Quality Control Checklist - Temporary Fencing
Quality Control Checklist - Temporary Fencing
Other reference documentation: SANS- 1373, 675 & 121; CKS 146; CKS 82 + P2W-4021-CMS-0003-02 - Fencing Method Statement
C.1 - Setting out: 1. Setting out of fencing line: Survey Report No.:
1.1 Site clearance (0.5m outside & 10m inside fence line) OK / NOK
2. Setting out of posts (incl. corner & strain): Survey Report No.:
3. Setting out of intermediate standards: Set out on site: OK / NOK
4. Final alignment check of posts and standards before erection OK / NOK
C.2 - Erection. 1. Excavation for posts / intermediate standards (hole size, depth) OK / NOK
2. Placement (post height above ground, plumbness, alignment, etc.) OK / NOK
3. Concreting (where applicable)
3.1 Mix design approved (C30) OK / NOK
3.2 Sufficient concrete material available OK / NOK
3.3 Mixer inspected and operational OK / NOK
3.4 Scale available for weight batching OK / NOK
3.5 Concrete mixing and placement OK / NOK
3.6 Final check on post position post pour OK / NOK
4. Backfilling
4.1 Compacted for where required (standards) OK / NOK
5. Rock embedment
5.1 In accordance with CMS-0003-02 OK / NOK
6. Straining wires:
6.1 Concrete min 7 days old OK / NOK
6.2 Wire length checked - per section OK / NOK
6.3 Wire position wrt standards OK / NOK
6.4 Wire tensioning & sequence (bottom up) OK / NOK
7. Diamond mesh
7.1 Unrolling (vertical) OK / NOK
7.2 Tying of mesh to straining wires (correct intervals) OK / NOK