The document outlines the process steps for various operations on a train system including initialization, peripheral testing, ALG testing, pulsing different components, charging systems, and shutting down. It provides low level commands and wait conditions for each step in the processes.
The document outlines the process steps for various operations on a train system including initialization, peripheral testing, ALG testing, pulsing different components, charging systems, and shutting down. It provides low level commands and wait conditions for each step in the processes.
The document outlines the process steps for various operations on a train system including initialization, peripheral testing, ALG testing, pulsing different components, charging systems, and shutting down. It provides low level commands and wait conditions for each step in the processes.
Initialisierung Release pulsing 01 Start Init. 01 Start release pulsing 30 04 Wait for MVB-Comm. 04 Wait for release pulsing 01 07 Command ALG to 2020H 99 Wait for FLG node 594 10 Command ALG to 1F1FH Pulsing of NSC 99 Wait for FLG node 010 01 Start pulsing of NSC Pheriphery Test 31 04 Command NSC pulsing 01 Start PeriTest 07 Wait for UDC-link> 95% 04 Analog Test Yes or no? 99 Wait for FLG node 596 07 Test UA B514 (1) Pulsing of ASC 10 Test UA B514 (2) 01 Start pulsing of ASC 02 13 Binary Test Yes or no? 04 Wait for release fluxing 16 Test UR B177 32 07 Fluxing ASC 19 SAP Test Yes or no? 10 Wait for torque demand 22 Test SAP1 13 Brake 99 Wait for FLG node 310/320 16 Drive ALG Test1 Charge again DC-link 01 Start ALG Test1 01 Start Charge again DC-link 04 Wait for Uline = 0V 04 Command ALG to B0B0H 10 07 Command ALG to 2626H 60 07 Charge switch on 10 Command ALG to 2020H 10 Line switch off 13 Repeat Test Yes or no? 13 Command HV release 99 Wait for FLG node 321 99 End charge again DC-link ALG Test2 Shut down 01 Start ALG Test2 01 Start shut down 07 Command ALG to 4040H 02 Charge switch off 10 ALG Test2 Yes or no? 03 Line switch off 13 ASC-Fsp-Test Yes or no? 04 Entsch. ALG B0 ? 16 Command ALG to 4242H 05 Command ALG to B0B0H 19 Command ALG to 4040H 70 07 Command ALG to 5050H 12 22 NAC-Fsp Test Yes or no? 10 Wait for DC-link empty 25 Command ALG to 4444H 19 Switch off GUSP 28 Command ALG to 4040H 22 Entsch. ALG 20 31 GUSP wait-T Yes or no ? 25 PTO-line off 34 Command ALG to 4646H 28 Command ALG to 2020H 37 Command ALG to 4040H 99 Wait for FLG node 612 40 Command ALG to 5050H Protective turn off 99 Wait for FLG node 390 01 Start PTO 13 Passif 04 Wait for ALG 72H 19 ALG ready 07 Wait for DC-link empty Closing of PTO line 10 Acknowledge PTO 01 Start close PTO-line 13 PTO-line off 80 04 Wait for HS on 16 Charge switch off 07 Close PTO-line Yes or no? 19 Line switch off 20 10 Close PTO-line 22 Wait forn no PTO 13 Wait for Ubatt>Min 28 Command ALG to 4040H 16 Wait for MUB Cold 31 Command ALG to 5050H 99 Wait for FLG node 580/581 99 End PTO Switch-on GUSP 97 Passif 01 Start GUSP on 98 Passif 21 04 Switch GUSP on Switch off Bogie 07 Command ALG to B0B0H 01 Start Switch off bogie 99 Wait for FLG node 583 04 Charge switch off Charge DC-link 07 Line switch off 99 01 Start Charge DC-link 08 Command ALG to B0B0H 22 04 Charge switch on 09 Command ALG to 5050H 07 Wait for DC-link charged 10 Switch off GUSP 99 Wait for FLG node 584/585 13 End switch off bogie Switch on Line switch 01 Start switch on line switch 04 Close Line switch 07 Charge switch off 23 10 MUB-Test Yes or no ? 13 Wait for release MUB-Test 16 Command MUB-Test 19 Command ALG to B2B2H 99 Wait for FLG node 587