BILL OF QUANTITIES FOR PROPOSED

PROPOSED UNDER GROUND WATER


TANK BOQ

CONTRACT

CLIENT: BRITANIA ALLIED INDUSTRIES LIMITED

INDICON LIMITED
MAIN P.O Box 28331, KAMAPALA
CONTRACTOR TEL: 0750992277
Email: indiconltd27@gmail.com

ARCHITECTS:

DECEMBER 2021
PROPOSED UNDER GROUND WATER TANK
Item Description Amount

PROPOSED RETAINING WALL LOCATION

BILL No.: PROPOSED UNDER GROUND WATER


1 28,052,500
TANK

TOTAL BILL No. TO GENERAL SUMMARY 28,052,500

VAT 18% 5,049,450

TOTAL AMOUNT OF CONTRACT 33,101,950


BILL
NO.
Item: Description Unit Qty Rate UGX Amount

BILL No.: PROPOSED UNDER GROUND WATER


TANK

1 4M LENTH X 3M WIDTH X 3M HEIGHT 28,052,500

TOTAL BILL No. TO GENERAL SUMMARY 28,052,500


PROPOSED RETAINING WALL
Sub-structure
Excavate to reduce levels starting from stripped level for bases
B Cm 70.0 12,000 840,000
Filling with Stabilized Murrum brought from outside to make
D Cm 49.2 45,000 2,214,000
up levels; in 150mm layers, well rolled and compacted to 95%
MDD to Project
'Termidor Manager's
25 EC'' or otherapproval
equal and approved anti-
termite chemical applied in accordance with the -
manufacturer's instructions to:
Bottom, sides, surfaces of excavated ground with ten years
F Sm 61.0 1,500 91,500
guarantee
Return, fill and ram selected excavated materials around
G foundations in 150mm layers and compact to 95% MDD. Cm 7.0 10,000 70,000

Retaining wall -
A 50mm concrete blinding layer C15 concrete Sm 15.0 20,000 300,000
200mm thick R C C concrete Base C25 concrete (Cement
B Cm 2.4 600,000 1,440,000
OPC CEM II 42.5)
250mm thick R C C concrete walls C25 concrete (Cement
C Cm 12.3 600,000 7,350,000
OPC CEM II 42.5)
150mm thick R C C concrete walls C25 concrete (Cement
D Cm 2.1 600,000 1,260,000
OPC CEM II 42.5)
Reinforcement bars to BS 4449 as described in; -
E 12mm.sq reinforcement bars for the Base slab Kg 977.0 5,100 4,982,700
F 10mm.sq reinforcement bars for the reinforced walls Kg 373.0 5,100 1,902,300
Formwork to: Edges of reinforced concrete base 75-225mm
G sm 7.0 30,000 210,000
wide
Ditto: Vertical sides of reinforced concrete wall supported and
H Sm 117.0 30,000 3,510,000
ready to receive concrete
I Water proofing sika seal-105 Sm 54.0 38,000 2,052,000
I plaster inside only Sm 54.0 20,000 1,080,000
J Hevy duty mhanhole cover 600x600 NO 1 750,000 750,000
Total Carried to SUMMARY 28,052,500

16M 3
1 VALIDITY
The above quotation is only valid for 15 day

2 PAYMENT TERMS
Signed quotation/ contract/ local purchase order (LPO)
50%Advance payment of contract value on confirmation
50% Payment on completion of work

3 INSTALLATION AT SITE
Water, storage, security shall be provided by client
Approved permission letter for the work shall be provided by client
If any recqurd KCCA document provided by the client
Measurement will be conformed after completion of the work
if any changes or incurring height of wall form structure drawing shall be extra charges

we thanks you once again for the opportunity to provide you with a quotation for the above mentioned project.
we hope that the above mentioned criterias and
instructions from you to work in this project and others in future.

Yours Faithfully,

Kishor Kerai
Managing Director
Indicon Ltd

CLIENT CONFIRMATION

I confirm the above mentioned quotation and terms

Client's name & signature: ….................................................................

Date: ….....................