1.0 Purpose:

This procedure is to detail the work instructions required to calibrate the Crowcon Xgard H2S and
HC gas detectors.

2.0 Scope:

This procedure shall be followed to calibrate the Crowcon Xgard H2S (Type 1) gas detectors and HC
(Type 5) gas detectors.

Manufacturer (Crowcon) recommends the detectors be gas tested at least every 6 months (STEM 2
Maintenance) and re-calibrated as necessary. This procedure therefore details the work
instructions required to perform the calibration.

3.0 Definitions:

3.1 DVM: Digital Volt Meter

Schlumberger Private
3.2 LEL: Lower Explosive Limit
3.3 ppm: Parts per million

4.0 Responsibilities:

4.1 People
4.1.1 Design Engineer:
To provide the procedure to perform the required modification.

4.1.2 Project Manager


To review and approve the procedure.

4.1.3 Electrical Technician


To understand, perform the calibration on the detectors as needed.

4.1.4 Maintenance Supervisor


To verify that the routine maintenance has properly been executed.

Do not disclose, use or reproduce without written approval from Schlumberger.

Warning: The controlled source document of this document is stored within the Product Data Management (PDM) System Any paper version of
this document is uncontrolled and should be compared with the source document at time of use to ensure it is up-to-date.
PDM # 101179210
Revision: AA
Date: 27-AUG-2012
INSTRUCTION-PROCEDURE Page: 2 of 16
TITLE: CALIBRATION PROCEDURE, CROWCON XGARD GAS DETECTORS

5.0 Procedure:

5.1 Qualification Requirements:


5.1 Qualified Electrical Technician having knowledge on EN 60079-17:2008 standard.

5.2 Personnel Requirements:


5.2.1 Electrical Technician

5.2.2 Maintenance Supervisor

5.3 Equipment and/or Business System Requirements:

5.3.1 Equipment required for calibrating the gas detectors.

SLB P/N Description Qty Supplier


KIT, CALIBRATION, XGARD GAS DETECTORS,
101177432 1.0 PPCS
34L H2S AND CH4 GAS CAN
Note:

Schlumberger Private
The above mentioned parts can be ordered via SWPS as M&S by order from PPCS.

The kit consists of the following components:

Item Manufacturer’s
Description Manufacturer Qty
No. Part Number
Calibration Adaptor for Xgard Gas
1 Crowcon C03005 1
Detector
H2S Gas Can + Regulator:
Calibration Gas: 25ppm Hydrogen
2 Crowcon CRWS0004 1
Sulphide (H2S) Balance Air, 34L
Can, Type 2AL
Regulator 0.5L/min with 2 ft Clear CRWS1002 +
3 Crowcon 1
Tube fits type 2AL CRWS1004
CH4 Gas Can + Regulator:
Calibration Gas: 2.5% vol (50% LEL)
4 Crowcon CRWS0082 1
Methane (CH4) Balance Air, 34L
Can, Type 7HP
Regulator 0.5L/min with 2 ft Clear CRWS1001 +
5 Crowcon 1
Tube fits type 7HP CRWS1003

Do not disclose, use or reproduce without written approval from Schlumberger.

Warning: The controlled source document of this document is stored within the Product Data Management (PDM) System Any paper version of
this document is uncontrolled and should be compared with the source document at time of use to ensure it is up-to-date.
PDM # 101179210
Revision: AA
Date: 27-AUG-2012
INSTRUCTION-PROCEDURE Page: 3 of 16
TITLE: CALIBRATION PROCEDURE, CROWCON XGARD GAS DETECTORS

5.3.2 Tools required to perform calibration of the gas detectors.

• Small cross-head screwdriver


• Digital Volt Meter (DVM)
• Allen key

Warning

1. All maintenance should be performed in accordance with EN 60079-17:2008 by qualified


service personnel.
2. Ensure local regulations and site procedures are followed.
3. Never attempt to open the detector or junction box when flammable gas is present.
4. Ensure the associated control panel is inhibited to prevent false alarms.

5.4 Calibration of Xgard H 2S (Type 1) gas detectors

5.4.1 Slacken the grub-screw on the lid of the detector then unscrew the lid by turning in
an anti-clockwise direction.

Schlumberger Private

Figure 1: Location of the grub-screw on the gas detector

Note:
Glass reinforced Nylon junction boxes do not include a grub screw.

Do not disclose, use or reproduce without written approval from Schlumberger.

Warning: The controlled source document of this document is stored within the Product Data Management (PDM) System Any paper version of
this document is uncontrolled and should be compared with the source document at time of use to ensure it is up-to-date.
PDM # 101179210
Revision: AA
Date: 27-AUG-2012
INSTRUCTION-PROCEDURE Page: 4 of 16
TITLE: CALIBRATION PROCEDURE, CROWCON XGARD GAS DETECTORS

5.4.2 Check there is a minimum of 8V DC on the “+” and “–” terminals of the detector.

Schlumberger Private

Figure 2: Terminals to check the DC voltage input

Do not disclose, use or reproduce without written approval from Schlumberger.

Warning: The controlled source document of this document is stored within the Product Data Management (PDM) System Any paper version of
this document is uncontrolled and should be compared with the source document at time of use to ensure it is up-to-date.
PDM # 101179210
Revision: AA
Date: 27-AUG-2012
INSTRUCTION-PROCEDURE Page: 5 of 16
TITLE: CALIBRATION PROCEDURE, CROWCON XGARD GAS DETECTORS

5.4.3 Allow the detector to stabilize. Manufacturer recommends a minimum 1hour of


stabilizing time for the gas detectors from the instant they were turned ON.

5.4.4 Connect a digital volt meter (DVM) to test points TP1 and TP2 on the amplifier PCB,
the DVM should be set to the dc mV range.

5.4.5 Zeroing the Detector


Ensure you are in clean air, free from combustible and toxic gases. Adjust the “ZERO”
pot on the amplifier until the DVM reads 40mV.

Schlumberger Private

Figure 3: Zeroing the Type 1 detector

Do not disclose, use or reproduce without written approval from Schlumberger.

Warning: The controlled source document of this document is stored within the Product Data Management (PDM) System Any paper version of
this document is uncontrolled and should be compared with the source document at time of use to ensure it is up-to-date.
PDM # 101179210
Revision: AA
Date: 27-AUG-2012
INSTRUCTION-PROCEDURE Page: 6 of 16
TITLE: CALIBRATION PROCEDURE, CROWCON XGARD GAS DETECTORS

5.4.6 Install the Calibration Adaptor (Crowcon P/N C03005) to the detector.

Figure 4: Calibration Adaptor (Crowcon P/N C03005)

Schlumberger Private

Figure 5: Install the calibration adapter to the gas detector


Do not disclose, use or reproduce without written approval from Schlumberger.

Warning: The controlled source document of this document is stored within the Product Data Management (PDM) System Any paper version of
this document is uncontrolled and should be compared with the source document at time of use to ensure it is up-to-date.
PDM # 101179210
Revision: AA
Date: 27-AUG-2012
INSTRUCTION-PROCEDURE Page: 7 of 16
TITLE: CALIBRATION PROCEDURE, CROWCON XGARD GAS DETECTORS

5.4.7 Connect the 2ft clear tube (Crowcon P/N CRWS1004) to the 0.5L/min flow regulator
Crowcon P/N CRWS1002). Then connect the regulator to H2S the gas can (Crowcon
P/N CRWS0004).

Schlumberger Private
Figure 6: H2S gas bottle-regulator assembly

Note:
It is recommended that the needle valve of the regulator is left slightly in its ‘Open’
position while making the initial connection to the gas bottle. Once you see the
gas coming out from the other end of the tube fully close the needle valve. This
prevents any chances of air getting inside the cylinder and affecting the gas
concentration.

5.4.8 Connect the loose end of the 2ft clear tube (Crowcon P/N CRWS1004) to either of the
nipples on the calibration adapter.

Do not disclose, use or reproduce without written approval from Schlumberger.

Warning: The controlled source document of this document is stored within the Product Data Management (PDM) System Any paper version of
this document is uncontrolled and should be compared with the source document at time of use to ensure it is up-to-date.
PDM # 101179210
Revision: AA
Date: 27-AUG-2012
INSTRUCTION-PROCEDURE Page: 8 of 16
TITLE: CALIBRATION PROCEDURE, CROWCON XGARD GAS DETECTORS

5.4.9 Calibrating the Detector


Apply calibration gas to the detector at a flow rate of 0.5 – 1 liter per minute via flow
adaptor (Crowcon P/N C03005). Allow the gas reading to stabilize and adjust the
“CAL” pot until the DVM reads 120 mV.

Schlumberger Private
Figure 7: Calibrating the H2S detector

5.4.10 Remove the gas and allow the sensor to stabilize then re-check the zero setting.
Close the junction box ensuring it is securely tightened then tighten the grub-screw.

The detector is now calibrated and operational.

Do not disclose, use or reproduce without written approval from Schlumberger.

Warning: The controlled source document of this document is stored within the Product Data Management (PDM) System Any paper version of
this document is uncontrolled and should be compared with the source document at time of use to ensure it is up-to-date.
PDM # 101179210
Revision: AA
Date: 27-AUG-2012
INSTRUCTION-PROCEDURE Page: 9 of 16
TITLE: CALIBRATION PROCEDURE, CROWCON XGARD GAS DETECTORS

5.5 Calibration of Xgard CH 4 (Type 5) gas detectors

5.5.1 Slacken the grub-screw on the lid of the detector then unscrew the lid by turning in
an anti-clockwise direction.

Schlumberger Private
Figure 8: Location of the grub-screw on the gas detector

5.5.2 Measure the voltage across the “+” and “–” terminals of the detector and check a
minimum supply of 10V DC is present.

Do not disclose, use or reproduce without written approval from Schlumberger.

Warning: The controlled source document of this document is stored within the Product Data Management (PDM) System Any paper version of
this document is uncontrolled and should be compared with the source document at time of use to ensure it is up-to-date.
PDM # 101179210
Revision: AA
Date: 27-AUG-2012
INSTRUCTION-PROCEDURE Page: 10 of 16
TITLE: CALIBRATION PROCEDURE, CROWCON XGARD GAS DETECTORS

Schlumberger Private

Figure 9: Terminals to check the DC voltage input

Do not disclose, use or reproduce without written approval from Schlumberger.

Warning: The controlled source document of this document is stored within the Product Data Management (PDM) System Any paper version of
this document is uncontrolled and should be compared with the source document at time of use to ensure it is up-to-date.
PDM # 101179210
Revision: AA
Date: 27-AUG-2012
INSTRUCTION-PROCEDURE Page: 11 of 16
TITLE: CALIBRATION PROCEDURE, CROWCON XGARD GAS DETECTORS

5.5.3 Allow the detector to stabilize. Manufacturer recommends a minimum 1hour of


stabilizing time for the gas detectors from the instant they were turned ON.

5.5.4 Balancing the Pellistors


Before calibrating the detector, the pellistors must be balanced. To do this, remove
the PCB cover and connect a digital volt meter (DVM) to test points TP3 and TP4. The
DVM should be set to the DC mV range and the potentiometer marked “VR3” should
be adjusted until the DVM reads 0.00mV.

Figure 10: Location of Test Points TP3 & TP4 and the potentiometer VR3 Schlumberger Private

Do not disclose, use or reproduce without written approval from Schlumberger.

Warning: The controlled source document of this document is stored within the Product Data Management (PDM) System Any paper version of
this document is uncontrolled and should be compared with the source document at time of use to ensure it is up-to-date.
PDM # 101179210
Revision: AA
Date: 27-AUG-2012
INSTRUCTION-PROCEDURE Page: 12 of 16
TITLE: CALIBRATION PROCEDURE, CROWCON XGARD GAS DETECTORS

Schlumberger Private
Figure 11: Measuring voltage across test points TP3 & TP4

5.5.5 Zeroing the Detector


Connect the DVM to test points TP1 and TP2 on the amplifier PCB. Ensure you are in
clean air, free from combustible and toxic gases. Adjust the “ZERO” pot on the
amplifier until the DVM reads 40mV. Check that the control equipment display reads
zero.

Do not disclose, use or reproduce without written approval from Schlumberger.

Warning: The controlled source document of this document is stored within the Product Data Management (PDM) System Any paper version of
this document is uncontrolled and should be compared with the source document at time of use to ensure it is up-to-date.
PDM # 101179210
Revision: AA
Date: 27-AUG-2012
INSTRUCTION-PROCEDURE Page: 13 of 16
TITLE: CALIBRATION PROCEDURE, CROWCON XGARD GAS DETECTORS

Schlumberger Private
Figure 12: Zeroing the Type 5 detector

5.5.6 Install the Calibration Adaptor (Crowcon P/N C03005) to the detector.

Figure 13: Calibration Adaptor (Crowcon P/N C03005)


Do not disclose, use or reproduce without written approval from Schlumberger.

Warning: The controlled source document of this document is stored within the Product Data Management (PDM) System Any paper version of
this document is uncontrolled and should be compared with the source document at time of use to ensure it is up-to-date.
PDM # 101179210
Revision: AA
Date: 27-AUG-2012
INSTRUCTION-PROCEDURE Page: 14 of 16
TITLE: CALIBRATION PROCEDURE, CROWCON XGARD GAS DETECTORS

Figure 14: Install the calibration adapter to the gas detector

5.5.7 Connect the 2ft clear tube (Crowcon P/N CRWS1003) to the 0.5L/min flow regulator

Schlumberger Private
Crowcon P/N CRWS1001). Then connect the regulator to CH4 gas can (Crowcon P/N
CRWS0082).

Figure 15: CH4 gas bottle-regulator assembly


Note:
It is recommended that the needle valve of the regulator is left slightly in its ‘Open’
position while making the initial connection to the gas bottle. Once you see the
gas coming out from the other end of the tube fully close the needle valve. This
prevents any chances of air getting inside the cylinder and affecting the gas
concentration.

Do not disclose, use or reproduce without written approval from Schlumberger.

Warning: The controlled source document of this document is stored within the Product Data Management (PDM) System Any paper version of
this document is uncontrolled and should be compared with the source document at time of use to ensure it is up-to-date.
PDM # 101179210
Revision: AA
Date: 27-AUG-2012
INSTRUCTION-PROCEDURE Page: 15 of 16
TITLE: CALIBRATION PROCEDURE, CROWCON XGARD GAS DETECTORS

5.5.8 Connect the loose end of the 2ft clear tube (Crowcon P/N CRWS1003) to either of the
nipples on the calibration adapter.

5.5.9 Calibrating the Detector


Apply calibration gas to the detector at a flow rate of 0.5 – 1 liter per minute via flow
adaptor (Crowcon P/N C03005). Allow the gas reading to stabilize and adjust the
“CAL” pot until the DVM reads 120 mV.

Schlumberger Private
Figure 16: Calibrating the CH4 detector

5.5.10 Remove the gas and allow the sensor to stabilize then re-check the zero setting.
Close the junction box ensuring it is securely tightened then tighten the grub-screw.

The detector is now calibrated and operational.

Do not disclose, use or reproduce without written approval from Schlumberger.

Warning: The controlled source document of this document is stored within the Product Data Management (PDM) System Any paper version of
this document is uncontrolled and should be compared with the source document at time of use to ensure it is up-to-date.
PDM # 101179210
Revision: AA
Date: 27-AUG-2012
INSTRUCTION-PROCEDURE Page: 16 of 16
TITLE: CALIBRATION PROCEDURE, CROWCON XGARD GAS DETECTORS

5.6 Documentation and Retention:


5.6.1 This Procedure shall be reviewed for its continuing use, five years (maximum) from
the date of release.
5.6.2 Documents generated by this Procedure shall have a continuing use review period no
longer than 5 years from their date of release

6.0 Applicable References


6.1 Normative References
N/A

6.2 Informative References


N/A

7.0 Required Approvals:


N/A

Schlumberger Private

Do not disclose, use or reproduce without written approval from Schlumberger.

Warning: The controlled source document of this document is stored within the Product Data Management (PDM) System Any paper version of
this document is uncontrolled and should be compared with the source document at time of use to ensure it is up-to-date.

You might also like