Shakthiman Equipments Pvt Ltd

Startup Check Sheet


Operation No:100 Operation Name: Punching Zone Responsibility: Month:
SlNo Check Points Specfication Method 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Cleaning
Ensure
1 cleanliness of _
Working Place

Availability of
Safety
2 Safety Shoes,Gean Apron,
Gloves, Goggle
Equipment

Ensure the
3 availability of Working condition
Fork lift

Ensure the
4 availability of _
palletes

Ensure the
availability of
5 Good Condition
Equipment

suitable rope
and D shackles

Ensure the
availability of X Good Condition
- gauge block

Ensure the
availability of Good Condition
clamp

Ensure the Rings & Double hand


Spanners, Ratchet,
6 Availability of Screw driver,
Required Tools
Alenkey set.

Ensure the With respective


Availability of clearance of sheets
7
Suitable Dies 0.2mm,0.4mm,0.6m
and punches m,1mm
Tools

Ensure the
8 availability of Flattened file, Round
head file
Deburring tools

Check the
9 Availability Green Or Blue
Paint Marker

Operator Signature:

Production Supervisor Signature


Note:

Available Not availble

SEPL - PD - SCS - 094 REV-00 ISSUE DATE : 06-10-19


Remarks:

SEPL - PD - SCS - 094 REV-00 ISSUE DATE : 06-10-19


Shakthiman Equipments Pvt Ltd
Startup Check Sheet
Operation No:110 Operation Name: Bending Zone Responsibility: Month:
SlNo Check Points Specfication Method 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Cleaning
Ensure
1 cleanliness of _
Working Place

Availability of

Safety
Shoes,Gean Apron,
2 Safety
Equipment Gloves, Goggle

Ensure the
3 availability of Working condition
Movable
Trolleys
Equipment

Ensure the
4 availability of _
palletes

Ensure the Vernier


5 Availability of caliper,measuring
measuring Tape,Square,Bevel
instrument protractor

Ensure the metal & rubber


Tools

6 Availability of hammer, Ratchet,


Required Tools Spaner, Alenkey set.

Check the
7 Availability Red Or Green
Paint Marker

Ensure the
With respective
8 Availability of Sheet thickness
Suitable Dies
and punches 8V,12V,16V,24V

9 check the with respective to


stopper value Die

Operator Signature:

Production Supervisor Signature


Note: Stopper Standard value: Die sequance distance b/w stoper die
8v 10 42.60
12v 12 42.1

16v 15 54.5
25v 20 54.6

Available Not availble

SEPL - PD - SCS - 094 REV-01 ISSUE DATE : 06-10-19


Shakthiman Equipments Pvt Ltd
Startup Check Sheet
Operation No:120 Operation Name: Shearing Zone Responsibility: Month:
SlNo Check Points Specfication Method 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Cleaning

Ensure
1 cleanliness of _
Working Place

Availability of
Safety

2 Safety Shoes,Gean Apron,


Equipment Gloves, Goggle

Ensure the
availability of
3 Movable Working condition
Equipment

Trolleys

Ensure the
4 availability of _
palletes

Ensure the Measuring Tape,


5 Availability of Vernier Caliper,
measuring Square,bevel
instrument protector.
Tools

Ensure the
6 availability of Flattened file
tools

Check the
7 Availability Red Or Green
Paint Marker

Operator Signature:

Production Supervisor Signature


Note:

Available Not availble

SEPL - PD - SCS - 094 REV-00 ISSUE DATE : 06-10-19