2-Geotechnical Investigation
2-Geotechnical Investigation
Page 1 of 4
CAT Site Supv./ Frmn. Khalid Majeed Site Supervisor Civil 0500569118
CAT Site Safety Supervisor Zahid Mahmood Bhatti HSE Supervisor 0504638022
1. Mobilization of Equipment to 1. Interaction with Light & Heavy 1. Follow speed limit.
the site Vehicles. 2. Head lights to be turned on when on the move. Hazard lights to be turned
2. Adverse Road conditions on when vehicle is temporarily stopped along the side of the highway.
3. Commuters/Pedestrians 3. Not to take any unwanted risk during shifting.
4. Bogged vehicle 4. Plan ahead for the route and always be alert for any consequences.
5. Get a map and use alternative route for better road condition.
6. Presence of mind while behind the wheel & expect the unexpected. Make CAT/ Operation
eye contact with other commuters. SAPMT
7. Vehicle / Rig equipment check pre-start. (follow-up)
8. Ensure that service vehicle & the rig have water, fire extinguisher, first aid
kit, warning triangle, spare tire, and jack & communication device.
9. A support vehicle should be always with drill truck for immediate help.
10. Follow Traffic and Vehicle safety Manual (Chapter 8 of SA Contractor Safety
Manual) while driving in Aramco Premises
2. Work Permit 1. Violation of work permit system 1. Issue the correct permit for the job.
2. Incorrect filling of permit 2. Issuer and receiver both would have in their possession the valid work
3. Not meeting the requirements permit card certification.
4. Accident & Injury 3. Gas test will be performed before issuing work permit when required.
4. Job description and equipment to be used will be clearly stated on the work
permit. CAT/ Operation
5. All tick boxes will be correctly filled and gas readings indicated. SAPMT
6. Work permits will be issued for specific period of time required to complete 1 (follow-up)
the job.
7. To extend work permit time the oncoming shift issuer will inspect the job
site and write extended time on the permit.
8. Special precautions like fire watch, standby man, barricading, will be stated
on the work permit.
PMT/Contractor JSA Form - 1/12/2008
Page 3 of 4
3.
1. Underground pipeline or cable 1. Metal detector to be utilized prior to use any cutting operation.
CAT/ Operation
damage
Cutting of Asphalt SAPMT
2. Broken cutting tool 2. Safe distance should be maintained.
2 (follow-up)
3. Pinch point 3. PPEs (steel toe safety shoes).
1. Ample cold water storage should be available for drinking. Heat stress CAT/ Operation
2. Dig hole for water 1. Heat stress SAPMT
training
circulation (follow-up)
1. People clear distance from machine
3. Level Rig 1. Pinch points
6. Drilling Activity
1. Drilling, retraction and 1. Moving parts 1. No loose clothing (procedure) Communication. Train new people, brake cat
sampling 2. Impact head when not in use. Keep cat head clean. Use low gear. CAT/ Operation
2. PPE (Head hut, Gloves, Ear plug) SAPMT
(follow-up)
2. Handling drill pipes 1. Pinch points. 1. PPE (Safety Shoes, Gloves).
2. manual lifting 2. Training for manual lifting (As per RGF Safety Manual), 25kg limit (for safety
person).
7.
1. Pinch points. 1. PPE (Safety Shoes, Gloves). CAT/ Operation
Remove Samples SAPMT
2. Lifting sample box 2. Training for manual lifting (As per RGF Safety Manual), 25kg limit (for safety
person). (follow-up)
8.
CAT/ Operation
1. Pinch points 1. PPE (Safety shoes, Gloves etc.) SAPMT
Clean Rods
(follow-up)
9.
1. Handling Cement CAT/ Operation
1. PPE (Gloves, safety shoes & Goggle). Fresh water available
Backfill Holes 2. Open Bentonite pit SAPMT
2. Cover overnight. Warning tape MSDS sheet should be on site.
(follow-up)
10.
CAT/ Operation
Transport to and from site 1. Road accident
1. Observe speed limits, Wear seat belts, No seat belt no ride SAPMT
(people)
(follow-up)
1 All site personnel are required to wear PPE/ such as safety helmet, safety glasses, gloves, and safety shoes. CAT
3 Explain to key personnel the purpose of the JSA and enforce the implementation of content. CAT
4 Use the JSA to identify hazards and list the precautions on the work permit. CAT
If an injury or near miss occurs, the JSA shall be reviewed immediately to determine whether changes are
6 CAT & SAPMT
needed in the job procedures.