor in- YES
3. Inadequate 2. The list of the names/number of personnel involved in the activity to be charge
information/communication attached with the permit( As Applicable).
4. Poor supervision 3. Only trained and skilled personnel are allowed to perform job in the plant Work
5.Faulty/damaged tools area. supervisor
6. Failure to identify
5. The permit to be approved by the concerned DFL operations
associated work site
hazardous condition 6. Highlighted P&ID or Plot Plan, Method Statement and appropriate JSA to HSE Officer
7.Working without energy be attached to PTW.
isolation 7. Isolation certificate to be applied if work on live systems/equipment and
8. Residual current the isolation number to be mentioned on the Permit (if applicable)
8. Follow PTW, and Highlighted Plot plan for avoiding SIMOPS clash
among different activities in the same location.
9. Ensure proper communication method to be ensured among the teams
working in the area.
10. Competent supervisor or performing authority shall be available at job
location all the time while performing the activity.
11. Proper PPE must be worn (Leather hand gloves, safety shoe, helmet
and coverall etc.).
12. Select the right tool, ensure competent person to inspect tool and tape
with the current color code.
13 Competent work supervisor establish proper interface communication
and understanding of work site hazard within the area
2 Preparation for radioactive • Improper handling of • PTW completed, checked and authorized NDT Sup, YES
work. equipment/materials • Pre job/toolbox talk/JSA discussed, and all hazards and control measures
• Exposure to radiative understood prior to start of work RPS
source to Personnel and • Trained and certified Radiation Protection Supervisor (RPS)
third party • Trained and certified Radiation Safety Officer (RSO) RSO
• Radiation poisoning • Trained and certified Radiation Technicians.
• Risk of cancer • Driver of transport vehicle trained by Radiation Protection Advisor (RPA).
• Falls • PPE issued and worn (safety helmet, safety glasses, leather hand-gloves,
• Slips safety footwear, Lead apron).
•Trips • Radiation survey meter available for measuring curies.
• Use of sub-standard and • Dosimeter badges issued and worn by individuals involved in task.
unapproved source storage • Iridium 192 Gamma ray source with the desired curie used.
compartment while on transit • Radiation warning sign clearly displayed on container containing gamma
to work location ray source.

Saipem Classification - General Use


• Radiation personnel • Transportation vehicle is in good operating condition.
handling source without any • Transport has separate compartment for storage of gamma radioactive
form of radiation protective source
badge • Radiation warning sign Clearly displayed on transport vehicle.
 Radiation work in • Radiation certificate attached to PTW
simops area • Area well illuminated by placing lights for maximum effectiveness at night.
Ensure other work crews are out form radiography work area

3 Loading Radioactive gamma • Slips • Pre-job meeting conducted for personnel involved. NDT YES
source into container and • Trips • RPS/RSO/Radiation Technicians trained and certified Supervisor,
vehicle for transportation to • Falls • RPS/RSO/Radiation technicians load source into source container
work area. • Unauthorized movement • Gamma Source container loaded into separate compartment in the RPS
• Road accident vehicle and kept there during transport.
• Radiation leak • Source container compartment locked during transportation. RSO
• Exposure to radiation • Access/egress clear from all obstructions.
• Radiation poisoning • No personnel allowed in the same compartment as radiation source. Vehicle Driver
• Risk of cancer • RPS, RSO monitor the movement and handling of gamma source.
• Use of sub-standard and • Transportation vehicle is in good operating condition.
unapproved source storage • Transport has separate compartment for storage of radioactive gamma
compartment while on transit source
to work location • Radiation warning sign Clearly displayed on transport vehicle.
•Use of defective vehicle or
vehicle not approved for
source transportation
• Use of vehicle without
adequate/no radiation
warning sign

4 NDT Operations – Exposure to radioactive • Ensure only competent and certified personnel carry out NDT YES
Radiography using Gamma source Operation. Supervisor,
rays (Opened Source), PT. • Loss of containment. • Define/provide applicable work instruction & procedures.
• Human error • Adhere to national and local legislation on the use of radiation RPS
• Incompetency sources & applicable work instruction.
• Faulty equipment • Training & health education for personnel. RSO
• Slips, Trips & Falls •JSA & toolbox talks. Implement PTW system.
• Exposure to radiation • Use suitable PPE (Use of lead shield & apron). HSE Officer
• Radiation poisoning • Equipment certification, Inspection & maintenance,
• Pre-use inspection & testing.
• Install barricade and signs warning personnel radioactive work taking
place 70 meters from source.
• Place beacon light 1 meter beyond the barricades
• Check the area for SIMOPS and remove all other persons from work area
• Source container to be carried manually and kept on level platform/ground
close to weld joint being tested.
• Check by Radioactive survey meter at 70 meters to ensure curies
reading at 0, if not extend barricade (cordon off area) until reading is 0.
• PPE issued and worn (safety helmet, safety glasses/googles, hand

Saipem Classification - General Use


gloves, safety footwear)
• Dosimeter badges worn by RPS/RSO/Radiation Technicians at all times
to prevent overdose of radiation.
• Radiation monitoring and personnel radiation dose records
• Regular health surveillance of personnel, treatment or MEDEVAC
• Area well illuminated by placing lights for maximum effectiveness
5 End of Task/Returning Loss of containment. • Access Control to areas where radiological materials are being NDT YES
gamma source in container used or stored Supervisor
and loading into vehicle • Slips • RPS/PSO/Radiation technician disconnect control box from gamma
• Trips source RPS
• Falls • RPS/PSO/Radiation technician place source back into container, close
• Exposure to radiation and lock it RSO
• Radiation poisoning • Trained and certified RPS/Radiation workers to handle/carry the
• Risk of cancer radioactive source container to vehicle HSE Officer
• RPS/RSO/Radiation technician place source in the designated
compartment in transport vehicle.
• Designate compartment closed and locked
6 Housekeeping. 1. Poor housekeeping • Records of waste disposal in approved dump site. NDT YES
(obstruction) • Remove barricades, signs and lights from the work area. Supervisor
2. Uneven or slippery surface • Clean up the area and place all rubbish in the relevant waste bins.
3. Physically demanding task • Clean control box cables and remote. RPS
4. Defective Hand tools • Check cables, control box and remote for damage prior to return to
store. RSO
5. Pinch points
6. Inadequate supervision • Close out PTW and return to permit holder. HSE Officer
.

! IF ALL THE CONTROLS ARE NOT IN PLACE THE JOB SHALL NOT START !
PPE REQUIRED
Hard Hat Safety Glasses Yes/No Welding Mask/Goggles Air Purifying Respirator Yes/No Life Vest
Yes/No Goggles Yes/No Yes/No Supplied Respirator Yes/No Yes/No
Hear Protection Face Shield Yes/No Gloves Lifeline/Body Harness Yes/No Other
Yes/NO Yes/No Yes/No
Safety Shoes Welding Leathers Which..............................................
Yes/No Yes/No
Rain coat
Yes/No

PREPARED BY: SIGNATURE & DATE:

REVIEWED BY: SIGNATURE & DATE:

Saipem Classification - General Use


APPROVED BY: SIGNATURE & DATE:

Saipem Classification - General Use