REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE REGIONAL DIRECTOR
REGIONAL OFFICE IX, ZAMBOANGA CITY

CONSTRUCTION OF
MUNICIPAL POLICE STATION BUILDING

(STANDARD PLAN)

SUBMITTED: RECOMMENDING APPROVAL: APPROVED:

SATURNINO C. TORREFRANCA KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV


DISTRICT ENGINEER ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
OIC - CHIEF, PLANNING & DESIGN DIVISION
Y Z Y Z

1 2 3 4 1 2 3 4
12.00 12.00
4.00 4.00 4.00 4.00 4.00 4.00
0.90 3.10 1.20 2.80 0.93 3.08 3.00 1.00 2.20 1.80
1.63 2.25 1.10 1.10 PRE-PAINTED (LONG SPAN)
RIBBED TYPE G.I. ROOFING
SHT. (WHITE COLOR)
.50 .50 .50

ELEV. RD RD
0.00 LINE OF ROOF
W W
up 3 7
1
2

2.00
3 ELEV. T&B W W W
0.54 2 3 3 RD

3.39
RD
.50

.50
D D ARMORY
A 5 3
ELEV.
A W 15
A

SEE DET. OF WALL PARTITION


20

1.19
W D D JAN. 0.45
sho. 5
4 FEMALE 7 4 T&B D dn

OF DETENTION CELL
2.43

2.43

LANDING
DETENTION W REST
W D 4

2.93

2.93
CELL 2 ROOM 13 W
6 4 T&B
X X

1.24
6
1.10

sho.
4.00

4.00

4.00

4.00
1.54
up D D LOCKER
up
D
X 6 1 5
8.2
X 3
D
1 5
W
1.57

1.57
W

.50
MALE 1.30 D 5 2 HALLWAY EVIDENCE
4 DETENTION COP/DEP. COP
8.1
8.00

CELL
B B RADIO
B
.50

.50

2.42
1.40
RM
1.00

3.25
1.13

1.25
D W W

1.43

LOCKER
ADMIN/LOG/ D D
OF LADDER RUNG 7 5 2 5
℄ FIN/PCR 2 3
℄ OF LADDER RUNG

.60
ELEV. D
D 0.60 2
4.00

4.00

4.00

4.00
INTEL/ 2
LOBBY CONFERENCE
3.00

INVESTIGATION
2.87

W ROOM

2.70

2.65
2.57
W D QUARTERS OPNS W
EVIDENCE

D WCCD/GAD 1 2

1.82
2 2 (w/ juvenile area)
1 W 10mm THK.
W W 2 CONCRETE W W W
1 1 LEDGE 1 1 1
C C C
.50

.50
RD RD 10mmTHK
ELEV.

2.15
1.90

CONCRETE
0.58

slope

slope

slope

slope
LEDGE
PORCH

2.80
4
.90

RAMP
1 UP
up
.80 ELEV.
0.00

.80 2.30 1.70 1.75 2.25 .80


1.50 3.00 .80 4.00 4.00 4.00
3.75 .30 4.20 1.50

1 2 3 4 1 2 3 4
Y Z Y Z

GROUND FLOOR PLAN SECOND FLOOR PLAN


SCALE 1:100 M SCALE 1:100 M

LEGEND :

@ 6" CHB MASONRY WALL

@ 4" CHB MASONRY WALL

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. NO.:
SHEET NO.
GROUND FLOOR PLAN
REPUBLIC OF THE PHILIPPINES SECOND FLOOR PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF
REGIONAL OFFICE IX POLICE STATION BUILDING A-02
VETERANS AVENUE EXT., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
NELLY S. MUHSIN ENGINEER III DISTRICT ENGINEER
KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 02 27
(STANDARD PLAN) ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019
Y Z

1 2 3 4 1 2 3 4
12.00 12.00
4.00 4.00 4.00 1.20 4.00 4.00 4.00 1.20
.45 2.60 .70

PRE-PAINTED (LONG SPAN)


RIBBED TYPE G.I. ROOFING
SHT. (WHITE COLOR)

LINE OF ROOF RD RD RD RD

1.20
FD FD
A 13
A A RD RD A
1.33

D
8.2 dn

LANDING
W

2.93
10
6
X
1.60

X 5
.50
8.00

8.00
FD
FD
OF LADDER RUNG COVERED ROOF DECK

.70

℄ OF LADDER RUNG
STEEL PLATE
.55 MANHOLE
3.00

STEEL PLATE

2.57
MANHOLE

RD RD
C FD FD C C C

.50
FD FD

1.20

1.20
LINE OF ROOF RD RD RD RD

.80 .45 2.60 .45 .80


1.20 1.20

1 2 3 4 1 4
Y Z

THIRD FLOOR PLAN ROOF PLAN


SCALE 1:100 M SCALE 1:100 M

LEGEND :

@ 6" CHB MASONRY WALL

@ 4" CHB MASONRY WALL

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. NO.:
SHEET NO.
THIRD FLOOR PLAN
REPUBLIC OF THE PHILIPPINES ROOF PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF
REGIONAL OFFICE IX POLICE STATION BUILDING A-03
VETERANS AVENUE EXT., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
NELLY S. MUHSIN ENGINEER III DISTRICT ENGINEER
KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 03 27
(STANDARD PLAN) ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019
4 3 2 1 PRE-PAINTED (LONG SPAN) C A
RIBBED TYPE G.I. ROOFING
SHT. (WHITE COLOR)

1.20 1.20
APEX LINE OF TRUSS-1 APEX LINE OF TRUSS-1
1.50

1.50
FIRING HOLE
TOP OF ROOF BEAM TOP OF ROOF BEAM

20mmØ BAR
TOP OF PARAPET 10mm THK. LADDER RUNG
2.70

2.70
CONCRETE (SEE DETAIL) PRE-PAINTED (LONG SPAN)
LEDGE RIBBED TYPE G.I. ROOFING
SHT. (WHITE COLOR)
1.30

W
3RD FIN.FLR.LINE 3RD FIN.FLR.LINE 6

.70

.70
BOTTOM LINE OF CONCRETE LEDGE W
6
11.80
3.50

3.50
W W W
5 W W 2 2
3 3
W W
SECOND FIN.FLR.LINE SECOND FIN.FLR.LINE 5 6

.55
W
6
CONCRETE
3.50

3.50
MOULDING W W
W (SEE DETAIL)
W 2 6
7 3 D
5
W
GROUND FIN.FLR.LINE GROUND FIN.FLR.LINE 5
.60

.60
ELEV. ELEV.
0.00 FIN. GROUND LINE 0.00

REAR ELEVATION RIGHT SIDE ELEVATION


SCALE 1:100 M SCALE 1:100 M

1 2 3 4
A C

1.20
1.20
APEX LINE OF TRUSS-1 APEX LINE OF TRUSS-1
1.50

1.50
TOP OF ROOF BEAM TOP OF ROOF BEAM

0.63
TOP OF PARAPET
2.70

2.70
1.30

3RD FIN.FLR.LINE 3RD FIN.FLR.LINE

.70

.70
BOTTOM LINE OF CONCRETE LEDGE BOTTOM LINE OF CONCRETE LEDGE FIRING HOLE
10mm THK.
11.80
3.50

3.50
10mm THK. CONCRETE
W W W LEDGE W W
CONCRETE
1 1 1 LEDGE 2 1

W
SECOND FIN.FLR.LINE SECOND FIN.FLR.LINE 5
.70

BOTTOM LINE OF CONCRETE LEDGE BOTT. LN.OF CONCRETE LEDGE

.16
3.50

3.50
W W TOP OF WINDOW SILL W
1 1 W W 2
D 4 4
1
GROUND FIN.FLR.LINE GROUND FIN.FLR.LINE
.60

.60

.60
ELEV. ELEV. ELEV.
0.00 GROUND LINE 0.00 0.00

FRONT ELEVATION LEFT SIDE ELEVATION


SCALE 1:100 M SCALE 1:100 M

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. NO.:
SHEET NO.
FRONT ELEVATION
REPUBLIC OF THE PHILIPPINES REAR ELEVATION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF
REGIONAL OFFICE IX POLICE STATION BUILDING
RIGHT SIDE ELEVATION A-04
VETERANS AVENUE EXT., TETUAN, ZAMBOANGA CITY LEFT SIDE ELEVATION PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
NELLY S. MUHSIN ENGINEER III DISTRICT ENGINEER
KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 04 27
(STANDARD PLAN) ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019
2 3 4 3 4
NON-SKID PLAIN CEMENT
FLOOR FINISH WITH GROOVE
LINES SPACED @ .10m O.C.

40mmØ TEXTURED STAINLESS 40mmØ TEXTURED STAINLESS


STEEL HANDRAIL AND RAILINGS STEEL HANDRAIL AND RAILINGS

.10
ELEV.
1
0.58
1.90

A-06

1.20
1.40
.30 4.30 1.06 .35
PORCH

LANDING
4 EQUAL PARTS

2.80
.10
4

.20
3 .10

.90

.20
.90

1.40

.15
RAMP

.80
ELEV.

.10
1
UP

.15
0.58

.10
up ELEV.

.25
0.00
ELEV. .10
0.00 1.50 3.00 .10
.10
4.20 1.50
4.20 1.50

DETAILED PLAN OF RAMP (BP344) 1 DETAILED SECTION AT RAMP (BP344)


SCALE 1:50 M A-06 SCALE 1:50 M

1 2 3 4 1 2 3 4 1 2 3 4
12.00 12.00 12.00
4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00

.40mm THK. PRE-PAINTED


METAL SHT. CEILING FINISH
WHITE COLOR MINI RIB TYPE

EXPOSED CONCRETE SLAB


WITH SEMI-GLOSS LATEX .40mm THK. PRE-PAINTED
PAINTED FINISH METAL SHT. CEILING FINISH
WHITE COLOR MINI RIB TYPE

CEIL.HT.
3.00
CEIL.HT.
2.60
A A CEIL.HT.
A A
2.60
EXPOSED
CONCRETE
BEAM X CEIL.HT. CEIL.HT.
X X
4.00

2.75 2.60

CEIL.HT. CEIL.HT.
3.00 2.75
8.00

B B B
CEIL.HT. CEIL.HT.
3.00 3.00
EXPOSED
4.00

CONCRETE
CEIL.HT.
BEAM
CEIL.HT. CEIL.HT.
2.80 2.75 3.00
CEIL.HT.
CEIL.HT.
3.00
3.00

C C C C
CEIL.HT.
3.10

4.5mm HARDIFLEX PAINTED


CEILING FINISH ON METAL
FURRING CEILING JOIST
CONCRETEB LEDGE WITH
SEMI-GLOSS LATEX PAINTED LEGEND :
FINISH (COLOR WHITE)

CEIL.HT. CEILING HEIGHT


2.75 IN METERS HEIGHT
1 Y Z 4 1 Y Z 4 FROM FINISH FLOOR 1 Y Z 4
GROUND FLOOR REFLECTED SECOND FLOOR REFLECTED THIRD FLOOR REFLECTED
CEILING PLAN CEILING PLAN CEILING PLAN
SCALE 1:100 M SCALE 1:100 M SCALE 1:100 M

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. NO.:
SHEET NO.
GROUND FLR. REFLECTED CEIL. PLAN
REPUBLIC OF THE PHILIPPINES SECOND FLR. REFLECTED CEIL. PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF THIRD FLR. REFLECTED CEIL. PLAN
REGIONAL OFFICE IX POLICE STATION BUILDING A-06
VETERANS AVENUE EXT., TETUAN, ZAMBOANGA CITY BP 344 RAMP DETAILS PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
NELLY S. MUHSIN ENGINEER III DISTRICT ENGINEER
KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 06 27
(STANDARD PLAN) ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019
1 10mm THK.
CONCRETE
LEDGE

1 2 3 4 1 .35

3RD FIN.FL00R LINE


1.20 1.20

APEX LINE OF TRUSS-1

.70
1.50

TOP OF ROOF BEAM TOP OF ROOF BEAM TOP OF ROOF BEAM

.50
TOP OF PARAPET
2.70

2.70
1.30

.70
3RD FIN.FLR.LINE COVERED ROOF DECK 19 3RD FIN.FLR.LINE 3RD FIN.FLR.LINE
.70

.70 .70
1.66

19 RISERS@ .184
TOP OF WINDOW SILL
10 LANDING F.F.L. (STEP 10)
3.50

3.50

3.50
W
2
D
SPOT DETAIL

1.84
5
3
SCALE 1:20M
SECOND FIN.FLR.LINE COP/DEP. COP HALLWAY 20 1 SECOND FIN.FLR.LINE SECOND FIN.FLR.LINE

1.23

20 RISERS@ .175
15
13 LANDING F.F.L. (STEP 13) CONCRETE
0.15

W W MOULDING
3.50

3.50

3.50
10
4 4

2.28
D
5

1.50
5
MALE
GROUND FIN.FLR.LINE DETENTION CELL 1 GROUND FIN.FLR.LINE GROUND FIN.FLR.LINE
ARMORY

.15
ELEV.
.60

ELEV. FIN. GROUND LINE 0.45

.075
0.00

.075

LONGITUDINAL SECTION X-X BAY SECTION


SCALE 1:100 M SCALE 1:100 M
SPOT DETAIL
SCALE 1:20M
A B C C A

1.20 1.20

APEX LINE OF TRUSS-1 APEX LINE OF TRUSS-1


1.50

1.50
TOP OF ROOF BEAM TOP OF ROOF BEAM
2.70

2.70
2.60

2.25
D
8.2
1.30

1.30
3RD FIN.FLR.LINE COVERED ROOF DECK 3RD FIN.FLR.LINE COVERED ROOF DECK 19
.70

11.80
10
3.50

3.50
2.60

D D D
4 2 .10 3
RADIO
SECOND FIN.FLR.LINE T&B QUARTERS SECOND FIN.FLR.LINE OPNS ROOM
.10 .15

20

CEILING LINE AT PORCH


13 13
D
3.50

3.50
D
3.10

5 1

3.00
D D D D D
4 2 2 2 2
WCCD/ ADMIN/LOG/
GROUND FIN.FLR.LINE 1 GAD FIN/PCR ARMORY
LOBBY PORCH
ELEV.
.60

.60
ELEV. 0.45 ELEV.
0.00 0.00

CROSS SECTION Y-Y CROSS SECTION Z-Z


SCALE 1:100 M SCALE 1:100 M

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. NO.:
SHEET NO.
LONGITUDINAL SECTION X - X
REPUBLIC OF THE PHILIPPINES CROSS SECTION Y - Y
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF CROSS SECTION Z - Z
REGIONAL OFFICE IX POLICE STATION BUILDING A-05
VETERANS AVENUE EXT., TETUAN, ZAMBOANGA CITY BAY SECTION PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
NELLY S. MUHSIN ENGINEER III DISTRICT ENGINEER
KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 05 27
(STANDARD PLAN) ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019
2.80
.35 .50 1.80 .50 .35 .90 .80 .70 .90 .35 .80 .80 .90
2 EQUAL PARTS .33
25mmØ .15 .50 .15 25mmØ 25mmØ .90
STEEL STEEL STEEL
GRILLS GRILLS GRILLS
ROLL-UP DOOR CASE

.35

.35
F F F F F

F F

.90

.90
5 EQUAL PARTS

.60
F F

.21
2.45

2.45
.50
2.10

2.10

2.10

2.10

2.10

2.10

2.10

2.10

2.10
.30

.30
F F

1.85
F F

.90

.90

.40
F F
FINISH FLOOR LINE

1/4"THK.TINTED GLASS ON ALUMINUM POWDER WOOD PANEL TYPE WOOD PANEL TYPE HOLLOW CORE FLUSH 1/4"THK.TINTED GLASS ON ALUMINUM SWING TYPE STEEL DOOR SWING TYPE STEEL GRILL SWING TYPE STEEL GRILL SWING TYPE STEEL DOOR
D COATED FRAME (BLUE COLOR) SWING TYPE D SWING DOOR ON 2"X 5" D SWING DOOR ON 2"X 5" D TYPE SWING DOOR WITH D POWDER COATED FRAME (BLUE COLOR) D WITH 25mmØ STEEL GRILLS D DOOR WITH 25mmØ VERT. D DOOR WITH 25mmØ VERT. D WITH LOUVER (AS SHOWN)
1 DOOR WITH 1/4"THK TINTED FIXED VIEWING 2 WD. DOOR JAMB 3 WD. DOOR JAMB 4 1/4"THK. MARINE PLYWD. 5 SWING TYPE DOOR WITH 1/4"THK TINTED 6 (AS SHOWN) & W/COMPLETE 7 STEEL GRILLS(AS SHOWN) 8.1 STEEL GRILLS AND RECEIVING 8.2 AND WITH COMPLETE NITE
GLASS ON BOTH SIDES AND TRANSOM AS FACINGS ON 2"X 5" WD TRANSOM AS SHOWN NITE LATCH LOCK ON STEEL W/COMPLETE NITE LATCH COUNTER (AS SHOWN) LATCH LOCK ON STEEL
SHOWN (PROVIDED WITH STEEL ROLL-UP DOOR DOOR JAMB (PROVIDED WITH ACCORDION DOOR) DOOR JAMB LOCK ON STEEL DOOR JAMB W/COMPLETE NITE LATCH DOOR JAMB
AND ACCORDION DOOR ON BOTH SIDES) LOCK ON STEEL DOOR JAMB
LOCATION : PORCH/LOBBY OFFICES PWD TOILET, RADIO RM., JANITOR'S RM., REAR ENTRANCE DETENTION HOLDING AREA DETENTION CELLS ARMORY ROOM ARMORY RM., ROOF DECK
REST ROOM TOILET AND BATHS
SET : 1 SET 7 SETS 3 SETS 3 SETS 1 SET 1 SET 2 SETS 1 SET 2 SETS

2.10 1.40 .50 1.00 .70 2.40 2.00


3 EQUAL PARTS 2 EQ. PARTS

2 EQ. PARTS
.35

.35

.35

.35
F F F F F F

.70

.60

.60
.70
2 EQ. PARTS
1.55
1.20

(VERIFY ELEVATION)
VARIES

2.3625
2.45

2.45

2.45

2.45

2.45
2.10

2.10

2.10

2.10

VARIES

1.7625
1.75
.90

.90

.90
FINISH FLOOR LINE

1/4"THK.TINTED GLASS ON ALUMINUM 1/4"THK.TINTED GLASS ON ALUMINUM 1/4"THK.TINTED GLASS ON OPEN WINDOW WITH 25mmØ 1/4"THK.TINTED GLASS ON
W POWDER COATED FRAME (BLUE COLOR) W POWDER COATED FRAME W ALUMINUM POWDER COATED W VERTICAL PLAIN BARS SPACED W ALUMINUM POWDER COATED W 200mm X 200mm GLASS BLOCK W 200mm X 200mm GLASS BLOCK
SLIDING WINDOW WITH 1/4"THK TINTED 3 LAYERS (AS SHOWN) 3 LAYERS (AS SHOWN)
1 2 (BLUE COLOR) SLIDING WINDOW 3 FRAME (BLUE COLOR) AWNING 4 AT 50mm O.C. 5 FRAME (BLUE COLOR) 2-PANELS 6 7
FIXED TRANSOM (AS SHOWN ) WITH 1/4"THK TINTED FIXED WINDOW WITH 1/4"THK TINTED AWNING WINDOW (AS SHOWN)
TRANSOM (AS SHOWN ) FIXED TRANSOM (AS SHOWN )

LOCATION : INTEL, GAD, QUARTERS, CONFERENCE RM, CPNS INTEL, GAD, REST ROOM, CPNS PWD TOILET , TOILET AND BATH DETENTION CELLS ADMIN, RADIO RM., COP.DEP / COP STAIRWAY , ARMORY RM. ARMORY RM.

SET : 6 SETS 5 SETS 3 SETS 2 SETS 4 SETS 5 SETS 1 SET


2.10 1.40 .50 .70
WINDOW GRILLS :

.70
USE 12.5mm X 12.5mm
SQUARE BAR
1.50

1.50

1.50
WINDOW GRILLS
(PROVIDE GRILLS ONLY AT
GROUND FLOOR WINDOWS)
(LAYOUT AS SHOWN)

STEEL GRILLS
25mm Ø ROUND BAR 1 SCHEDULE OF DOORS AND WINDOWS D
SPACED @ .10 MTRS. STIFFENER COLUMN A-07 SCALE
6
SIZE: 0.10 X 0.30 M. 1:50 M
4-12MMØ VERT. BARS
STEEL GRILL DOOR STEEL GRILL DOOR TIES- 1@0.05, 4@0.10,
25mm Ø ROUND BAR 25mm Ø ROUND BAR 4@.15 REST @0.20M. OC FIRING HOLE W' 5.18
10-15CM THK.
MASONRY WALL 0.80
STEEL PLATE
.10

BOT. OF FLR. SLAB TOP OF SLAB

1.30 0.10
.45

IN STEEL HINGES 0.50 0.50 0.50


BOT. OF FLR. BEAM SWING COVER BOT. OF SLAB
STEEL GRILLS
1.40

D
TOP OF PARAPET WALL
D
7 7
HIGH +- 0.12 M

STEEL GRILLS
3.50

3.50
25mm Ø ROUND BAR
SPACED @ .10 MTRS.

1.30
1.00 1.00
2.10

0.85M

2.15
2.10
CONCRETE 0.80 0.30 0.90 0.80 25mmØSQUARE BAR
THRESHOLD D7 D7 PARAPET (CONCRETE) WALL STEEL GRILLS
FLOOR LINE SEE STRUCTURAL DETAIL STEEL DOOR
TOP PLAN D
.10

FFL 6 STEEL DOOR JAMB


W/ NITE LATCH LOCK
ELEVATION CONCRETE
THRESHOLD COMBAT HOLES DETAIL DETAIL OF WALL PARTITION FOR
2 DETAIL OF CUSTODIAL DETENTION CELL 3 @ ROOFDECK LEVEL 4 FOR HOLDING AREA @ DETENTION CELL
A-07 SCALE 1:50 M A-07 SCALE 1:30 M A-07 SCALE 1:50 M

PROJECT & LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:
SCHEDULE OF DOORS AND WINDOWS
REPUBLIC OF THE PHILIPPINES DETAIL OF CUSTODIAL DETENTION CELL JUDY ANN F. ALCEDO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF DETAIL OF WALL PARTITION FOR
ENGINEERING ASSISTANT
(REG. ARCHITECT)
REGIONAL OFFICE IX POLICE STATION BUILDING HOLDING AREA AT DETENTION CELL PREPARED:
A-07
VETERANS AVENUE EXT., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
COMBAT HOLES AT ROOF DECK DETAILS ENGINEER III DISTRICT ENGINEER
KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 07 27
(STANDARD PLAN) NELLY S. MUHSIN CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ARCHITECT III
DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019
1.65
3/4" THK PLYWOOD
CABINET PANEL DOOR
0.60

0.60
STAINLESS STEEL

0.60
LOCKER
D EVIDENCE
2 CABINET HANDLE
SLIDING
STEEL DOOR
FLOOR LINE
ACCORDION 1.80 PNP BLUE, PAINTED FIN.
STEEL ON 4" CHB BUILT UP CASING
INTEL/ CONCEALED W/ 10MMØ DOWEL
HINGES FOR @ 800MM AND
INVES TOP PLAN CEILING LINE LOCKER HINGE CONTROL JOINT

TOP PLAN 0.45 0.45 0.45 0.45 HANGER ROD


1.00M
1.65 .50M

0.50

0.35
.40M
1 3 5 7

1.20

1.20
3/4" THK PLYWOOD

3.50
CABINET/SHELVES/
0.50 0.50
PARTITION SIDINGS
ACCORDION DOOR
HT. OF STEEL PLATE ACCORDION DOOR
DOOR CORNER COLUMN CASE MID-COLUMN CASE

2.40

2.40
3.50M

OPENING
ALUMINUM SHELVES
PLAIN ALUM. SHTS 2 4 6 8
2.10M

CHB WALL
ON ALUM. FRAME
PLAIN ALUM. SHTS COLUMN CASING DETAILS

1.20

1.20
3
ON ALUM. FRAME USE: A-08 SCALE 1:20 M
LIGHT GAUGE METAL FURRING
FFL FOR THE CABINET FRAME
(ALUM. METAL FURRING)
FLOOR LINE
FRONT ELEVATION SIDE DETAIL
FRONT VIEW SIDE VIEW

1 DETAIL OF EVIDENCE CABINET 2 DETAIL OF LOCKERS CHB WALL


A-08 SCALE 1:50 M A-08 SCALE 1:25 M

STEEL MANHOLE
SEE DETAIL
BOT. LN. OF PARAPET 0.15
0.50 M.
0.45 1/4" X 2" FLAT BAR FRAME
LADDER WIDTH 0.15
WELDED CONNECTION
LADDER RUNG
10MM Ø BAR HANDLE SEE DETAIL 20MM DIA ROUND BAR
PARAPET WALL

CHECKERED PLATE 0.45 LADDER RUNG


LADDER RUNG

MANHOLE COVER ON A 1/4" X 2" FLAT BAR FRAME

0.30
GRAB BAR

1/4" X 1" X 1" ANGLE WELDED CONNECTION


HEIGHT

STEEL HINGES

CHB WALL
4.60

BAR FRAMING
PARAPET WALL

W
1

0.50

0.30
0.60

0.60
1/4" X 1" X 1" 1/4" X 1 1/2" X 1 1/2" 20MM DIA ROUND BAR
0.70

ANGLE BAR FRAMING ANGLE BAR FRAMING GRAB BAR SPACED


0.30
BLDG LN. BELOW

@0.30M O.C.

0.30
6" THK CHB WALL
ROOFDECK FLOOR LINE
0.10

1/4" DIA EXPANSION BOLT


STEEL HINGES SPACED @ 0.60 M. OC.

0.30
0.60

0.60
0.40

1/4" X 2"ANGLE BAR


WELDED CONNECTION

0.30
LADDER RUNG
0.30

SEE DETAIL 1/4" DIA EXPANSION BOLT 1/4" X 2" ANGLE BAR
WELDED CONNECTION

0.60

0.60

0.30
TOP PLAN W
2
3.00

TOP VIEW
SCALE 1:10 M

SECTION DETAIL
NGL
FRONT VIEW
LADDER RUNG ELEVATION SIDE VIEW
4 DETAIL OF MANHOLE COVER PLATE SCALE 1:50 M
SCALE 1:20 M
SCALE 1:20 M
A-08 SCALE 1:10 M
5 TYPICAL GRAB BAR LADDER RUNG DETAIL
A-08
PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. NO.:
SHEET NO.
DETAIL OF EVIDENCE CABINET
REPUBLIC OF THE PHILIPPINES DETAIL OF LOCKERS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF COLUMN CASING DETAILS
REGIONAL OFFICE IX POLICE STATION BUILDING A-08
VETERANS AVENUE EXT., TETUAN, ZAMBOANGA CITY
DETAIL OF MANHOLE COVER PLATE PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
TYP. GRAB BAR LADDER RUNG DETAIL NELLY S. MUHSIN ENGINEER III DISTRICT ENGINEER
KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 08 27
(STANDARD PLAN) ARCHITECT III CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019
300X300 UNGLAZED CERAMIC 300X300 GLAZED CERAMIC
3 WALL PAINT FINISH WALL PAINT FINISH WALL PAINT FINISH FLOOR TILES WALL TILES

300X300 GLAZED CERAMIC 300X300 GLAZED CERAMIC 300X300 GLAZED CERAMIC 1.10
2.05 WALL TILES WALL TILES WALL TILES
0.90
1.00
0.70 4.5MM HARDIFLEX 4.5MM HARDIFLEX 4.5MM HARDIFLEX
CEILING FIN CEILING FIN CEILING FIN 0.70

W
3

CEILING CEILING
LINE LINE

0.70

0.90
W

T&B
2.00
1.70

3.50

1.10
0.695

1.00
2.40

2.40
0.35

2.10

2.10

1.50
D

1.875
1.75

0.60
A

1.50

1.50

1.50
3

0.80
0.80

0.58
0.05
FFL
0.80
1.325 0.925
SECTION "1" SECTION "2" SECTION "3"
PLAN

BP344 PWD TOILET AND BATH DETAILS DETENTION CELL TOILET DETAILS
1 @ GROUND FLOOR 2 @ GROUND FLOOR
A-09 SCALE 1:50 M A-09 SCALE 1:25 M

2 2
3.20M 3.20M
1.00 1.20 1.00 1.00 1.20 1.00

0.25
4.5MM HARDIFLEX
WALL PAINT FINISH
CEILING FIN

2 CEILING LINE 300X300 GLAZED CERAMIC


WALL TILES
CEILING LINE

3.50
3.20M W W
3 3

1.00 1.20 1.00


2.40

2.40
1.70
1.50 D D
W W 4 4

0.05
FFL FFL
3 3

C
SECTION "4" SECTION "5"
D
4 C C
2.43

T&B 2.43 2.43


D
4
T&B

4.5MM HARDIFLEX 4.5MM HARDIFLEX


CEILING FIN CEILING FIN
CEILING LINE CEILING LINE
SHOWER CURTAIN
PLAN WALL TILES
300X300 GLAZED CERAMIC

2.40

2.40
1.80
1.70

1.50
COMMON TOILET & BATH DETAILS
3 @ SECOND FLOOR
A-09 SCALE 1:50 M SECTION "6" SECTION "7"

PROJECT & LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:
DETENTION CELL TOILET DETAILS
REPUBLIC OF THE PHILIPPINES PWD TOILET DETAILS JUDY ANN F. ALCEDO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF TOILET AND BATH DETAILS
ENGINEERING ASSISTANT
(REG. ARCHITECT)
REGIONAL OFFICE IX POLICE STATION BUILDING PREPARED:
A-09
VETERANS AVENUE EXT., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
ENGINEER III DISTRICT ENGINEER
KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 09 27
(STANDARD PLAN) NELLY S. MUHSIN CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ARCHITECT III
DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019 DATE: NOVEMBER 2019
GENERAL CONSTRUCTION NOTES - I
NOTES ON CONCRETE HOLLOW BLOCK WALLS NOTES ON CONCRETE WALLS NOTES ON CONCRETE HOLLOW BLOCK WALLS
FLR. SLAB OR BEAM DOWEL BARS TO
1. UNLESS OTHERWISE SHOWN IN PLANS ALL CONCRETE HOLLOW BLOCKS AND CERAMIC BLOCKS MATCH VERT. BARS 1. ALL WALLS SHALL BE REINFORCED ACCORDING TO THE FOLLOWING SCHEDULE OF WALL 1. WHERE A CONSTRUCTION JOINT IS TO BE MADE, THE SURFACE OF CONCRETE SHALL BE
SHALL BE REINFORCED AS SHOWN IN THE SCHEDULE OF CONCRETE HOLLOW BLOCKS AND CERAMIC REINFORCEMENT UNLESS OTHERWISE INDICATED IN THE PLANS. CLEANED AND ALL LAITANCE AND STANDING WATER REMOVED. SHEAR KEY SHALL BE PROVIDED AT THE JOINT.

(DOWEL)
BLOCK REINFORCEMENT.

400
VERIFY ARCHITECTURAL
2. PROVIDE 150mm x 300mm STIFFENER COLUMN REIFORCED WITH 4-12mm WITH 10mmØ TIES AT 1. ALL JOINTS AND CELLS
WALL REINFORCEMENT VERTICAL MAIN REINFORCEMENTS TO BE
THICKNESS SECTION
150mm ON CENTER WHERE CONCRETE HOLLOW BLOCK TERMINATES AND AT EVERY 3.0M LENGTH CONTAINING REINFORCING HORIZONTAL VERTICAL REMARKS CONTINUOUS (TOP & BOTT. BARS)
OF CONCRETE HOLLOW BLOCK WALLS UNLESS NOTED IN STRUCTURAL PLANS. BARS SHALL BE FILLED 100mm Ø10mm @ 250mm O.C. Ø10mm @ 300mm O.C. HORIZONTAL BARS VERT.
WITH CONCRETE GROUT. 125mm Ø10mm @ 200mm O.C. Ø10mm @ 250mm O.C. AT CENTERS VERTICAL BARS WHERE JOINTS IS AT POINT OF MAIN REINFORCEMENTS
2. FOR REINFORCEMENTS SEE HORIZ. STRESS, PROVIDE SHEAR RODS TO BE CONTINUOUS
150mm Ø12mm @ 250mm O.C. Ø12mm @ 300mm O.C. BARS STAGGERED OUT WITH ENGINEERS APPROVAL
SCHEDULE OF CONCRETE HOLLOW BLOCK AND CERAMIC BLOCK REINFORCEMENT CONSTRUCTION NOTES. BARS
Ø10x1000 LONG
BLOCK 30 BAR DIA. 30 BAR DIA.
REINFORCING BARS SHALL HAVE 25mm CLEAR CONCRETE COVER FROM FACE OF WALL EXCEPT @ 300 O.C.

(DOWEL)
THICKNESS REINFORCEMENT NOTES 50
FOR WALLS IN CONTACT WITH THE GROUND WHERE A MINIMUM OF 60mm SHALL BE PROVIDED, (MIN.) (MIN.)

400
HORIZONTAL VERTICAL A. MINIMUM LAPS AT SPLICE = 0.25M 1-Ø16 CONT. HOR. BARS AND FOR EXPOSED FACES OF FORMED WALLS WHERE THE MINIMUM SHALL BE 50mm CLEAR. 40
B. PROVIdE RIGHT ANGLED REINFORCEMENT FOR FLOOR SLAB ONLY
75 mm 10mmØ @ 600mm O.C. 10mmØ @ 600mm O.C. 2. CARRY VERTICAL BARS AT LEAST 60mm ABOVE FLOOR LEVEL TO PROVIDE FOR SPLICES WHEN
AT CORNERS 0.92M LONG
NECESSARY STOP AT 50mm BELOW TOP SLAB OR SOLID BAND WHERE THE WALL ENDS VERTICAL
125 mm 10mmØ @ 600mm O.C. 10mmØ @ 600mm O.C. C. WHERE CHB OR CER. BLK. WALL DOWELS AND HORIZONTAL BARS SHALL BE SPLICED BY LAPPING A DISTANCE EQUAL TO 30 DIAMETERS
JOIN COL. R.C. BEAMS AND WALL DOWELS AND WIRED SECURELY WITH 16 G.I. WIRE PROVIDED THAT SPLICES IN ADJACENT BARS ARE
150 mm 10mmØ @ 600mm O.C. 10mmØ @ 600mm O.C. WITH THE SAME SIZE AS VERT. OR HOR.
TYP. SECTION OF MASONRY STAGGERED AT LEAST 1.50M.O.C. BEAM SLAB
REINFORCEMENTS SHALL BE PROVIDED
200 mm 12mmØ @ 600mm O.C. 12mmØ @ 600mm O.C. 3. UNLESS OTHERWISE NOTED IN THE PLANS, ALL OPENINGS IN WALLS 250mm OR THICKER SHALL
PARTITION REINFORCEMENTS BE REINFORCED AROUND WITH 2-20mmØ BARS FOR 225mm, 200mm, 175mm, 150mm, USE
2-16mmØ. FOR 125mm AND 100mm WALLS, USE 2-12mmØ BARS. ALL WALLS SPANNING
TYPICAL SLAB & BEAM
REINFORCING CONCRETE LINTEL BEAM IN SHALL HAVE VERTICAL REINFORCEMENT BENT TO A U-FORM LIKE STIRRUPS AND SPACED CONSTRUCTION JOINT DET.
ACCORDING TO THE SCHEDULE UNLESS OTHERWISE NOTED (SEE FIG.1)
CONCRETE BLOCK WALLS

LINTELS IN BLOCK WALLS SEE CONSTRUCTION NOTES


FOR MASONRY WALL REIN-
CLEAR TOTAL MIN. HEIGHT OF REINFORCEMENT FORCEMENTS (TYPICAL)
SPAN LENGTH fc' LINTEL FIN. FLR. LVL.

VARIES
("L") (L+0.40M) (MPa) (MM) BOTTOM TOP STIRRUPS

1.20M 1.60M 200 1-Ø10 1-Ø10 Ø6mm @ 200mm NAT. GRD. LVL.
150M 1.90M 14.0 200 1-Ø10 1-Ø10 Ø6mm @ 200mm DOWEL BARS TO MATCH
CHB VERTICAL BARS

600 (MIN.)
1.80M 2.20M 200 1-Ø12 1-Ø10 Ø6mm @ 200mm
4-Ø16 VERT. BARS
Ø10 BOTT. BARS
2.10M 2.50M 250 1-Ø12 1-Ø10 Ø6mm @ 200mm @ 300 O.C. 4-Ø16 VERT. BARS

250

550
2.40M 2.90M 17.0 250 1-Ø12 1-Ø10 Ø6mm @ 200mm DOOR
3-Ø10 BOTT. BARS OPENING

550
2.70M 3.10M 250 1-Ø16 1-Ø12 Ø10mm @ 200mm NOTE:
PROVIDE THESE ADDITIONAL BARS FOR
3.00 3.40M 300 1-Ø16 1-Ø12 Ø10mm @ 200mm 38mm
400 ALL OPENINGS PLUS BARS (NOT
3.30 3.70M 20.0 300 1-Ø16 1-Ø12 Ø10mm @ 200mm CLEAR WINDOW
3.60 4.00 300 1-Ø20 1-Ø12 Ø10mm @ 200mm SHOWN) PARALLEL TO SIDE OF OPENING
WF1 EQUAL TO THE NUMBER OF TERMINATED
OPENING
550 550 BARS AT OPENING
DOWEL TO MATCH
12 THK. EXPANSION JOINT CHB VERT. BARS SEE ARCHITECTURAL & MECHANICAL
WITH MASTIC FILLER 1-Ø16 VERT. BARS PLANS FOR SLAB OPENING LOCATION.
TYPICAL CONNECTION DETAIL
300
CHB WALL OF R.C. WALL AT CORNERS
(TYP.)
(DOWEL)

DOWEL
FOR SIZE AND SPACING

400
400

OF HOR. & VERT. BARS


1-Ø16 VERT. BARS
CHB WALL SEE CONSTRUCTION NOTES. FIN. FLR. LVL. TYP. EXTERIOR WINDOW & DOOR OPENING

250
FOR SIZE AND SPACING
OF HOR. & VERT. BARS
SEE CONSTRUCTION NOTES. 3-Ø10 BARS (AS SHOWN)
CORNER WALL OPENING OR END WALL Ø10 BOTT. BARS @ 300 O.C. NOTES OF STIRRUPS
400
NOTES ON WELDS 1. ALL REINFORCEMENT SHALL BE BENT COLD UNLESS OTHERWISE PERMITTED BY THE
1-Ø16 VERT. BARS R.C. COLUMN OR WALL
WF2 1. USE E70xx ELECTRODES FOR ALL MEMBERS WELDED. STRUCTURAL ENGINEER.
2. WELDS SHALL DEVELOP THE FULL STRENGTH OF MEMBERS JOINED UNLESS OTHERWISE 2. REINFORCEMENT PARCIALLY EMBEDED IN CONCRETE SHALL NOT BE FILLED BENT, EXCEPT
12 THK. EXPANSION JOINT DOWEL BARS TO MATCH
CHB HOR. BARS DOWEL TO MATCH SHOWN OR DETAILED IN THE DRAWINGS. AS SHOWN IN THE DESIGN DRAWINGS OR PERMITTED BY THE STRUCTURAL ENGINEER.
WITH MASTIC FILLER
CHB VERT. BARS
CHB WALL 12 THK. EXPANSION JOINT 3. TIES & CLOSE STIRRUPS MUST BE BENT AT 135°.
WHERE DEPRESSED
WITH MASTIC FILLER 300 SLAB OCCURS NOTES ON STRUCTURAL STEEL db
1. STRUCTURAL STEEL TO BE USED FOR FABRICATION AND ERECTION OF THIS STRUCTURE SHALL
(DOWEL)

DOWEL

(TYP.) L
400

COMPLY WITH ALL THE PERTINENT PROVISION OF AISC SPECIFICATION FOR THE DESIGN,

D db
400

D+2db
FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR BUILDING LATEST EDITION. 135° HOOKS

L
FOR SIZE AND SPACING
OF HOR. & VERT. BARS 2. ALL STRUCTURAL STEEL SHAPES SHALL BE ASTM A 36 STRUCTURAL STEEL UNLESS
4db or 65mm
250

SEE CONSTRUCTION NOTES. 400 OTHERWISE INDICATED.


(DOWEL)
3. ALL WELDED CONNECTIONS SHALL DEVELOP THE FULL STRENGTH OF THE MEMBERS CONNECTED. D
3-Ø10 BARS (AS SHOWN)

6d
INTERSECTION WALL INTERSECTING R.C. COL. OR WALL 180° END HOOKS

b
Ø10 BOTT. BARS @ 300 O.C. 4. ALL BOLTS USED UNLESS OTHERWISE SPECIFIED SHALL BE ASTM A 307 BOLTS.
400
TYPICAL CONNECTION DETAIL OF MASONRY WALL WF3 NOTES ON EMBEDED PIPES

db
A. ALL EMBEDED PIPES FOR UTILITIES, ETC. THAT PASS THRU BEAMS SHALL BE MAXIMUM 100mm

12db
TYPICAL CHB FOOTING DETAILS

L
200 200 OR D/3 WHICHEVER IS LESS DIAMETER SINGLE RIGID GALVANIZED IRON PIPE UNLESS OTHERWISE
(MIN) (MIN) D
( WHERE APPLICABLE ) OR APPROVED IN WRITING BY THE STRUCTURAL ENGINEER.
90° HOOKS
B. NO PIPES SHALL BE ALLOWED TO PASS THRU BEAMS VERTICALLY. L
Ø10 STIRRUPS FOR SIZE AND SPACING C. NO PIPES SHALL BE EMBEDED TO COLUMNS. 90° END HOOKS L1
@ 150 O.C. OF HOR. & VERT. BARS
SEE CONSTRUCTION NOTES
VERIFY DEPRESSION

30 BAR DIA. 30 BAR DIA.


(DOWEL)

CHB WALL DOWEL BARS TO MATCH (min.) (min.) MAIN BAR END HOOKS STIRRUP AND TIE HOOKS
400

(ALL GRADES) (ALL GRADES)


D=FOR BEAM
t=FOR SLAB

CHB VERT. BARS


BAR SIZE DIAMETER 180° HOOK 90° HOOK BAR SIZE DIAMETER 180° HOOK 90° HOOK
OPENING 1-Ø16 VERT. 2-Ø12 TOP BARS
(DEFORMED) (mm) (DEFORMED) (mm)
D+2db L L D+2db L L
200

BARS TYPICAL
2-Ø12 BOTT. BARS 10mm Ø 60 75 125 150 10mm Ø 40 125 85 100
12mm Ø 75 100 150 200 12mm Ø 50 165 115 115
D=FOR BEAM
FIN. FLR. LVL.
SECTION 2t=FOR SLAB
16mm Ø 95 125 175 250 16mm Ø 65 200 140 150

30 BAR DIA. 20mm Ø 115 150 200 300 20mm Ø 115 250 165 300
(min.) 25mm Ø 150 200 230 450 25mm Ø 150 365 230 405
ELEVATION 28mm Ø 240 300 350 550
TYPICAL DETAIL FOR BEAM
32mm Ø 300 335 450 600
TYP. DET. OF LINTEL BEAM AT CHB WALL OPENING OR SLAB CHANGE SOFFIT

PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

L I C WO
GENERAL CONSTRUCTION NOTE - 1
PROPOSED CONSTRUCTION OF
B R

REPUBLIC OF THE PHILIPPINES


U K
P

ABDUL GAFFAR B. LAO


S
F
O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STANDARD TYPE B/C MPS BUILDING ENGINEER I
N T

S-01
ME

H I

REGIONAL OFFICE IX
G
T
R

DESIGNED:
W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN) ENGINEER III DISTRICT ENGINEER
KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 10 27
JULMALI A. AHIYAL, JR. CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE:
ENGINEER II DATE: DATE: DATE: DATE:
GENERAL CONSTRUCTION NOTES - II
GENERAL NOTES NOTES ON REINFORCEMENT NOTES ON COLUMNS NOTES ON BEAMS AND GIRDERS
1. UNLESS OTHERWISE NOTED IN PLANS, THE YIELD STRENGTH OF REINFORCING BARS SHALL BE: 1. UNLESS , OTHERWISE NOTED IN PLANS, CAMBER ALL BEAMS AND GIDER AT LEAST 6mm.S
1. IN THE INTERPRETATION OF THE DRAWING, INDICATED DIMENSIONS SHALL GOVERN AND 1. PROVIDE EXTRA SETS OF TIES AT 100mm O.C. FOR TIED COLUMN REINFORCEMENT
FOR EVERY 4.50M OF SPAN , EXCEPT CANTILEVERS FOR WHICH THE CAMBER SHALL BE
DISTANCES OF SIZES SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES. A. FOOTINGS, FOOTING BEAMS AND GIRDERS ------ fy = 414 MPa ( 60,000 psi ) ABOVE AND BELOW BEAM-COLUMN CONNECTIONS FOR A DISTANCE FROM FACE
AS NOTED IN PLANS OR AS ORDERED BY THE ENGINEER BUT IN NO CASE LESS THAN
B. COLUMNS AND SHEAR WALLS -------------- fy = 414 MPa ( 60,000 psi ) OF CONNECTION EQUAL TO THE GREATER OF THE OVERALL THICKNESS OF COLUMN,
2. IN REFERENCE TO OTHER DRAWINGS, SEE ARCHITECTURAL DRAWINGS FOR DEPRESSIONS 20mm FOR EVERY 3.0M OF FREE SPAN.
1/6 THE CLEAR HEIGHT OF COLUMN OR 450mm.
IN FLOOR SLABS, OPENINGS IN THE WALLS AND SLABS, INTERIOR PARTIONS, LOCATION C. BEAMS AND GIRDER ------------------- fy = 414 MPa ( 60,000 psi ) 2. TYPICAL BARS BENDING AND CUTTING DETAILS FOR BEAMS SHALL BE AS
OF DRAINS ETC. 2. COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF CONCRETE CAST SHOWN IN FIG. B-1.
D. NON-LOAD BEARING WALL PARTITIONS, BEDDED SLABS, FLOOR & ROOF SLABS,
MONOLITHICALLY WITH THE CORE WITH THE MINIMUM THICKNESS OF 40mm AND NOT
3. IN CASE OF DISCREPANCIES AS TO THE LAYOUT, DIMENSIONS, AND ELEVATIONS BETWEEN PARAPETS, CATCH BASIN, SIDE WALK. --------- fy = 275MPa ( 40,000 psi )
LESS THAN 40 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE IN MILLIMETERS.
THE STRUCTURAL PLANS, AND ARCHITECTURAL DRAWINGS, THE CONTRACTOR SHALL NOTIFY 2. ALL REINFORCING BARS SIZE 10mm OR BIGGER SHALL BE DEFORMED IN ACCORDANCE WITH
3. WHERE COLUMNS CHANGE IN SIZE , VERTICAL REINFORCEMENTS SHALL SHALL BE OFFSET 20 BAR DIA.
BOTH THE STRUCTURAL ENGINEERS AND THE ARCHITECT. ASTM A 706. BARS SMALLER THAN 10mm MAY BE PLAIN.
AT A SLOPE OF NOT MORE THAN 1 IN 6 AND EXTRA 10mm TIES AT 100mm SHALL LAPPED SPLICE
4. ALL CONCRETE WORKS SHALL BE DONE IN ACCORDANCE WITH THE ACI.318 95 BUILDING 3. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN ACCORDANCE ON COMPRESSION
BE PROVIDED THRU OUT THE OFFSET REGION.
CODE REQUIREMENTS FOR REINFORCED CONCRETE AND ALL STRUCTURAL STEEL WORK W/ TABLE A & TABLE B (TABLE OF LAP SPLICE & ANCHORAGE LENGTH) UNLESS OTHERWISE BARS THREE-FOURTH
ACCORDING WITH ASCI SPECIFICATION (9th EDITION) IN SO FAR AS THEY DO NOT CONFLICT SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED WHENEVER POSSIBLE. 4. UNLESS OTHERWISE INDICATED IN THE PLANS, LAP SPLICES FOR COLUMN REINFORCE- L1 L2 L1 THE ENBEDMENT
MENT SHALL BE MADE WITHIN THE CENTER HALF OF COLUMN HEIGHT, AND THE SPLICE LENGTHS IN
WITH THE LOCAL BUILDING CODE REQUIREMENT. L1/4 L1/4 L1/4 L1/4 L1/4 L1/4
SEE TABLE "A" TABLE 'A'
LENGTH SHALL NOT BE LESS THAN 40 BAR DIAMETERS. WELDING OR APPROVED
5. ACI REFERS TO AMERICAN CONCRETE INSTITUTE, ASCI TO AMERICAN INSTITUTE OF STEEL FOR LENGTH OF
MECHANICAL DEVICES MAY BE USED PROVIDED THAT NOT MORE THAN ALTERNATE BARS EMBEDMENT
CONSTRUCTION AND ASTM TO AMERICAN SOCIETY FOR TESTING MATERIALS.
ARE WELDED OR MECHANICALLY SPLICED AT ANY LEVEL AND THE VERTICAL DISTANCES
6. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE BETWEEN THESE WELDS OR SPLICES OF ADJACENT BARS IS NOT LESS THAN 600mm.
SHOWN OR NOTED MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS. NOTES ON CONCRETE SLABS
7. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEELS,
1. ALL SLAB REINFORCEMENTS SHALL BE 20mm CLEAR MINIMUM FROM BOTTOM AND FROM H SEE TABLE "A" 15 MIN. (WHENE COUNTED
MISCELLANEOUS IRON, PRE-CAST CONCRETE ETC. SHALL BE SUBMITTED FOR ENGINEERS SEE TABLE "A"
THE TOP OF SLAB. FOR LENGTH OF FOR COMPRESSION 15 MIN
APPROVAL BEFORE FABRICATION. FOR LENGTH OF
EMBEDMENT EXTEND 20 DIA.
2. UNLESS OTHERWISE DETAILED IN CONTINUOUS SLAB HAVING SAME REINFORCEMENT RUNNING CROSS-TIE LAPPED SPLICE
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS, BEYONG OPPOSITE FACE
IN ONE DIRECTION, REINFORCING BARS SHALL BE BENT UP, OR CUT AS FOLLOWS SUPPORT
EQUIPMENT'S AND MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL,

350mm. MAX.
ELECTRICAL, AND MECHANICAL DRAWINGS.
EXTERIOR COLUMN INTERIOR COLUMN INTERIOR COLUMN EXTERIOR COLUMN

10
9. ALL RESULTS OF MATERIAL TESTING FOR CONCRETE, REINFORCING BARS, & STRUCTURAL SUPPORT SUPPORT SUPPORT SUPPORT
L1

d
L2

H
m
STEEL MUST BE NOTED & APPROVED BY THE STRUCTURAL DESIGNER.

in
FIG. B-1

.
L1/4 L1/4 L2/4
TOP BAR TOP BAR

NOTES ON CONCRETE MIXES & PLACING

CONF. REINF.
TABLE 'A' TABLE 'B'
JOINT HOOP SPACE @ "2Sh" WHEN TENSION BARS COMPRESSION BARS
1. ALL CONCRETE SHALL DEVELOP A MIN. COMPRESSIVE STRENGTH AT THE END OF TWENTY THERE ARE BEAMS HAVING WIDTH OF EMBEDMENT LENGTHS AND EMBEDMENT LENGTHS AND
EIGHT (28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMPS AS FOLLOWS.

JOINT REINF. D
BOTTOM BAR BOTTOM BAR AT LEAST ONE-HALF THE COLUMN LAPPED SPLICED IN MILLIMETERS LAPPED SPLICED IN MILLIMETERS
L1/6 L1/5 L2/5
WIDTH & DEPTHS NOT LESS THAN
LOCATION 28 DAYS STRENGTH MAX. SIZE OF MAX. SLUMP BAR SIZE fc'= 20.7MPa(3000psi) fc'= 27.6MPa(4000psi) BAR SIZE fc'= 20.7MPa(3000psi) fc'= 27.6MPa(4000psi)
THREE QUARTERS OF THE DEEPEST (DEFORMED) (DEFORMED)
AGGREGATE EMBEDMENT LAPPED EMBEDMENT LAPPED EMBEDMENT LAPPED EMBEDMENT LAPPED
BEAM THAT FRAME INTO FOUR
SIDES OF THE COLUMN. ALL OTHER 10mm Ø 300 300 300 300 10mm Ø 225 300 200 300

CONF. REINF.PER SCHED. CONF. REINF.


COLUMNS 4000 PSI (27.6 MPa) 19mm 100mm TYPICAL BAR BENDING AND CUTTING DETAILS FOR SLABS CONDITIONS USE HOOPS @ "Sh" CENTERS. 12mm Ø 300 300 300 300 12mm Ø 275 300 250 300
BEAMS & SUSPENDED SLAB4000 PSI (27.6 MPa) 19mm 100mm
3. IF SLABS ARE REINFORCED BOTHWAYS BARS ALONG THE SHORTER SPAN SHALL BE PLACED 16mm Ø 300 400 300 400 16mm Ø 350 400 325 400

Sh
SLAB ON GRADE 3000 PSI (21 MPa) 19mm 100mm BELOW THOSE ALONG THE LONG SPAN AT THE CENTER AND OVER THE LONGER SPAN
20mm Ø 400 550 350 500 20mm Ø 450 500 475 500
FOR REINFOCING BARS NEAR THE SUPPORTS. THE SPACING OF THE BARS AT THE COLUMN
STRIPS SHALL BE APPOXIMATELY ONE AND A HALF (1 1/2) SLAB THICKNESS 25mm Ø 600 800 550 750 25mm Ø 550 625 550 625

COLUMN TIES AS
OTHERS NOT INDICATED 4000 PSI (27.6 MPa) 19mm 100mm
OR 45 CENTIMETERS 28mm Ø 750 1000 650 850 28mm Ø 625 675 625 675
FOR COL. BAR SPLICES SEE TABLE
2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS. 4. TEMPERATURE BARS FOR SLAB SHALL BE GENERALLY PLACED NEAR THE FACE IN TENSION OF MIN. LAP SPLICE LENGTH OF 32mm Ø 950 1300 850 1100 32mm Ø 700 775 700 775
SUSPENDED SLABS -------------------------------------- 20mm AND SHALL NOT BE LESS THAN 0.0025 BT. (SEE SCHEDULE BELOW) COLUMN REINFORCEMENT
SLAB ON GRADE ---------------------------------------- 40mm NOTE : TOP PLAIN BARS , MULTIPLY VALUE BY 2 NOTE : TOP PLAIN BARS , MULTIPLY VALUE BY 2
(SPACING OF TIES ALONG THIS REGION VALUES GIVEN ABOVE CAN ALSO BE USED
WALLS ABOVE GRADE ------------------------------------- 25mm SHALL NOT BE LESS THAN 100mm) FOR COLUMNS.
BEAM STIRRUPS AND COLUMN TIES ---------------------------- 40mm SCHEDULE OF MINIMUM SLAB REINFORCEMENT
WHERE CONCRETE IS EXPOSED TO

Sh
THICKNESS MINIMUM TEMPERATURE BARS 3. IF THE BEAM REINFORCING BARS END IN A WALL THE CLEAR DISTANCE FROM THE BAR TO

D
EARTH BUT POURED AGAINST FORMS --------------------------- 50mm
THE FARTHER FACE OF THE WALL NOT BE LESS THAN 25mm. EMBEDMENT LENGTH SHALL
WHERE CONCRETE IS DEPOSITED 100 mm 10 mm Ø @ 300mm EACH WAY NOTE:

D JOINT REINF.
BE AS SHOWN IN A TABLE 'A' FOR TENSION BARS AND TABLE 'B' FOR COMPRESSION BARS
DIRECTLY AGAINST EARTH ---------------------------------- 75mm
125 mm 10 mm Ø @ 250mm EACH WAY ALL CONCRETE REINF. DETAIL SHOULD UNLESS SPECIFIED IN PLAN S. TOP BAR SHALL NOT BE SPLICED WITHIN THE COLUMN OR
3. CONCTRETE SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT SEGREGATION. RE-HAND BE DONE IN ACCORDANCE WITH ACI WITHIN A DISTANCE TWICE THE MEMBER DEPTH FROM THE FACE OF THE COLUMN. AT LEAST

CONF. REINF.
150 mm 10 mm Ø @ 200mm EACH WAY DETAILING MANUAL LATEST EDITION TWO STIRRUPS SHALL BE PROVIDED AT ALL SPLICES.
LING OR FLOWING PLACING SHALL BE DONE PREFERABLY WITH BUGGIES, BUCKETS OR
WHEELBARROWS, NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE FROM 175 mm 10 mm Ø @ 175mm EACH WAY 4. IF THERE ARE TWO OR MORE LAYERS OF REINFORCING BARS, USE 25mmØ BAR SEPARATORS
HOPPERS TO BUGGIES, WHEELBARROWS OR BUCKETS IN WHICH CASE THEY SHALL NOT SPACED AT 1.0M ON CENTER. IN NO CASE SHALL THERE BE LESS THAN TWO (2) SEPARATORS
200 mm 10 mm Ø @ 150mm EACH WAY BETWEEN TWO LAYERS OF BARS.
EXCEED SIX (6) METERS IN AGGREGATE LENGTH.
4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS 5. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS OR STEEL SHAPES SHALL BE AS
UNLESS AUTORIZED IN WRITING BY THE DESIGNERS AND ONLY FOR UNUSUAL CONDITIONS SHOWN IN FIG. B-2 UNLESS SPECIFIED ELSEWHERE.
5. UNLESS OTHERWISE NOTED IN THE PLANS ALL BEDDED SLABS SHALL BE REINFORCED
WHERE VIBRATIONS IS EXTREMELY DIFFICULT TO ACCOMPLISH. TYPICAL COLUMN ELEV. SHOWING
WITH 10mm Ø AT 250mm O.C EACH WAY TO CENTER OF SLAB AND CONSTRUCTION
5. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY POSITIONED & JOINTS FOR SAME SHALL NOT BE LESS THAN 3.65 METER APART DOWELS AND TIES SPACING
SECURED IN PLACE PRIOR TO PLACING OF CONCRETE.
6. PROVIDE EXTRA REINFORCEMENTS FOR CORNER SLAB (TWO ADJACENT DISCONTINUOUS
6. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN CONSECUTIVE DAYS EDGES) AS SHOWN BELOW.
IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP FOG SPRAYING, CURING
7. CONCRETE SLAB REINFORCEMENTS SHALL BE PROPERLY SUPPORTED WITH 10mmØ STEEL MAIN REINFORCEMENT

t
COMPOUNDS OR OTHER APPROVED METHODS. CHAIR OR APPROVED EQUIVALENT SPACED AT 1.0 METER ON CENTER BOTHWAYS
7. STRIPPING OF FORMS AND SHORES: LAP SPLICE LENGTH:
WEB BARS
AT ANY LEVEL NO MORE THAN

t OR 1/4 D
FOUNDATION -----------------------------------------

ht
24 HRS. SEE NOTE
ALTERNATE BARS SHOULD BE

t
SUSPENDED SLAB EXCEPT WHEN SEE NOTE SLEEVES FOR UTILITY
ADDITIONAL LOADS ARE IMPOSED ----------------------------- 14 DAYS Ø12x1000 LONG AT SPLICED. MIN. DISTANCE BET. PIPES MAX. 1/5 D

D
WALLS --------------------------------------------- 21 DAYS MID-DEPTH OF SLAB TWO ADJACENT BARS SPLICES

WITHIN CENTER
DOWN INTO EDGE BEAM. EXTENDED

HALF OF "H"
BEAMS --------------------------------------------- 14 DAYS AT EACH CORNER SHALL BE 600mm.
4-Ø 12@ 1800 LONG TOP BARS BEND 0.025M Ø
COLUMNS -------------------------------------------- 21 DAYS 1-Ø12 TOP & SEPARATOR PROVIDE 3-Ø10 EXTRA STIRR.
BARS MIN. OF 1,200 (4'-0") INTO BARS. L/4 SEE NOTE
BOTT. BARS EACH SIDE OF SLEEVES
8. THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF POURING AND THE LOCATION OF THE 4-Ø12 BOTT. BARS TOP BARS @ SUPPORT (CONT.)
CONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER AT LEAST (4) DAYS PRIOR TO THE TYP. DET. FOR SLEEVES
400

2 BARS REQ'D. BOTT. BARS @ SUPPORT NOTE 1


POURING FOR APPROVAL.
THRU CONCRETE BEAM
JT. REINF.

9. THE CONTRACTOR SHALL FURNISH AND MAINTAIN ADEQUATE FORMS SHORINGS UNTIL THE 20 mm CLEAR FOR JOIST
CONCRETE MEMBERS HAVE ATTAINED THEIR WORKING CONDITION AND STRENGTH. 40 mm CLEAR FOR BEAMS
38mm
0

D
SLAB
60

CLEAR AND GIRDERS


OPENING
0
NOTES OF FOOTINGS 60 FIG. B-2 FIG. B-3
2 BARS
400

1. FOOTINGS ARE DESIGNED FOR AN ALLOWABLE SOIL BEARING PRESSURE OF BOTTOM BARS
20 SPLICE
AT MID SPAN
100KPa ( 2000 psf). CONTRACTOR SHALL REPORT TO THE ENGINEER, IN WRITING, SOIL SECTION "A"
CONDITIONS, UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL BEFORE EXTRA TOP BARS 6. WHEN A BEAM CROSSES A GIRDER, REST BEAM ON TOP OF GIRDER BARS, BEAM REINF-
IN TWO WAY SLAB EXTEND
BARS UP TO BEAM SUPPORT @ SUPPORT FORCING BAR SHALL BE SYMMETRICAL ABOUT CENTER LINE WHENEVER POSSIBLE.
DEPOSITING CONCRETE.
OMIT TRIMMER BARS WHERE 7. GENERALLY NO SPLICES SHALL BE PERMITTED AT POINTS WHERE CRITICAL BENDING STRESSES
2. FOOTING SHALL REST AT LEAST 2100mm BELOW NATURAL GRADE LINE UNLESS OTHERWISE
60

OPENING IS FRAMED BY BEAM TYP. DETAIL OF COL. LAP SPLICE OCCUR, SPLICES WHERE SO PERMITTED SHALL BE INDICATED IN THE TABLE 'A' AND 'B'.
0

INDICATED IN PLANS. NO FOOTING SHALL REST ON FILL.


WELDED SPLICES SHALL DEVELOP IN TENSION AT LEAST 125 % OF THE SPECIFIED YIELD
3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENTS SHALL BE 75mm CLEAR & EXT. GIRDER TO COL. CONNECT. STRENGTH OF THE BAR. NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION IS
FOR CONCRETE DEPOSITED THE GROUND AND 50mm FOR CONCRETE TYPICAL CORNER SLAB DETAIL TYPICAL SLAB ALLOWED TO BE SPLICED THEREIN.
DEPOSITED AGAINST A FORMWORK. OPENING DET.

PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

L I C WO
GENERAL CONSTRUCTION NOTE - 2
PROPOSED CONSTRUCTION OF
B R

REPUBLIC OF THE PHILIPPINES


U K
P

ABDUL GAFFAR B. LAO


S
F
O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STANDARD TYPE B/C MPS BUILDING ENGINEER I
N T

S-02
ME

H I

REGIONAL OFFICE IX
G
T
R

DESIGNED:
W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN) ENGINEER III DISTRICT ENGINEER
KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 11 27
JULMALI A. AHIYAL, JR. CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE:
ENGINEER II DATE: DATE: DATE: DATE:
1 2 3 4
COLUMN SCHEDULE
12.00

4.00 4.00 4.00


NGL
STIFFENER COLUMN

C2-F3 C2-F3
WF 1

WF 2
Y-BAR
FTB-1 FTB-1 FTB-1
A
X-BAR

D
C1-F1 C1-F1 C1-F2 C1-F2 SEE FTB DETAIL 50mm THK.
WF 2 WF 2
4.00

FTB-1 WF 2 FTB-1 FTB-1 3 - SETS, 10mmØ LATERAL LEAN CONCRETE


FTB-1 WF 2 TIES
WF 2 SPACED @ 2-50mm,
7-75mm, REST - 150mm O.C.
WF 2
FTB-1 FTB-1
8.00

T
B
WF 2
WF 2 WF 2

C1-F1 C1-F1 C1-F1 C1-F1


4.00

FTB-1 WF 2 FTB-1 FTB-1 WF 2 FTB-1

50mm THK.
LEAN CONCRETE
B
FTB-1 FTB-1 FTB-1
C
3 - SETS, 10mmØ LATERAL
C1-F1 C1-F1 C1-F1 C1-F1
TIES
SPACED @ 2-50mm,
7-75mm, REST - 150mm O.C.

100mm THK. CONCRETE GROUND FLOOR SLAB:


10mmØ TEMPERATURE BARS SPACED @ 400mm
O.C. BOTH WAYS

L COLUMN

2 - SETS, 10mmØ LATERAL 3 - SETS, 10mmØ LATERAL


TIES TIES
1 FOUNDATION PLAN SPACED @ 2-50mm,
7-75mm, REST - 150mm O.C.
SPACED @ 2-50mm,
7-75mm, REST - 150mm O.C.
S-3 SCALE 1:100 M

DESIGN PARAMETERS: 100MM THK (4") CHB WALL


REINFORCED W/ 10MMØ VERT.

1. FOOTING DESIGN IS BASED ON 100 KPa GROSS SOIL


BARS SPACED @ 400MM O.C. AND
10MMØ HOR. BARS SPACED PLAN FOOTING
@ EVERY 3 LAYERS OF CHB
BEARING CAPACITY
3 - 10MMØ LONG'L BOTTOM BARS
2. NO WORK SHALL BE CONTINUED IF THE ACTUAL SOIL WITH 10MMØ TRANS. BARS F.F.L
SPACED @ 300MM O.C.
600 250

BEARING CAPACITY IS LOWER THAN THE SBC


300 400 N.G.L.
CONSIDERED UNTIL THE APPROVAL OF THE DESIGNER
250 350

850

3. UNIT WEIGHT OF SOIL CONSIDERED IS 18 KN/m3

TYP. ISOLATED FOOTING DETAIL


400
100

4. FOOTING CONCRETE COVER IS 75 mm


2
S-3 SCALE NTS
2 - SETS, 10mmØ LATERAL 3 - SETS, 10mmØ LATERAL
400 TIES TIES
SPACED @ 2-50mm, SPACED @ 2-50mm,
P L A N S E C T I O N 7-75mm, REST - 150mm O.C. 7-75mm, REST - 150mm O.C.

WF SCHEDULE OF FOOTING

SCHEDULE OF TIE BEAMS


17-20mmØ 17-20mmØ

16-20mmØ 16-20mmØ


6-20mmØ 6-20mmØ

*16mmØ or Bigger- USE GRADE 60 (414 MPa)


*12mmØ or Smaller- USE GRADE 40 (275 MPa)

PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

L I C WO
FOUNDATION PLAN
PROPOSED CONSTRUCTION OF
B R

REPUBLIC OF THE PHILIPPINES


U K
P

ABDUL GAFFAR B. LAO


S

WALL FOOTING
F
O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STANDARD TYPE B/C MPS BUILDING ENGINEER I
N T

S-03
ME

H I

REGIONAL OFFICE IX SCHEDULE OF TIE BEAMS


G
T
R

DESIGNED:
W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
COLUMN SCHEDULE KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 12 27
ENGINEER III DISTRICT ENGINEER
(STANDARD PLAN)
TYP. ISOLATED FOOTING DETAIL JULMALI A. AHIYAL, JR. CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

SCHEDULE OF FOOTING DATE:


ENGINEER II DATE: DATE: DATE: DATE:
1 2 3 4 1 2 3 4 1 2 3 4

12.00 12.00 1.20 12.00 1.20

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00

B2
LINE OF ROOF
B2 B2

1.20
A B1 B1 B1 A B1 B1 B1 A B4 B4 B4
2.93

2.93
B2 STAIR WELL B1 B2 STAIR WELL B1
4.00

4.00
B1 S1 B2 S1 B1 S1 B2 S1

B3 B3
1.07

1.07
S1 S1
B2 B2 B2 B2
8.00

8.00

8.00
B B2
B B2
B5
COVERED ROOF DECK
B5
4.00

4.00
B1 S1 B2 S1 B2 S1 B1 B1 S1 B2 S1 B2 S1 B1 RB2

B1 B1 B1 B1 B1 B1 B4 B4 B4
C C C

1.20
2.15

B4 S1 B4
LINE OF ROOF
B4

1 BEAM PLAN (SECOND FLOOR) 2 BEAM PLAN (ROOF DECK) 3 BEAM PLAN (ABOVE ROOF DECK)
S-4 SCALE 1:100MTRS S-4 SCALE 1:100MTRS S-4 SCALE 1:100MTRS

SCHEDULE OF TIE BEAMS


150
150 150 150

2-12∅
2-12∅

350
300
200

200
12∅ 2-12∅ 2-16∅ 2-16∅
℄ 10∅ STIRR 1@50; 10∅ STIRR 1@50;
REST @ 300 REST @ 300

MAX SPAN MAX SPAN MAX SPAN MAX SPAN


1.20M 2.50M 3.50M 4.00M

ABOVE DOOR / WINDOW OPENINGS ON CHB WALL


(EXTEND 0.30M. FROM EDGES OF MASONRY OPENINGS)

4 LINTEL BEAM SCHEDULE


S-5 NOT TO SCALE

PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

L I C WO
BEAM PLAN (SECOND FLOOR)
PROPOSED CONSTRUCTION OF
B R

REPUBLIC OF THE PHILIPPINES


U K
P

ABDUL GAFFAR B. LAO


S

BEAM PLAN (ROOF DECK)


F
O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STANDARD TYPE B/C MPS BUILDING ENGINEER I
N T

S-04
ME

H I

REGIONAL OFFICE IX BEAM PLAN (ABOVE ROOF DECK)


G
T
R

DESIGNED:
W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
SCHEDULE OF BEAMS KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 13 27
ENGINEER III DISTRICT ENGINEER
(STANDARD PLAN)
LINTEL BEAM SCHEDULE JULMALI A. AHIYAL, JR. CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE:
ENGINEER II DATE: DATE: DATE: DATE:
1 2 3 4

1.20 12.00 1.20 2 3


4.00 4.00 4.00
4 EQUAL SPACES

4.00 1.20 2.00


1.00 1.00 1.00 1.00
LINE OF ROOF 1.00 1.00
1.20

0.785
A RB3 RB3 RB3
HT-3 HT-3 2-L50.8X50.8X4.8
12mmØ STEEL SAGRODS @ 2-L50.8X50.8X4.8
HT-2 HT-2
THIRD POINT (STAGGERED)

0.17
HT-3 HT-3
2-L50.8X50.8X6.4
1.05

LC 175X50X20X2mm THK. STEEL LIGHT GAUGE


ST-1 HT-3

TRUSS-1

TRUSS-1

TRUSS-1
CHANNEL PURLINS @ 650mm O.C. WITH 2-L50.8X50.8X6.4
8.00

HT-1 ST1 ST1 HT-1


RB4 RB4
1L-50X50X6MM THK. CLIP ANGLE
7.875

7.88
0.525 1.14 1.14 2.275 1.14 1.14 0.525
HT-3 HT-3
HT-5 HT-5

HT-2 HT-2

2.80

1.00
HT-3 HT-3 B2
RB3 RB3 RB3
C B2
HT-6
B2
1.20

HT-4
LINE OF ROOF 2-L50.8X50.8X6.4 2-L50.8X50.8X4.8
NOTE:
ROOF FRAMING PLAN AT 1ST FLOOR 3.96 HT-4 2.80
(EXTENSION AT THE REAR SIDE) 0.96 1.00 1.00 1.00 1.00 1.00 0.80

1.00

1.00
2-L50.8X50.8X4.8

1 ROOF FRAMING PLAN 2-L50.8X50.8X6.4 2-L50.8X50.8X6.4


HT-6
S-5 SCALE 1:50MTRS HT-5
2 SCHEMATIC TRUSS DIAGRAM
S-5 SCALE 1:50MTRS
1.20 8.00 1.20

4 EQUAL SPACES 4 EQUAL SPACES 150 150


1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

RAMP LEVEL

100
2-12Ø 2-12Ø

300
10Ø @ 250 10Ø @ 250
1.50

1.50

VARIES
2-12Ø 2-12Ø

100 THK
0.17

0.17

GRAVEL BED
150 THK. CHB WALL
2-L50.8X50.8X6.4 2-L50.8X50.8X4.8 W/ 10Ø @ 600
SLAB ON GRADE EACH WAY
1.05 1.05
TRUSS-1
1.70 5.66

1.20 4.00

750
0.87 1.00 1.00 1.00 1.00 1.00 3-10Ø
1.00 1.00 1.00 1.00

200

200
1.50

1.50

10Ø @ 300
2-L50.8X50.8X4.8

400 400
0.17

0.17

2-L50.8X50.8X6.4
1.05

HT-1
2-L50.8X50.8X6.4 2-L50.8X50.8X4.8
3 RAMP DETAIL
1.49 S-5 SCALE 1:50MTRS
HT-2
PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

L I C WO
ROOF FRAMING PLAN
PROPOSED CONSTRUCTION OF
B R

REPUBLIC OF THE PHILIPPINES


U K
P

ABDUL GAFFAR B. LAO


S

SCHEMATIC TRUSS DIAGRAM


F
O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STANDARD TYPE B/C MPS BUILDING ENGINEER I
N T

S-05
ME

H I

REGIONAL OFFICE IX RAMP DETAILS


G
T
R

DESIGNED:
W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN) ENGINEER III DISTRICT ENGINEER
KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 14 27
JULMALI A. AHIYAL, JR. CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE:
ENGINEER II DATE: DATE: DATE: DATE:
3 4 3 4 3 4
ROOFING LVL 4.00 4.00 4.00

DEPTH
BEAM
10mmØ TIES, SPACING 8-50,10-100, REST 180

0.50
SLAB ON GRADE
10Ø @ 250

Ah3
W
3 canopy ln. canopy ln. 10Ø
C C C

PLANTBOX

STAIR WIDTH

STAIR WIDTH
17 16 15 14 13 12 11 10
D
COMMON ARMORY
17 16 15 14 13 12 11 10
8.2 DN
DN
T&B

STAIR WIDTH
2.70

2.88

2.88
W W 9
4 SET OF EXTRA TIES 6
9
6 T=125

Bh3

4.00

4.00
D

1.45
AT BEAM COLUMN 8.2 3 UP

360
INTERSECTION 1 2 3 4 5 6 7
2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
10Ø

canopy ln.
1

canopy ln.
STEP DWN
12Ø @ 250

B B 2.10

Ah3
ROOF DECK LVL 0.30 0.30 STEPS WIDTH

0.50
0.30 1.60 4-12Ø 12Ø @ 250
TREAD TREAD

DEPTH
BEAM
2.35 1.65 2.40 TREAD STAIR
.225

0.50
STAIR STEPS STEPS WIDTH LANDING
10mmØ TIES, SPACING 8-50,10-100, REST 180

1.60

Ah2
STAIR ROOFDECK FLOOR PLAN STAIR ON GRADE
GROUND FLOOR PLAN LANDING
NOT TO SCALE
SECOND FLOOR PLAN
MAIN STAIR (PORCH) ENTRY
3.50

4 SET OF EXTRA TIES 3

Bh2
AT BEAM COLUMN S6 SCALE 1 : 15 M
INTERSECTION 4.03
0 0.50 1

0.80 4.00
Ah2

GLASS B2- SEE


0.60

0.90
2ND FLOOR LVL BLOCKS STRUC. DET.
0.50

DEPTH

0.30
BEAM

17

HT. OF HANDRAIL
0.30
16
0.50

15

0.205
2"Ø STAINLESS

0.90M
14

13
HANDRAIL
Ah1
10mmØ TIES, SPACING 8-50,10-100, REST 180

12
17 STEP @ .205 = 3.50

11

10 SQUARE BAR GRILLS


PAINTED FIN.
3.50

8 FLR. FIN.
7

6 FLOOR TILE
3.50

5 FIN.
4

0. 205 M
3
GLASS
0.60
0.90

RISER
BLOCKS CONCRETE STAIR

2.68
2
4 SET OF EXTRA TIES
SEE STRUC. DET.
Bh1

1
AT BEAM COLUMN
7.00

INTERSECTION
17
0.30 0.05
16

15
0.30 M
14
TREAD 2" NON-SLIP
16 MM Ø BOTT. 13
BRASS NOZING
BARS @ 8" OC 12
17 STEP @ .205 = 3.50

11

GROUND FLOOR LVL 10

0.05
16 MM Ø BOTT.
3.50

9
12 MM Ø STEP BARS BARS @ 8" OC
8
0.60

12 MM Ø EDGE BARS 7
10 MM Ø TEMP. BARS
Ah1

2.46
NATURAL GRADE LINE 16 MM Ø TOP. BARS @ 8" OC
5
6
SP. 10" OC, PLACED
STAGGERED 0.30 M 0.05
4 16 MM Ø BOTT.
TREAD
0.50

0.90

16 MM Ø TOP
TYPICAL HANDRAIL DETAIL

0.1
3 BARS @ 8" OC
BARS @ 8" OC

±0.205 M
100mm O.C. TYP

2 100 MM THK.

25
10mmØ TIES

RISER
1
CONCRETE PAVEMENT
SCALE 1 : 20 M
1.50

100 MM THK. GRAVEL BASE FIN. FLOOR LINE


0.50

0.10
14-16MMØ DRSB VERT.
0 0.5
0.10
NGL
BARS W/ 10MMØ TIES
0.25
SP. @3-.05MM. 4-.10MTR, REST @
VERIFY

.15MTR ON CENTER 1-10MMØ NOZING BAR W/


10MMØ TIES @ 300 MM.O.C.
13-16MMØ DRSB BEDBARS
SP. AS SHOWN BOTHWAYS 1.50 12MMØ @ 100 MM. O.C.
BOTT. BARS (TYP.)
GRAVEL BASE
0.70
0.25

0.20
10MMØ @ 300 MM. O.C.
0.70 TEMP. BARS (TYP.)
FOOTING AND COLUMN STAIR DETAIL 13-16MMØ DRSB
2
1 ELEVATION DETAILS S6 SCALE 1:50M FOOTING PLAN STEPS DETAIL
S-7 SCALE 1:50MTRS
SCALE 1:10M
0

PROJECT & LOCATION: SHEET CONTENT: CAD ENCODED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

L I C WO FOOTING AND COLUMN ELEVATION PLAN


PROPOSED CONSTRUCTION OF
B R

REPUBLIC OF THE PHILIPPINES


U K
P

ABDUL GAFFAR B. LAO


S

STAIR DETAIL
F
O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STANDARD TYPE B/C MPS BUILDING ENGINEER I
N T

S-06
ME

H I

REGIONAL OFFICE IX STEPS DETAIL


G
T
R

DESIGNED:
W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
TYPICAL HANDRAIL DETAIL KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 15 27
ENGINEER III DISTRICT ENGINEER
(STANDARD PLAN)
MAIN STAIR (PORCH) ENTRY JULMALI A. AHIYAL, JR. CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

STAIR PLANS DATE:


ENGINEER II DATE: DATE: DATE: DATE:
1 2 3 4 1 2

RD RD

TAP TO
500L STAINLESS STEEL GV M NEAREST
WATER TANK CV GV WATER
GV GV SHO SOURCE
1 HP TRANSFER PUMP FV WC
40 mm Ø PP-R F
GV LAV 40 mm Ø PP-R GV RD
RD

A CWL RISER 40 mm Ø PP-R CWL 40 mm Ø PP-R CWL


CWL RISER A
GV F 20 15
32 mm Ø PP-R CWL LAV
dn
JAN.
WC SHO

LANDING
32 mm Ø PP-R CWL
40 mm Ø PP-R CWL
REST
ROOM WC 13 40 mm Ø PP-R
F SHO
32 mm Ø PP-R CWL WC 32 mm Ø PP-R CWL LAV CWL RISER TO 2F & GF
up up
32 mm Ø PP-R CWL 40 mm Ø PP-R
GV 1 5 1 5

EVIDENCE A CWL RISER CV


GV FV
PRESSURE TANK
B F
B WITH 21 HP BOOSTER PUMP
32 mm Ø PP-R CWL

LOCKER
WC
32 mm Ø PP-R CWL GV 500L STAINLESS STEEL
WATER TANK

C
RD RD

slope

slope

slope

slope
PORCH
4

RAMP
1 UP
up

GROUND FLOOR WATER DIST. LAYOUT SECOND FLOOR WATER DIST. LAYOUT THIRD FLOOR WATER DIST. LAYOUT
SCALE 1:100 M SCALE 1:100 M
SCALE 1:100 M

4 A 2
RD

3 RD B 1
RD ING
O
P TEST 2 15
ND
13
LA C FD
TAARE R 20
NEATRCE dn CK
WU L O O DE
SO W SH SH 5 CE
OF
GV C AV up IDE
N
CV RO
M

PP
-R 1 L 1
EV FD
F RE
D
Ø WC VE
-R CO
HO mm GV WC
S
32 PP
LA
V
Ø ISER
WC mm R FD
40CWL
R
V E
LA CK
RD
LO
LF N.
e p
CW JA slo
GV P-R -R
pe
slo
GV P
PP L
FV
0m
m
Ø
5 Ø ISER CW WL L RD
pe
slo A
4
up 1 m -
m R P R CW R C pe
slo

CWL 40CWLØ P PP- P-R


F
m
Ø
PP
-R
mm m Ø Ø P
32 2 m mm
THIRD FLOOR ISO. WATER DIST. LAYOUT
0m SCALE 1:100 M
4 3 2
-R GV 4 3
20mm x 21" Ø PP-R
WC
PP MP
Ø ISER
40 RAUP FEMALE THREADED
mm H ELBOW REDUCER
Ø GV RC
mm R PP PO
40CWL L CW
-R WC 3

20mm Ø PP-R CWL


GV up
CW L L 4
- R R CW 1
P P
Ø PP
-
CW
LL
2
SECOND FLOOR ISOMETRIC WATER DIST. LAYOUT
A m mm Ø
- R CW SCALE 1:100 M
3232 m PP -R
Ø PP
m mm Ø
B 3232 m 1 32mm Ø PP-R CWL
40 mm Ø PP-R CWL
32 x 20 mm Ø PP-R
GROUND FLOOR ISOMETRIC WATER DIST. LAYOUT ELBOW REDUCER

SCALE 1:100 M WATER CONNECTION DETAIL


SCALE NTS

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

L I C WO GROUND FLOOR WATER DIST. LAYOUT


PROPOSED CONSTRUCTION OF
B R

REPUBLIC OF THE PHILIPPINES


U K
P
S
F

SECOND FLOOR WATER DIST. LAYOUT


O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STANDARD TYPE B/C MPS BUILDING
N T

P-01
ME

H I

REGIONAL OFFICE IX THIRD FLOOR WATER DIST. LAYOUT


G
T
R

W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY AR-RAFI A. SALUAN PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN)
GROUND FLOOR ISOMETRIC WATER DIST. LAYOUT
ENGINEERING ASSISTANT ENGINEER III DISTRICT ENGINEER
KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 17 28
SECOND & THIRD FLOOR ISOMETRIC WATER DIST. LAYOUT CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

WATER CONNECTION DETAIL DATE: OCTOBER 2019 DATE: DATE: DATE: DATE:
1500
150mm THK. R.C. SLAB 4000
w/ 12mm Ø CONT. BARS 1700 900 900 1200
SPACED AT 150mm O.C.
BOTH WAYS
150mm THK. CHB WALL
w/ 12mmØ REBARS HOR.
BARS @ EVERY 3-LAYER MANHOLE
& VERT. BARS @ 0.80m C.O.
600
C.O.

150
1500

1200

1200
600
100mmØ PVC.
MANHOLE MANHOLE MANHOLE OUTLET

C.O. C.O. 100mmØ PVC. OUTLET


150mm THK. CHB WALL

1600
100mmØ PVC. INLET

2000
w/ 12mmØ REBARS HOR.
BARS @ EVERY 3-LAYER
& VERT. BARS @ 0.80m

150mm THK. R.C. SLAB


PLAN 100mm THK. CHB WALL w/ 12mmØ CONT. BARS
150mm Ø PVC OUTLET w/ 12mm Ø REBARS HOR. SP. @ 300mm O.C. B.W.
AND CLEAN OUT BARS @ EVERY 3-LAYER

250
& VERT. BARS @ 0.80m
150mm THK. R.C. SLAB
0.60m x 0.60m w/ 12mm Ø CONT. BARS
MANHOLE SPACED AT 150mm O.C.
C.O. C.O. BOTH WAYS
400 400
SECTION B-B
150

300

AIR SPACE
100mmØ PVC. INLET 100mmØ PVC. OUTLET LAVATORY
FAUCET
150mm THK. CHB WALL
w/ 12mmØ REBARS HOR.
BARS @ EVERY 3-LAYER
& VERT. BARS @ 0.80m
50mm Ø
1600

VENT PIPE
LEACHING LEACHING
2000

DIGESTIVE 150mm THK. R.C. SLAB


20mm Ø x 21 " PP-R
(2% SLOPED TO MIDDLE) ANGLE VALVE
CHAMBER CHAMBER CHAMBER w/ 12mm Ø CONTINUOUS BARS FEMALE THREADED ELBOW
SP. @ 300mm O.C. B.W. 20mm Ø PP-R

REFER TO ARCH. DRAWING


P-TRAP
COLD WATERLINE
P-TRAP
3-12mmØ CONTINOUS BARS CLEAN OUT
w/ 10mm Ø TIES
SPACED AT 300mm O.C.
SAND SAND FIN. FLOOR LINE
250

50mm Ø SP
400
400 400 400
LAVATORY MOUNTING DETAIL WATER SUPPLY DISTRIBUTION SYSTEM
SCALE NTS
SECTION A-A SEPTIC TANK DETAILS CWL COLD WATERLINE
SCALE 1:20 M
GV GATE VALVE
CV CHECK VALVE
F / SHO FAUCET & SHOWER
RISER
50mm Ø WASTEWATER & STORM WATER COLLECTION SYSTEM
VENT PIPE
PRESSURE PRESSURE SP SOIL PIPE
SWITCH TANK VP VENT PIPE
TO FIXTURES 20mm Ø x 21 " PP-R VP AC VENT PIPE ABOVE CEILING
FEMALE ELBOW
VTR VENT THRU ROOF
20mm Ø COLD
WATER LINE PIPE VSAC VENT STACK ABOVE CL.
MOTOR CO
BYPASS LINE CLEAN OUT
PUMP FLOOR FLANGE
TO FIXTURES FD FLOOR DRAIN
BYPASS LINE
TO FIXTURES SS SOIL STACK
WATER
SOURCE 50mm Ø VENT PIPE WC WATER CLOSET
2000L TRANSFER ELEVATED WATER TANK URI URINAL
STAINLESS STEEL PUMP
LAV LAVATORY
CISTERN TANK
DP DRAIN PIPE
SCHEMATIC DIAGRAM OF WATER DISTRIBUTION DS
RD
DOWNSPOUT
ROOF DRAIN
SCALE NTS
WATER CLOSET MOUNTING DETAIL CB CB CATCH BASIN
SCALE NTS
GT GT GREASE TRAP

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

L I C WO
SEPTIC TANK DETAILS
PROPOSED CONSTRUCTION OF
B R

REPUBLIC OF THE PHILIPPINES


U K
P
S

LAVATORY MOUNTING DETAIL


F
O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STANDARD TYPE B/C MPS BUILDING
N T

P-02
ME

H I

REGIONAL OFFICE IX WATER CLOSET MOUNTING DETAIL


G
T
R

W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY AR-RAFI A. SALUAN PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
GENERAL NOTES KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 17 27
ENGINEERING ASSISTANT ENGINEER III DISTRICT ENGINEER
(STANDARD PLAN)
LEGEND & SYMBOLS CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

SCHEMATIC DIAGRAM OF WATER DISTRIBUTION DATE: OCTOBER 2019 DATE: DATE: DATE: DATE:
PRE-PAINTED (LONG SPAN)
1 2 3 4 1 2 3 4 RIBBED TYPE G.I. ROOFING
SHT. (WHITE COLOR)

LINE OF ROOF 100 mm Ø PVC SP

VTW
CO 75 mm Ø PVC SP
CO 1
WC
100 mm Ø PVC SP
2 FD
3 75 mm Ø PVC SP 50 mm Ø PVC VP AC

1.50

VTW
T&B
100 mm Ø PVC SP 75 mm Ø PVC SP
LAV 50 mm Ø PVC VP AC
A CO
CO
FD
ARMORY 50 mm Ø PVC SP
100 mm Ø PVC SS
WC FD
CO 20 15
A
VTW
JAN. 75 mm Ø PVC SP FD LAV
FEMALE T&B
50 mm Ø PVC VP AC DETENTION 50 mm Ø PVC VP AC
CELL 13
75 mm Ø PVC SP FD 100 mm Ø PVC SP LAV FD FD
WC
100 mm Ø PVC SP WC up 50 mm Ø PVC SP CO
1 5 100 mm Ø PVC SP CO 1 5

MALE 50 mm Ø PVC VP AC EVIDENCE


DETENTION
CELL
B 75 mm Ø PVC SP FD
RADIO
RM B
VTW ADMIN/LOG/
50 mm Ø PVC VPAC WC FIN/PCR
100 mm Ø PVC SP CO

INTEL/ LOBBY CONFERENCE


INVESTIGATION ROOM QUARTERS OPNS
EVIDENCE

WCCD/GAD
(w/ juvenile area)

C C

slope

slope

slope

slope
PORCH
4

RAMP
1 UP
up

GROUND FLOOR SANITARY LAYOUT SECOND FLOOR SANITARY LAYOUT


SCALE 1:100 M
SCALE 1:100 M

C
V P AP
4 C S 4 A
PV VC SP P
Ø Ø P VC C S P
VT
m
m m Ø P PV C S SP
3
W
50 00 mmm m Ø PV VC 3 B
1 5 Ø P
OF
7 00 mmm Ø
RO 1 5 mm
F 7
L INE
O
50 VT
2 CO Y
2 W
C
OR
WC M
AR
FD V 15
13
1 12
LA
FDAN.
J 1 20
DIO
W 3 G/ 5 RA RM
VT CO LO CO NCE
N/ CR 1 IDE
MIIN/P AV EV
5
W
D VT L
A F a) FD O
up 1 AD re
/G e a WCC
FD FD NS
CO CDenil OP
W WC / juv WC T&B FD
VT (w V
LA
Y CO RS
0 BB TE
1.5 LO AR
FDWC
SS CO QU
C AC MP
ACP
e p
RAUP
PV VP C SP
slo
pe
H
VPC S SS P CE slo
E
RC
Ø VC V
mmØ P Ø P
FDWC
L/ AT
TE G
I ON
NC
IDE
EV PO 4 C V C S
PV P V C AC
RE
FE OM
N pe
slo 4
P IN STI Ø m Ø Ø P PV VPC SPSP P ON RO pe
0
10 mm mm C S SP up C slo
VE 4

50 100 PVPVC CO IN
mm5 m mm Ø VC PV C S
50 7100 5 mmØ Pm ØØ PVPVC
1
ØØ
mm m
P
C S SP
3 7 mm m m Ø 3
A 7500 m PVPVC 0
50 10 50 m
m
1 ØØ 0m
mmmm 10
7 5 2 2
B 100
1 1
C
ISOMETRIC GROUND FLOOR SANITARY LAYOUT ISOMETRIC SECOND FLOOR SANITARY LAYOUT
SCALE 1:100 M SCALE 1:100 M

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

L I C WO
GROUND FLOOR SANITARY LAYOUT
PROPOSED CONSTRUCTION OF
B R

REPUBLIC OF THE PHILIPPINES


U K
P
S

SECOND FLOOR SANITARY LAYOUT


F
O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STANDARD TYPE B/C MPS BUILDING
N T

P-03
ME

H I

REGIONAL OFFICE IX ISOMETRIC GROUND FLOOR SANITARY LAYOUT


G
T
R

W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY ISOMETRIC SECOND FLOOR SANITARY LAYOUT AR-RAFI A. SALUAN PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN) ENGINEERING ASSISTANT ENGINEER III DISTRICT ENGINEER
KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 18 27
CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: OCTOBER 2019 DATE: DATE: DATE: DATE:


1 2 3 4 1 2 3 4 1 2 3 4

RD RD
150 mm Ø PVC DP

150 mm Ø PVC DP
CB CB
up DS DS
1
75 mm Ø PVC DS 2 75 mm Ø PVC DS 75 mm Ø PVC DS RD RD RD LINE OF ROOF RD
3
CB CB
DS RD
DS DS DS DS RD DS DS FD
CB FD
A A DS
20 15
DS A RD
13
RD
150 mm Ø PVC DP

D
JAN.

150 mm Ø PVC DP
dn 8.2 dn

LANDING

LANDING
13 10

up up
75 mm Ø PVC DS 1 5
75 mm Ø PVC DS 1 5
75 mm Ø PVC DS 5
HALLWAY EVIDENCE

DS DS DS DS
B CB CB B B FD
FD

LOCKER
ADMIN/LOG/ COVERED ROOF DECK
FIN/PCR
150 mm Ø PVC DP

150 mm Ø PVC DP
LOBBY
STEEL PLATE
75 mm Ø PVC DS 75 mm Ø PVC DS 75 mm Ø PVC DS MANHOLE
EVIDENCE

WCCD/GAD
(w/ juvenile area)

DS DS
C CB DS DS
DS DS
CB C DS DS DS DS
C RD FD
FD FD
FD RD
RD RD
CB
150 mm Ø PVC DP

slope

slope

slope

slope
RD LINE OF ROOF RD RD RD
4
TAP TO NEAREST TAP TO NEAREST
DRAINAGE LINE DRAINAGE LINE
RAMP
1 UP
up

GROUND FLOOR STORM DRAINAGE PLAN SECOND FLOOR STORM DRAINAGE PLAN THIRD FLOOR STORM DRAINAGE PLAN
SCALE 1:100 M SCALE 1:100 M SCALE 1:100 M

RD RD

MILD STEEL GRATING COVER


75 mm Ø PVC DS
75 mm Ø PVC DS

RD RD M-452 "METMA" BRAND


0.60
OR 75mm THK. CONC.
0.075 0.45 0.075 COVER W/ 10Ø REINF. BARS 0.60
75 mm Ø PVC DS

75 mm Ø PVC DS

RD RD & 10Ø HANDLE COVER 0.12 0.12


0.36
75 mm Ø PVC DS

75 mm Ø PVC DS

RD RD
RD

RD RD
75 mm Ø PVC DS

4" Ø PVC PIPE


75 mm Ø PVC DS
75 mm Ø PVC DS

75 mm Ø PVC DS

RD

0.12
OF
RO
RD
TO DOWNSPOUT INLET
RD
S
75 mm Ø PVC DS

RD
75 mm Ø PVC DS

0.45

0.60
100mm THK CHB
RD RD DP w/ 10mmØ HOR
75 mm Ø PVC DS
75 mm Ø PVC DS

C RD
PV 15
0m
Ø
75 mm Ø PVC DS

mm m & VER BARS @ 200mm OC

VARIES
0 Ø
15 PV
CD
2 P
15 6" Ø PVC PIPE
0
RD mm T
Ø
PV
ES E
ARLIN
( OUTLET ) 2 %
CD NEGE
1 P O A
P T IN PLAN DOWNSPOUT INLET min. SLOPE
RD TADRA

3-10Ø BOTTOM

0.15
15 MP
RAUP
BARS BOTHWAYS
0m
m
Ø
PV
A CD
P
CD
P
15 DP
SECTION
0m PV C

B
Ø
m
0m
m
Ø
PV
15 0m
m
T
ES E
ARLIN
Ø
PV
ISOMETRIC STORM DRAINAGE PLAN CATCH BASIN DETAILS
CD
P 15 NEGE SCALE 1:100 M SCALE 1:10 M
O A
P TAIN
TADR

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

L I C WO GROUND FLOOR STORM DRAINAGE PLAN


PROPOSED CONSTRUCTION OF
B R

REPUBLIC OF THE PHILIPPINES


U K
P
S
F

SECOND FLOOR STORM DRAINAGE PLAN


O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STANDARD TYPE B/C MPS BUILDING
N T

P-04
ME

H I

REGIONAL OFFICE IX THIRD FLOOR STORM DRAINAGE PLAN


G
T
R

W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY AR-RAFI A. SALUAN PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN)
ISOMETRIC STORM DRAINAGE PLAN
ENGINEERING ASSISTANT ENGINEER III DISTRICT ENGINEER
KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 19 27
CATCH BASIN DETAILS CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: OCTOBER 2019 DATE: DATE: DATE: DATE:


1 2 3 4 1 2 3 4 1 2 3 4

up
1
2
3 T&B

A ARMORY A 20 15
TO ROOF A 13
FEMALE
FX JAN. sho.
dn DECK dn
T&B

LANDING

LANDING
DETENTION REST
CELL 63 mm Ø GI ROOM T&B 13 63 mm Ø GI 10 63 mm Ø GI
STANDPIPE sho. STANDPIPE STANDPIPE
up up
FIRE DEP'T CONNECTION FIRE DEP'T
1 5 1 5 5
FHC FHC CONNECTION
MALE
(SIAMESE TWIN) HALLWAY EVIDENCE (SIAMESE TWIN)
DETENTION FX COP/DEP. COP
CELL
B B FX
FX RADIO
RM B COVERED ROOF DECK

LOCKER
ADMIN/LOG/
FIN/PCR

INTEL/ LOBBY CONFERENCE FX FX


INVESTIGATION FX ROOM STEEL PLATE
QUARTERS OPNS MANHOLE
EVIDENCE

WCCD/GAD
(w/ juvenile area)

C FX C C

slope

slope

slope

slope
LINE OF ROOF
4
TAP TO NEAREST
DRAINAGE LINE
RAMP
1 UP
up

GROUND FLOOR FIRE PROTECTION LAYOUT SECOND FLOOR FIRE PROTECTION LAYOUT THIRD FLOOR FIRE PROTECTION LAYOUT
SCALE 1:100 M SCALE 1:100 M SCALE 1:100 M

80 cm.

0.2 40mm Ø
2-63mm Ø HOSE 0.80 0 ANGLE
GATE VALVE
VALE W/ CAP AND 1-5.0 KGS
FIRE EXTINGUISHER
CHAIN

LOCK
WALL
BRACKET
(TYP.

84. cm.
0.84

0.80
WALL

5.0KGS. MULTI-
63mm Ø FIRE PURPOSE FIRE
HOSE VALVE EXTINGUISHER
40mm Ø X 30m
LONG SIGLE FIRE EXTINGUISHER
JACKET FIRE HOSE
PERSPECTIVE
FIRE HOSE CABINET SIAMESE TWIN
2 1/2 Ø DRY STANDPIPE
FIRE DEP'T. CONNECTION DETAILS FHC FIRE HOSE CABINET
SCALE NTS
FIRE HOSE CABINET DETAILS FIRE EXTINGUISHER
SCALE NTS FX

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

L I C WO
GROUND FLOOR FIRE PROTECTION LAYOUT
PROPOSED CONSTRUCTION OF
B R

REPUBLIC OF THE PHILIPPINES


U K
P
S

SECOND FLOOR FIRE PROTECTION LAYOUT


F
O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STANDARD TYPE B/C MPS BUILDING
N T

P-05
ME

H I

REGIONAL OFFICE IX THIRD FLOOR FIRE PROTECTION LAYOUT


G
T
R

W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY FIRE DEP'T CONNECTION DETAILS AR-RAFI A. SALUAN PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA
(STANDARD PLAN) ENGINEERING ASSISTANT ENGINEER III DISTRICT ENGINEER
KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV 20 27
FIRE HOSE CABINET DETAILS CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

NOTES & LEGEND DATE: OCTOBER 2019 DATE: DATE: DATE: DATE:
1 2 3 4
1 2 3 4
12.00

4.00 4.00 4.00 12.00

1.20 2.80 4.00 4.00 4.00

1.20 2.80 0.92 3.08

1.40 2.25

.50 .50

.50 .50

LINE OF ROOF

k LINE OF ROOF
l

h
T&B EF

j g
p GFCI
Sjkl T&B
.50

A FEMALE Sab

.50
Sf ARMORY
DETENTION
CELL f A FEMALE ARMORY
DETENTION
2.43

JAN.
CELL JAN.
h g a o

2.43
i
1.10
4.00

g
EF

1.10
4.00
5 Sop
b Si
5
1.57

MALE f ADMIN/LOG/
PP-1 FIN/PCR MALE

1.57
DETENTION
B
8.00

CELL C-1 e DETENTION PP-1 ADMIN/LOG/


PP-1 CELL FIN/PCR
Se
B
1.00

8.00
1.13

e e C-4
Smn
Sgh
Sef

℄ OF LADDER RUNG PP-1

1.00
EF

1.13
m n
LOBBY ℄ OF LADDER RUNG C-6
4.00

c c PP-1
Scd
3.00

4.00
2.87

C-2 INTEL/

(w/ juvenile
area)
WCCD/GAD
Sabc LOBBY
EVIDENCE

d c Sd PP-1 INVESTIGATION

3.00
2.87

EVIDENCE
l
INTEL/ a a Sl C-5 WCCD/GAD
INVESTIGATION C-3 PP-1 (w/ juvenile
C PP-1 area)
.50

.50
d d
PORCH

PORCH
RAMP
UP
RAMP
up UP
up

1 2 3 4
1 2 3 4

GROUND FLOOR LIGHTING LAYOUT SECOND FLOOR POWER LAYOUT


SCALE 1:100 MTS SCALE 1:100 MTS

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:

B
L I C WO
R
GROUND FLOOR LIGHTING LAYOUT
REPUBLIC OF THE PHILIPPINES
U K
P
S
F

GROUND FLOOR POWER LAYOUT


O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF POLICE STATION


N T

E-1
ME

H I

REGIONAL OFFICE IX
G
T

BUILDING
R

W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY JOCELYN T. BRUCES PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) ENGINEER II ENGINEER III DISTRICT ENGINEER 21 27
REGISTERED ELECTRICAL ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: NOVEMBER 2018 DATE: DATE: DATE: DATE:


1 2 3 4 1 2 3 4
12.00 12.00

4.00 4.00 4.00 4.00 4.00 4.00

3.00 1.00 2.20 1.80 3.00 1.00 2.20 1.80

RD RD RD RD

4.00
RD
4.00

A REST
ROOM l T&B 20 15
A 20 15
EF sho. sho.
n c dn dn

LANDING
Skl T&B

LANDING
HALLWAY
2.43

2.43
j d REST
Smn 13 ROOM T&B 13
X k
sho. m X sho.

HALLWAY
4.00

4.00
T&B up LOCKER
Sj EF up
Se b 1 5 1 5
Sd C-5
COP/DEP. e C-1 C-4
1.57

PP-2

1.57
COP PP-2 Sabc EVIDENCE RADIO PP-2 EVIDENCE
Shi
RM C-6
PP-2 PP-2 PP-2
B a
u C-2
So
o
B COP/DEP.
COP RADIO
LOCKER

h i p PP-2 RM
Spqr
Sstu
CONFERENCE
ROOM
4.00

4.00
Sgf OPNS CONFERENCE
ROOM OPNS
2.70

2.70
QUARTERS
10mm
THK.
CONCRETE g f q r s
QUARTERS t
LEDGE
C C
RD RD
2.15

2.15
slope

slope

slope

slope

slope

slope

slope

slope
1 2 3 4 1 2 3 4

SECOND FLOOR LIGHTING LAYOUT SECOND FLOOR POWER LAYOUT


SCALE 1:100 MTS SCALE 1:100 MTS

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:

B
L I C WO
R
SECOND FLOOR LIGHTING LAYOUT
REPUBLIC OF THE PHILIPPINES
U K
P
S
F

SECOND FLOOR POWER LAYOUT


O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF POLICE STATION


N T

E-2
ME

H I

REGIONAL OFFICE IX
G
T

BUILDING
R

W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY JOCELYN T. BRUCES PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) ENGINEER II ENGINEER III DISTRICT ENGINEER 22 27
REGISTERED ELECTRICAL ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: NOVEMBER 2018 DATE: DATE: DATE: DATE:


1 2 3 4 1 2 3 4
12.00
12.00
4.00 4.00 4.00
4.00 4.00 4.00
.45 2.60 .70
.45 2.60 .70

LINE OF ROOF
LINE OF ROOF

FD FD
A S2ab
A
FD
wp 13
C-6 dn
S2ab PP-2
Scd Riser Down 10
Sef
C-3
Riser Down

LANDING
Sgh b a
Sij PP-2
Skl
f e d c 5

wp
8.00

COVERED wp

8.00
ROOF
DECK

l k j i h g

C FD
C FD wp wp
FD

LINE OF ROOF
LINE
OF
ROOF

.70

1 2 3 4 1 2 3 4

ROOF DECK LIGHTING LAYOUT ROOF DECK POWER LAYOUT


SCALE 1:100 MTS SCALE 1:100 MTS

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:

B
L I C WO
R
ROOF DECK LIGHTING LAYOUT
REPUBLIC OF THE PHILIPPINES
U K
P
S
F

ROOF DECK POWER LAYOUT


O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF POLICE STATION


N T

E-3
ME

H I

REGIONAL OFFICE IX
G
T

BUILDING
R

W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY JOCELYN T. BRUCES PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) ENGINEER II ENGINEER III DISTRICT ENGINEER 23 27
REGISTERED ELECTRICAL ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: NOVEMBER 2018 DATE: DATE: DATE: DATE:


1 2 3 4
1 2 3 4
12.00

4.00 4.00 4.00 12.00

1.20 2.80 0.92 3.08 4.00 4.00 4.00

1.40 2.25 3.00 1.00 2.20 1.80

.50 .50

LINE OF ROOF
RD RD

T&B
.50

RD
A ARMORY
4.00

FEMALE
JAN. A ACU
C-5 20 15
sho.
2.43

DETENTION PP-4 dn
T&B

LANDING
CELL

2.43
REST
1.10
4.00

ROOM T&B 13
X sho.

4.00
5 LOCKER
up
MALE ACU 1 5
1.57

DETENTION PP-3 ADMIN/LOG/ C-4 ACU


C-2

1.57
CELL PP-4 HALLWAY EVIDENCE
FIN/PCR
B PP-3
8.00

ACU COP/DEP. C-4


COP PP-4 FACP

B Riser Down
PP-3

LOCKER
RADIO
INTEL/ RM
INVESTIGATION
4.00

C-1 LOBBY

4.00
PP-3
CONFERENCE
EVIDENCE

ACU
WCCD/GAD ROOM OPNS

2.70
C-3 QUARTERS
(w/ juvenile
area) PP-3
C-3 Riser Down C-2 C-1

C ACU PP-4 PP-4 PP-4


.50

C ACU ACU ACU

RD

2.15
PORCH

RAMP
UP

slope

slope

slope

slope
up

.70

.70 4.00 4.00

1 2 3 4
1 2 3 4

GROUND FLOOR AIRCONDITIONING LAYOUT SECOND FLOOR AIRCONDITIONING LAYOUT


SCALE 1:100 MTS SCALE 1:100 MTS

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:

B
L I C WO
R
GROUND FLOOR AIRCONDITIONING
REPUBLIC OF THE PHILIPPINES
U K
P

LAYOUT
S
F
O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF POLICE STATION


N T

E-4
ME

H I

REGIONAL OFFICE IX
G
T

BUILDING SECOND FLOOR AIRCONDITIONING


R

W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY LAYOUT JOCELYN T. BRUCES PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) ENGINEER II ENGINEER III DISTRICT ENGINEER 24 27
REGISTERED ELECTRICAL ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: NOVEMBER 2018 DATE: DATE: DATE: DATE:


1 2 3 4
1 2 3 4
12.00
12.00
4.00 4.00 4.00
4.00 4.00 4.00 3.00 1.00 2.20 1.80
1.20 2.80 0.92 3.08

1.40 2.25

.50 .50

RD RD
LINE OF ROOF

T&B ARMORY RD
4.00

A
.50

A FEMALE
T&B
sho.
20
dn
15

LANDING
SD

DETENTION

HALLWAY
SD

JAN.

2.43
CELL REST
ROOM 13
2.43

T&B
X sho.

4.00
SD

LOCKER
up
1.10
4.00

1 5
SD
5

1.57
EVIDENCE
MALE
1.57

SD

F
DETENTION
SD

CELL
ADMIN/LOG/
FIN/PCR B COP/DEP. RADIO
B
8.00

COP RM
1.00
1.13

F
℄ OF LADDER RUNG
CONFERENCE

4.00
ROOM
4.00

INTEL/ LOBBY OPNS

2.70
SD
QUARTERS
INVESTIGATION
3.00
2.87

SD
EVIDENCE

SD SD SD

WCCD/GAD SD

(w/ juvenile
area)
C
C RD
.50

2.15
PORCH

slope

slope

slope

slope
RAMP
UP
up

.70

.70 4.00 4.00

1 2 3 4
1 2 3 4

GROUND FLOOR AUXILIARY LAYOUT SECOND FLOOR AUXILIARY LAYOUT


SCALE 1:100 MTS SCALE 1:100 MTS

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:

B
L I C WO
R
GROUND FLOOR AUXILIARY LAYOUT
REPUBLIC OF THE PHILIPPINES
U K
P
S
F

SECOND FLOOR AUXILIARY LAYOUT


O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF POLICE STATION


N T

E-5
ME

H I

REGIONAL OFFICE IX
G
T

BUILDING
R

W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY JOCELYN T. BRUCES PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) ENGINEER II ENGINEER III DISTRICT ENGINEER 25 27
REGISTERED ELECTRICAL ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: NOVEMBER 2018 DATE: DATE: DATE: DATE:


GENERAL NOTES: SPECIFICATIONS: LOAD SCHEDULE DESIGN COMPUTATION
PANELBOARD NO. (PP-1) LOCATION : GROUND FLOOR PANELBOARD NO. MAIN DISTRIBUTION PANEL ( MDP ) LOCATION : ELECTRICAL ROOM

VOLTS VOLT-AMPERE AMPERE BREAKER RATING VOLTS VOLT-AMPERE AMPERE BREAKER RATING

ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN ACCORDANCE 1. ALL WORKS SHALL BE DONE UNDER THE DIRECT CKT. NO DESCRIPTION
(V) (VA) (A)
SIZE OF WIRE SIZE OF CONDUIT CKT. NO DESCRIPTION
(V) (VA) (A) AT AF POLE
SIZE OF WIRE SIZE OF CONDUIT
AT AF POLE KAIC TYPE
SUPERVISION OF LICENSE DULY PROFESSIONAL
WITH THE NATIONAL BUILDING CODE, PROVISIONS OF THE ELECTRICAL ENGINEER OR REGISTERED ELECTRICAL 8 - 23 watts CELINO LED SURFACE MOUNTED LIGHTING
2 - 30 mm ² THHN (SERVICE WIRE)
FIXTURES 2 - 3.5 mm ² THHN (SERVICE WIRE) 1 PP-1 ( GROUND FLOOR) 230 18525.56 81.57 100 100 2
LATEST APPROVED PHILIPPINE ELECTRICAL CODE, THE LAWS AND 1 230 904.44 3.93 15 50 2 10 PLUG-IN 1 - 3.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC 1 - 14 mm ² TW (FOR GROUNDING) 32 mm Ø RPVC OR RSC
ENGINEER. 5 - EMERGENCY LIGHT
2 - EXHAUST FAN
ORDINANCES OF THE LOCAL CODE ENFORCING AUTHORITIES AND 2. POWER SUPPLY TO THE BUILDING SHALL BE 230V,
REQUIREMENTS OF THE LOCAL ELECTRIC, TELEPHONE COMPANY SINGLE PHASE, 3-WIRES, 60HZ. 5 - 23 watts CELINO LED SURFACE MOUNTED LIGHTING 2 - 3.5 mm ² THHN (SERVICE WIRE) 2 - 38 mm ² THHN (SERVICE WIRE)
3. ALL MATERIALS TO BE USED SHALL BE NEW AND 2 FIXTURES 230 627.78 2.73 15 50 2 10 PLUG-IN 1 - 3.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC 2 PP-3 ( GROUND FLOOR) 230 19560.00 85.04 125 250 2
1 - 22 mm ² TW (FOR GROUNDING)
32 mm Ø RPVC OR RSC
AND BUILDING ADMINISTRATION REQUIREMENTS. APPROVED TYPE FOR PURPOSE & LOCATION.
5 - EMERGENCY LIGHT

4. NORMAL AND EMERGENCY CIRCUIT SHALL NOT BE 1 - 23 watts CELINO LED SURFACE MOUNTED LIGHTING
FIXTURES
1. CONTRACTOR SHALL SECURE ALL ELECTRICAL PERMIT COMBINED IN ONE RACEWAY OR CONDUIT. 3 13 - LUX SPACE GEN III, 12 WATTS LED DOWNLIGHTS 230 598.89 2.60 15 50 2 10
2 - 3.5 mm ² THHN (SERVICE WIRE)
PLUG-IN 1 - 3.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC
3 SPARE 230 1500.00 6.52

AND ALL FEES REQUIRED FOR THE WORKS AND 5. RECEPTACLES FOR GENERAL USE SHALL BE DUPLEX 20A, 3 - EMERGENCY LIGHT
1 - EXHAUST FAN
250VAC, GROUND TYPE.
FURNISH THE OWNER THE CERTIFICATE OF FINAL 6. ALL WIRES SHOULD HAVE A MAXIMUM LOAD OF 80% OF 2 - 3.5 mm ² THHN (SERVICE WIRE) 4 SPARE 230 1500.00 6.52
ELECTRICAL INSPECTION, WIRE AMPACITY. 4 4 - DUPLEX CONVENIENCE OUTLET 230 1440.00 6.26 20 50 2 10 PLUG-IN 1 - 3.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC

2. CONTRACTOR SHALL CONDUCT EARTH GROUND TEST, 7. LIGHT SWITCHES MINIMUM RATING SHALL BE 16A
WIRE INSULATION AND LOAD TEST UPON COMPLETION 230VAC. 2 - 3.5 mm ² THHN (SERVICE WIRE)
TOTAL 41085.56 179.65

8. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND 5 6 - DUPLEX CONVENIENCE OUTLET 230 2160.00 9.39 20 50 2 10 PLUG-IN 1 - 3.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC Iw (Ampacity of Wire)= (Total current, It x Demand factor,df) + 25% of Largest motor
OF WORKS, SHALL HAVE THE "P.S." MARKS. MAIN FEEDER SIZE: @ 80% D.F. Icb (Main Over Current Protection Device)= Iw + (1.5 x Largest motor)
3 - DUPLEX CONVENIENCE OUTLET
3. INCASE OF DISCREPANCY BETWEEN PLANS AND SITE 9. MOUNTING HEIGHTS SHALL BE AS FOLLOWS: 6 1 - DUPLEX CONVENIENCE OUTLET WITH GROUND 230 1440.00 6.26 20 50 2 10
2 - 3.5 mm ² THHN (SERVICE WIRE)
PLUG-IN 1 - 3.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC It = (0.8 x 179.65) + (25% x 8 )= 145.72 Amp. Icb (Main Over Current Protection Device)= 179.65+ (1.5 x 8)=187.65 Amp.
FAULT CIRCUIT INTERRUPTER (GFCI) WIRE SIZE: M AIN CIRCUIT BREAKER : 250 AT, 250 AF, 2P, 85 kAIC, 230 V, 60 Hz,
CONDITION, SPECIFICATIONS & REVISIONS/ CHANGES, LIGHT SWITCHES - 1.20m above Floor finish
MOLDED CASE Circuit Breaker, in a NEMA 3R ENCLOSURE
THE CONTRACTOR SHOULD IMMEDIATELY VERIFY & CONVENIENCE OUTLET - 0.3m above Floor finish 7 PANELBOARD 2 ( SECOND FLOOR) 230 10354.45 46.05 60 100 2 10
2 -14 mm ² THHN (SERVICE WIRE)
PLUG-IN 1 - 5.5 mm ² TW (FOR GROUNDING) 20 mmØ RPVC OR RSC WIRE (FOR GROUNDING)
CONSULT TO/WITH THE ELECTRICAL ENGINEER OF THE TELEPHONE OUTLET - 0.3m above Floor finish
PNP ENGINEERING SERVICE (PNPES), PANEL BOARD - 1.8m ABOVE FLOOR FINISH 8 SPARE 230 1000.00 4.35 GENERATOR RATING:
4. ALL LOCATION & MOUNTING HEIGHTS ARE SUBJECT TO 10. CONDUIT EMBEDDED WITHIN CONCRETE WALL SHALL TRANSFORMER CAPACITY: KVA = {( 179.65 + 8 ) x 230 x 0.80 } / 1000 = 34.53 KVA
HAVE A MINIMUM CEMENT PLASTERED OF 20mm KVA = {179.65 x 230 } / 1000 = 41.32 KVA USE: 35 KVA, 1 PH, 230 V, 60Hz at 80% P.F. SILENT TYPE GENERATOR SET
APPROVAL OF ELECTRICAL ENGINEER OF PNPES, TOTAL 18525.56 81.57
USE: 50 KVA,1 , 13200V / 240V / 110V, PAD or POLE MOUNTED DISTRIBUTION COUPLED TO STAMFORD MAIN ALTERNATOR ENGINE WITH INDUSTRIAL
THICK. @ 80% D.F.
5. CONTRACTOR SHALL BE RESPONSIBLE IN THE 11. ALL CONDUIT/ PIPE ABOVE CEILING SHOULD HAVE
TRANSFORMER MUFFLER, BELLOWS, BATTERY, BATTERY CHARGER,DIESEL ENGINE,
Iw (Ampacity of Wire)= (Total current, It x Demand factor,df) + 25% of Largest motor Icb (Main Over Current Protection Device)= Iw + (1.5 x Largest motor) = 81.57 A CONTROL PANEL, CIRCUIT BREAKER AND OTHER ACCESSORIES
PREPARATION OF AS-BUILT PLANS DULY SIGNED AND INDEPENDENT HANGER/ SUPPORTS. Iw = 81.57 x 0.80 = 65.26 A M AIN CIRCUIT BREAKER : 100 AT, 100 AF, 2P, 10 kA Icn, 230 V, 60 Hz, Homeline Circuit
SEALED BY A PROFESSIONAL ELECTRICAL ENGINEER, 12. ALL LIGHTING FIXTURES SHOULD HAVE INDEPENDENT WIRE SIZE: Breaker, CENTER MAIN in a NEMA Type 1 Enclosure
HANGER/ SUPPORTS. USE: 2 of 30 mm² THHN WIRE in 32 mmØ RPVC OR RSC
AND ELECTRONIC AUTOCAD FILES,
6. FINAL LIGHTING FIXTURES AND WIRING DEVICES SHALL 13. ALL BOXES SHALL BE OCCUPIED ONLY OF 50% OF WIRE
VOLUME. LOAD SCHEDULE
BE APPROVED BY PNPES, REPRESENTATIVE/ENGINEER, 14. VOLTAGE DROP SHALL BE LIMITED TO 2.5% FROM PANELBOARD NO. (PP-2) LOCATION : SECOND FLOOR
7. CONTRACTOR SHALL BE RESPONSIBLE FOR SOURCE TO PANEL BOARD AS P.E.C. REQUIREMENT OR TO POWER
PREPARATION OF SHOP OR CONSTRUCTION DRAWING ACCEPTABLE TO THE LABORATORY EQUIPMENT. VOLTS VOLT-AMPERE AMPERE BREAKER RATING

REQUIRED BY OWNER/ARCHITECH/ENGINEER, THIS 15. CIRCUIT BREAKERS SERVING MOTORS AND LIGHTING
CKT. NO DESCRIPTION
(V) (VA) (A) AT AF POLE KAIC TYPE
SIZE OF WIRE SIZE OF CONDUIT
SOURCE
SHALL BE INDUSTRIAL AND COMMERCIAL BOLT-ON TYPE 5 - 23 watts CELINO LED SURFACE MOUNTED LIGHTING
INCLUDES DEVICES AND FIXTURES ELEVATION, RESPECTIVELY WITH MINIMUM OF 14kAIC. 1
FIXTURES
3 - LUX SPACE GEN III, 12 WATTS LED DOWNLIGHTS 230 667.78 3.93 15 50 2 10
2 - 3.5 mm ² THHN (SERVICE WIRE)
PLUG-IN 1 - 3.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC
8. CONTRACTOR SHALL VISIT SITE CONDITION AND 16. ALL WIRES AND CABLES SHALL BE BRAND NEW AND 3 - EMERGENCY LIGHT
2 - EXHAUST FAN
INCLUDE ALL COST NECESSARY TO COMPLETE THE APPROVED TYPE. 6 - 23 watts CELINO LED SURFACE MOUNTED LIGHTING
SYSTEM AT NO COST TO OWNER, INCLUDING COST OF 17. ALL CIRCUITS SHALL BE 2-WIRES 1Ø AND PREFERABLY BE 2
FIXTURES
5 - LUX SPACE GEN III, 12 WATTS LED DOWNLIGHTS
230 720.00 3.13 15 50 2 10 PLUG-IN
2 - 3.5 mm ² THHN (SERVICE WIRE)
1 - 3.5 mm ² TW (FOR GROUNDING)
15 mm Ø PVC

CORING SERVICE AND EXPENSES FOR THE COLOR CODED AS FOLLOWS: 5 - EMERGENCY LIGHT
LINE 1 - BLACK 35 KVA, 1PH, 230 V, 60Hz at 80% P.F. SILENT TYPE
RESTORATION OF ANY DAMAGE/ AFFECTED CIVIL/ 12 - 23 watts CELINO LED SURFACE MOUNTED LIGHTING GENERATOR SET COUPLED TO STAMFORD MAIN
LINE 2 - RED 3 FIXTURES 230 406.67 1.77 15 50 2 10
2 - 3.5 mm ² THHN (SERVICE WIRE)
PLUG-IN 1 - 3.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC
ARCHITECTURAL FINISHES OR RELOCATION OF 1 - EMERGENCY LIGHT
ALTERNATOR ENGINE WITH INDUSTRIAL
GROUND WIRE - WHITE/GRAY
EXISTING FACILITIES ON BUILDING,
18. USE SOLDERLESS CONNECTOR, MECHANICAL 1 G MUFFLER, BELLOWS, BATTERY, BATTERY
9. CONTRACTOR SHALL LOCATE ALL SPLICING BOXES TO PRESSURE TYPE COPPER LUGS FOR CONNECTION OF ~
4 6 - DUPLEX CONVENIENCE OUTLET 230 2160.00 9.39 20 50 2 10 PLUG-IN
2 - 3.5 mm ² THHN (SERVICE WIRE)
1 - 3.5 mm ² TW (FOR GROUNDING)
15 mm Ø PVC CHARGER,DIESEL ENGINE, CONTROL PANEL,
ACCESSIBLE PLACE OR WITH ACCESS PANELS, WIRES LARGER THAN 8mm².
10. NOMINATED CONTRACTOR TO VERIFY ALL
CIRCUIT BREAKER AND OTHER ACCESSORIES
EMERGENCY
EQUIPMENTS TO BE INSTALLED OR PLACE WITHIN THE 5 4 - DUPLEX CONVENIENCE OUTLET 230 1440.00 6.26 20 50 2 10
2 - 3.5 mm ² THHN (SERVICE WIRE)
PLUG-IN 1 - 3.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC 110V, PAD or POLE MOUNTED SUPPLY
BUILDING, AND MAKE AN ADJUSTMENT WITH THE DISTRIBUTION TRANSFORMER
2 - 3.5 mm ² THHN (SERVICE WIRE)
6 6 - DUPLEX CONVENIENCE OUTLET 230 2160.00 9.39 20 50 2 10 PLUG-IN 15 mm Ø PVC
PNPES ENGINEER/ ARCHITECT CONSENT, 1 - 3.5 mm ² TW (FOR GROUNDING)
BUILD IN C.B FOR GEN SET
11. THIS DRAWINGS ARE DIAGRAMATIC LAYOUT ONLY, 2 - 3.5 mm ² THHN (SERVICE WIRE)
7 5 - WEATHERPROOF OUTLET 230 1800.00 7.83 20 50 2 10 PLUG-IN 1 - 3.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC
ANY MATERIALS AND FITTINGS NOT SHOWN ON THIS
PLANS BUT NEEDED TO COMPLETE THE SYSTEM AND
OPERATION SHALL BE INCLUDED WITH THE 8 SPARE 230 1000.00 4.35
ATS
CONTRACTOR'S SCOPE OF WORKS.
12.
·
ADDITIONAL NOTES:
USE OF MICA SHALL BE LIMITED TO 150mm MAXIMUM @ 80% D.F
TOTAL 10354.45

Iw (Ampacity of Wire)= (Total current, It x Demand factor,df) + 25% of Largest motor


46.05

Icb (Main Over Current Protection Device)= Iw + (1.5 x Largest motor) = 46.05 A
RISER DIAGRAM
· USE OF FLEXIBLE METALLIC CONDUIT SHALL BE LIMITED
TO 1m MAXIMUM
Iw = 46.05 x 0.80 = 36.84 A
WIRE SIZE:
RPVC OR RSC
M AIN CIRCUIT BREAKER : 60 AT, 100 AF, 2P, 10 kA Icn, 240 V, 60 Hz, Homeline Circuit
Breaker, CENTER MAIN in a NEMA Type 1 Enclosure
KwHr
MCB SCALE NTS
· PROVIDE PROPER CONDUIT SUPPORT, G.I. WIRES AS
SUPPORT SHALL NOT BE ALLOWED
· PROVIDE DOUBLE COAT OF RUST PROTECTIVE PAINT LOAD SCHEDULE METER
(RED OXIDE PRIMER) ON HANGERS AND SUPPORTS. PANELBOARD NO. (PP-3) LOCATION : GROUND FLOOR

VOLTS VOLT-AMPERE AMPERE BREAKER RATING


CKT. NO DESCRIPTION SIZE OF WIRE SIZE OF CONDUIT
(V) (VA) (A) AT AF POLE KAIC TYPE

1 - 1 HP, AIRCONDITIONING UNIT (WINDOW OR SPLIT 2 - 5.5 mm ² THHN (SERVICE WIRE)


1 TYPE) 230 1840.00 8.00 30 50 2 10 BOLT-ON
1 - 5.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC

LEGEND 2
1 - 1 HP, AIRCONDITIONING UNIT (WINDOW OR SPLIT
TYPE) 230 1840.00 8.00 30 50 2 10 BOLT-ON
2 - 5.5 mm ² THHN (SERVICE WIRE)
1 - 5.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC

2 - 50 mm² THHN WIRE (SINGLE CONDUCTOR IN FREE AIR) 2 - 50 mm² THHN WIRE (SINGLE CONDUCTOR IN FREE AIR)
1 - 1 HP, AIRCONDITIONING UNIT (WINDOW OR SPLIT 2 - 5.5 mm ² THHN (SERVICE WIRE)
3 TYPE) 230 1840.00 8.00 30 50 2 10 BOLT-ON
1 - 5.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC 1- 30 mm² TW WIRE (FOR GROUNDING) 1- 30 mm² TW WIRE (FOR GROUNDING)
1 - 1 HP, AIRCONDITIONING UNIT (WINDOW OR SPLIT 2 - 5.5 mm ² THHN (SERVICE WIRE)
4 230 1840.00 8.00 30 50 2 10 BOLT-ON 15 mm Ø PVC
TYPE) 1 - 5.5 mm ² TW (FOR GROUNDING)
TO NEAREST POSSIBLE LOCATION
SYMBOL: DESCRIPTION: SYMBOL: DESCRIPTION: 5
1 - 1 HP, AIRCONDITIONING UNIT (WINDOW OR SPLIT
230 1840.00 8.00 30 50 2 10 BOLT-ON
2 - 5.5 mm ² THHN (SERVICE WIRE)
15 mm Ø PVC FOR THE PROVISION OF GENERATOR
SERVICE ENTRANCE
TYPE) 1 - 5.5 mm ² TW (FOR GROUNDING) 3-WIRE, SINGLE PHASE
OR EMERGENCY POWER SUPPLY
2 - 22 mm ² THHN (SERVICE WIRE)
23 watts CELINO LED SURFACE 6 PANELBOARD 4 ( SECOND FLOOR) 230 10360.00 45.04 80 100 2 10 BOLT-ON 25 mmØ RPVC OR RSC PROVIDE WITH CONNECTOR IN
FACP FIRE ALARM CONTROL PANEL 1 - 8.0 mm ² TW (FOR GROUNDING)
MOUNTED LIGHTING FIXTURES PULLBOX/NEMA 3R AS REQUIRED 250 AT, 250 AF, 2P, 85 kAIC, 230 V,
TOTAL 19560.00 85.04 60 Hz, MOLDED CASE Circuit
Breaker, in a NEMA 3R ENCLOSURE MAIN CIRCUIT BREAKER (MCB) CT RATED METER
LUX SPACE GEN III, 12 WATTS or 8.5 Iw (Ampacity of Wire)= (Total current, It x Demand factor,df) + 25% of Largest motor Icb (Main Over Current Protection Device)= Iw + (1.5 x Largest motor) = M
WATTS LED DOWNLIGHTS ( SEE FIRE ALARM BELL CTR 5:200
Iw = I @ 100% D.F. Icb (Main Over Current Protection Device)= 85.04 + (1.5 x 8) = 97.04 A
LOAD SCHEDULE) WIRE SIZE: TOTAL CURRENT + (0.25 X HIGHEST MOTOR CURRENT = M AIN CIRCUIT BREAKER : 125 AT, 250 AF, 2P, 25 kA Icn, 240 V, 60 Hz,
WIRE SIZE: 85.04 + (0.25 x 8) = 87.04 MOLDED CIRCUIT BREAKER, CENTER MAIN in a NEMA Type 1 2-30mm² THHN WIRE 2-38mm² THW Cu Wire
EXHAUST FAN RACEWAY CONDUIT CONCEALED USE: 2 of 38 mm² THHN WIRE in 32 mmØ RPVC OR RSC 1-14mm² THW Cu Wire (Grounding) 1-14mm² THW Cu Wire (Grounding)
Enclosure
EF ON CEILING in 32mm Ø RSC Pipe in 32 mm Ø RSC Pipe

EMERGENCY LIGHT RACEWAY CONDUIT CONCEALED


UNDER THE FLOOR OR GROUND PP-3
PP-1
2 of 38 mm² THHN WIRE in 32
LOAD SCHEDULE
DUPLEX CONVENIENCE OUTLET CIRCUIT BREAKER, NUMBER
mmØ RPVC OR RSC

20 100 AT, 2P 125 AT, 2P

INDICATE AMPERE RATING PANELBOARD NO. (PP-4) LOCATION : SECOND FLOOR

VOLTS VOLT-AMPERE AMPERE BREAKER RATING


CKT. NO DESCRIPTION SIZE OF WIRE SIZE OF CONDUIT
GFCI DUPLEX CONVENIENCE OUTLET GROUNDING (V) (VA) (A) AT AF POLE KAIC TYPE LIGHTING(GROUND FLOOR) C1
15 AT, 2P 15 AT, 2P
C2 LIGHTING(GROUND FLOOR) ACU(GROUND FLOOR) C1
30 AT, 2P 30 AT, 2P
C2 ACU(GROUND FLOOR)
15 AT, 2P 20 AT, 2P 30 AT, 2P 30 AT, 2P

WITH GROUND FAULT CIRCUIT 1 - 1 HP, AIRCONDITIONING UNIT (WINDOW OR SPLIT 2 - 5.5 mm ² THHN (SERVICE WIRE)
LIGHTING(GROUND FLOOR) C3
20 AT, 2P 20 AT, 2P
C4 OUTLETS(GROUND FLOOR) ACU(GROUND FLOOR) C3
30 AT, 2P 80 AT, 2P
C4 ACU(GROUND FLOOR)
PANEL BOARD, PP-4
INTERRUPTER (GFCI) 1 230 1840.00 8.00 30 50 2 10 PLUG-IN 1 - 5.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC OUTLETS(GROUND FLOOR) C5 C6 OUTLETS(GROUND FLOOR) ACU(GROUND FLOOR) C3 C6 (SECOND FLOOR)
PP-1 TYPE) 60 AT, 2P
PANEL BOARD, ALPHABET & PANEL BOARD, PP-2
(SECOND FLOOR) C7 SPARE

NUMBERS INDICATE ASSIGNED 2


1 - 1 HP, AIRCONDITIONING UNIT (WINDOW OR SPLIT
230 1840.00 8.00 30 50 2 10
2 - 5.5 mm ² THHN (SERVICE WIRE)
PLUG-IN 1 - 5.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC
WEATHERPROOF OUTLET PANEL TYPE)
wp
1 - 1 HP, AIRCONDITIONING UNIT (WINDOW OR SPLIT 2 - 5.5 mm ² THHN (SERVICE WIRE)
3 230 1840.00 8.00 30 50 2 10 PLUG-IN 1 - 5.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC PP-4
S or Sa ONE GANG SWITCH TYPE)
PP-2
1 - 1 HP, AIRCONDITIONING UNIT (WINDOW OR SPLIT 2 - 5.5 mm ² THHN (SERVICE WIRE) PROVIDE GROUNDING ROD 2 of 22 mm² THHN WIRE in
25 mmØ RPVC OR RSC
TELEPHONE OUTLET 4 230 1840.00 8.00 30 50 2 10 PLUG-IN 1 - 5.5 mm ² TW (FOR GROUNDING) 15 mm Ø PVC
TYPE)
RSC
GROUND
TERMINAL
COPPER CLAD STEEL ROD GROUND
TERMINAL
80 AT, 2P

TWO GANG SWITCH,ALPHABET 60 AT, 2P


16 mm Ø x 2400 mm BLOCK
Sab INDICATE ASSIGNMENT OF LIGHTS 5 SPARE 230 1500.00 6.52
BLOCK

INTERCOM OUTLET ACU (SECOND FLOOR) C1


30 AT, 2P 30 AT, 2P
ACU (SECOND FLOOR)
C2
30 AT, 2P
6 SPARE 230 1500.00 6.52 15 AT, 2P 15 AT, 2P 30 AT, 2P
THREE GANG SWITCH,ALPHABET ACU (SECOND FLOOR) C3 C4 ACU (SECOND FLOOR)

Sabc C1
LIGHTING(SECOND FLOOR) C2 LIGHTING(SECOND FLOOR)
15 AT, 2P 20 AT, 2P
SPARE SPARE
INDICATE ASSIGNMENT OF LIGHTS TOTAL 10360.00 45.04
LIGHTING(SECOND FLOOR) C3
20 AT, 2P 20 AT, 2P
C4 OUTLETS(SECOND FLOOR)

OUTLETS(SECOND FLOOR) C5 C6 OUTLETS(SECOND FLOOR)


VOICE/DATA OUTLET 20 AT, 2P
OUTLETS(SECOND FLOOR) C7 SPARE

TWO-WAY SWITCH,ALPHABET Iw (Ampacity of Wire)= (Total current, It x Demand factor,df) + 25% of Largest motor Icb (Main Over Current Protection Device)= Iw + (1.5 x Largest motor) =
S2abc INDICATE ASSIGNMENT OF LIGHTS IT = I @ 100% D.F. = 45.04 GROUND
Icb (Main Over Current Protection Device)= 45.04 + (1.5 x 8) = 57.04 TERMINAL
WIRE SIZE: TOTAL CURRENT + (0.25 X HIGHEST MOTOR CURRENT =
SINGLE LINE DIAGRAM
GROUND
SD SMOKE DETECTOR M AIN CIRCUIT BREAKER : 80 AT, 100 AF, 2P, 10 kA Icn, 240 V, 60 Hz, TERMINAL
BLOCK

C-3 WIRE SIZE: 45.04 + (0.25 X 8) = 47.04 BLOCK


RUNNING CIRCUIT, UPPER PART Homeline Circuit Breaker, CENTER MAIN in a NEMA Type 1 Enclosure
INDICATE CIRCUIT NO. , LOWER PART
USE: 2 of 22 mm² THHN WIRE in 25 mmØ RPVC OR RSC GROUND 1 - 5.5 mm²
LP3 GROUND 1 - 5.5 mm²
THW in 15 mmØ PVC
PIPE
COPPER CLAD GROUND
ROD 20 mmØ x 3m
INDICATE ASSIGNED PANEL BOARD COPPER CLAD GROUND
F FIRE ALARM SYSTEM MANUAL THW in 15 mmØ PVC
PIPE
ROD 20 mmØ x 3m
SCALE NTS

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:

B
L I C WO
R
GENERAL NOTES
REPUBLIC OF THE PHILIPPINES
U K
P
S
F

LEGEND
O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF POLICE STATION


N T

E-6
ME

H I

REGIONAL OFFICE IX
G
T

BUILDING LOAD SCHEDULE/DESIGN COMPUTATION


R

W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY JOCELYN T. BRUCES PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) RISER DIAGRAM ENGINEER II ENGINEER III DISTRICT ENGINEER 26 27
REGISTERED ELECTRICAL ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
SINGLE LINE DIAGRAM
DATE: NOVEMBER 2019 DATE: DATE: DATE: DATE:
SERVICE ENTRANCE 1 SERVICE ENTRANCE DETAIL GFCI RECEPTACLE
SINGLE PHASE, 240VAC, 60Hz
2 - 100 mm² THW Cu Wire
E-1 NOT TO SCALE
1 - 22 mm² THW in 65 mm Ø RSC Pipe
SERVICE DROP LINE NOTES:
2-100 mm² THW Cu Wire 1. THE LOCATION OF SERVICE ENTRANCE MAY DEPEND ON THE IMPORTANT: the white pigtail
1-22 mm² ACSR 5 NEAREST ELECTRIC UTILITY SUPPLY
8"
Ø EYEBOLT
GALVANIZED 2. THE LOCATION OF PROPOSED EMERGENCY SUPPLY MAY
ALSO DEPEND ON THE SITE DEVELOPMENT
BLACK
RED
from the GFCI MUST connect to
the Incoming Line Neutral Wire at
the Breaker panel or Sub-Panel.
NOTES:
CURRENT TRANFORMER The GFCI will not work without it.
ENCLOSED, CTR: 5:200 WHITE
USE
- ALL LIGHTING FIXTURES

NEUTRAL
SERVICE ENTRANCE POLE (See Detail 3-E1)
SOLDERLESS HOT TEST BUTTON

BAR
3700mm High for residential property and driveways FROM ELECTRIC
CONNECTORS 5500mm High for public streets, alleys, roads, SERVICE PANEL OR
DRIP LOOP
at least 1500mm
parking areas subject to truck traffic OTHER SOURCE
SPECIFIED HERE-IN SHALL BE OF
TAIL

APPROVED TYPE SUPERIOR


PIG
CI
GF

15 mm Ø RSC with clamps


1-65 mmØ RIGID STEEL CONDUIT
w/ COMPLETE SUPPORTS
4-3.5mm² THHN Cu Wire
QUALITY ELEGANT TYPE AND

GROUND
MDM
SHALL BE PRE-APPROVED PRIOR

BAR
KWHR METER PROVIDE MAIN DISCONNECTING MEANS
CT RATED in NEMA 3R ENCLOSURES IN NEMA 3R ENCLOSURES for SERVICE
LATERAL OF MORE THAN 30M LOAD 2
RED
TO TEC REMOTE
CONTROL EQUIPMENT
TEC REMOTE
Enclosure
TO INSTALLATION, CONTRACTOR
LOAD NEUTRAL

1 - 22 mm² THW Cu Wire (Grounding)


LOAD 1
BLACK
WHITE
SHALL SUBMIT SAMPLES FOR
in 20 mm Ø PVC Pipe, Sched 40

PROVIDE GROUNDING ROD


ENGINEER'S/
COPPER CLAD STEEL ROD 16 mm Ø x 2400 mm
DESIGNER'S APPROVAL.
NUETRAL RESET BUTTON GROUND

2 SERVICE POLE DETAIL


E-1 NOT TO SCALE

TOP
0.20

1000.00

STEEL BARS
STIRRUPS

167.00
NOTE:
Coordinate to the Structural Engineer
N. G. L. the Size of Steel Bars

1.00
1220.00

4 STEEL BARS
1.5

BOTHWAYS

12.00
1.00

88.00
0.35
0.30

71.00

1.00 0.40
1220.00

SD SD SD SD SD SD SD SD SD

SECOND
FLOOR
Celino LED Lighting Fixture LUX SPACE GEN III, 12 WATTS LED DOWNLIGHTS
USE 3.5 mm² THW
WIRE in 15 mm ɸ SD SD SD SD SD
PVC PIPE

DETAILS:
Dimension ( mm ) :( L x W x H ) 1220 x 71 x 88
USE 3.5 mm²
Lumen/Watt : 2050 lm / 23 Watts
THW WIRE in 15
mm ɸ PVC PIPE
Lifetime L70* : 5000 hrs DETAILS:
GROUND Optics : Microlens Optics in Dimension ( in mm ): See Attatched
FLOOR
FACP Polycarbonate cover Lumen/Watt : 1000 lm / 12 Watts
USE 3.5 mm² THW
WIRE in 20 mm ɸ
Installation : Surface and suspended Lifetime L70* : 50,000 hrs
PVC PIPE
mounting Installation : Recessed Mounting

FIRE ALARM RISER DIAGRAM


SCALE NTS

PROJECT & LOCATION: SHEET CONTENT: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
NO.:

B
L I C WO
R
SERVICE ENTRANCE DETAIL
REPUBLIC OF THE PHILIPPINES
U K
P
S
F

FIRE ALARM RISER DIAGRAM


O

A N

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF POLICE STATION


N T

E-7
ME

H I

REGIONAL OFFICE IX
G
T

BUILDING GFCI DETAILS


R

W
A A
P Y
D E S

VETERANS EXTENSION AVE., TETUAN, ZAMBOANGA CITY JOCELYN T. BRUCES PIO MARIO T. LACASTESANTOS SATURNINO C. TORREFRANCA KHADAFFY D. TANGGOL CAYAMOMBAO D. DIA, CESO IV
(STANDARD PLAN) LIGHTING FIXTURE DETAILS ENGINEER II ENGINEER III DISTRICT ENGINEER 27 27
REGISTERED ELECTRICAL ENGINEER CHIEF, BRIDGE & OTHER PUBLIC WORKS DESIGN SECTION OIC - CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: NOVEMBER 2019 DATE: DATE: DATE: DATE: