CDPL-PMC-AR-NCR-0021 Non-Conformity Notification For Section 1 Aridod. 30.07.2022

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
Transportation of Oil Through Pipeline from Chattogram to Dhaka (CDPL), Bangladesh Non-conformity Notification ARIDOD Section-1 No.: CDPL-PMC-AR-NCR-0021 To: ARIDOD. The following non-conformity items have been confirmed after inspection, Proper rectification of these non-conformities must be taken according to the requirements of this notice. The result of rectification should ’be submitted to PMC in the form of photographs on 2022/07/30(¥/M/D). Content of non-conformity items: 1. Blocking highway road Rectification requirement: For your information t at Section-1 ‘TP 98 last night, ARIDOD has dug trenches and placed them on the side of the road in such a way that two vehicles cannot pass side by side on that road and there isa risk of a major accident at any moment. Also they didn’t used any safety cone and caution tape beside the trench and there we didn't found any safety personnel, who can warn the pedestrians and the vehicles running on the highway about safety. Also, no safety sign boards besides the trench. Especially at night heavy vehicles are running at high speed that have possibility of serious accidents, It needs to take immediate steps to solve this problem, I ] nl T Transportation of Oil Through Pipeline from Chattogram to Dhaka | (CDPL), Bangladesh apes Non-conformity Notification PMC Headquarters ( Sectional Di July ctor: Fang Ming Date: 3

You might also like