Rate Amount
Sl No. Description UOM Quantity Remarks
(INR) (INR)
2.2 Extra for every additional lift of 1.5m or part thereof in Reference-
excavation/banking excavated or stacked materials. Cum 104.50 0.34 35.11 DSR-2021, Vol-1,
2.26.1 All Kinds of Soil. Code No. 2.26.1
Page 1 of 31
ABSTRACT
Rate Amount
Sl No. Description UOM Quantity Remarks
(INR) (INR)
4.2 5.33.2 All work above plinth level upto floor-v level
Cum 10306.20 93.49 963480.26
Page 2 of 31
ABSTRACT
Rate Amount
Sl No. Description UOM Quantity Remarks
(INR) (INR)
5.9.3 Suspended floors, roofs, landings, balconies and access Reference - DSR-2021,
platform Sqm. 766.55 243.84 186915.55
Vol-1, Code No 5.9.3
5.9.5 Lintels, beams, plinth beams, girders, bressumers and
cantilevers Sqm. 608.35 480.40 292251.34 Reference - DSR-2021,
Vol-1, Code No 5.9.5
5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts
Sqm. 804.25 545.60 438798.80 Reference - DSR-2021,
Vol-1, Code No 5.9.6
5.9.7 Stairs, (excluding landings) except spiral-staircases Reference - DSR-2021,
Sqm. 657.75 18.00 11839.50 Vol-1, Code No 5.9.7
5.9.16 Edges of slabs and breaks in floors and wall
5.9.19 Weather shade, Chajjas, corbels etc., including edges Reference - DSR-2021,
Sqm. 766.75 26.64 20426.22
Vol-1, Code No 5.9.19
Extra for additional height in centering, shuttering where ever
required with adequate bracing, propping etc., including cost of
de-shuttering and decentering at all levels, over a height of 3.5
5.2 m, for every additional height of 1 metre or part thereof (Plan
area to be measured).
Page 3 of 31
ABSTRACT
Rate Amount
Sl No. Description UOM Quantity Remarks
(INR) (INR)
6.1 Providing & fixing double Scaffolding system (Cup lock type) on
the upto exterior side, upto seven story hight made with 40mm
dia MS tube 1.5 meter center to center, Vertical & horizontal tube
joining with cup & lock system with MS tube, MS tube challies,
MS clamps & MS staircase system in the scaffolding for working
platform etc. maintaining it in a serviceable condition for the
required condition as approved and removing it there after. The
scaffolding system shall be stiffened with bracing, Runneres
connection with the building etc, wherever required for inspection Reference- DSR-2021,
of work at required location with essential safety features for sqm. 285.00 1921.20 547542.00
Vol-2, Code No 14.72
workmen etc. complete as per direction & approval Engineer- in-
charge. The elevational area of scaffolding shall be measured for
the payment purpose. The payment will be made once
irrespective dration of scaffolding.
Page 4 of 31
ABSTRACT
Rate Amount
Sl No. Description UOM Quantity Remarks
(INR) (INR)
9.0 Plaster
9.1 12mm Cement Plaster of mix
Reference - DSR-2019,
Sqm. 276.15 1770.36 488884.91
Vol-2, Code No 13.4.1
13.4.1 1:4 (1Cement : 4 coarse Sand)
10.0 Structural steel work
10.1 Structural steel work in single section with or without connecting
plate, including cutting, hoisting, fixing in position and applying a Reference -DSR-2021,
priming coat of approved steel primer all complete. Kg 111.95 11736.00 1313845.20
Vol-1, Code No 10.2
Page 5 of 31
ABSTRACT
Rate Amount
Sl No. Description UOM Quantity Remarks
(INR) (INR)
12.0 Paint
12.1 White washing with lime to give an even shade : Reference - DSR-2021,
13.37.1 New work (three or more coats) Sqm 32.45 1761.36 57156.13
Vol-2, Code No 13.37.1
Page 6 of 31
ABSTRACT
Rate Amount
Sl No. Description UOM Quantity Remarks
(INR) (INR)
13.0 Flooring
13.1 Marble stone flooring with 18 mm thick marble stone, as per
sample of marble approved by Engineer-in-charge, over 20 mm
(average) thick base of cement mortar 1:4 (1 cement : 4 coarse
sand) laid and jointed with grey cement slurry, including rubbing Reference - DSR-2021,
and polishing complete with : Sqm 3377.45 876.40 2959997.18
Vol-1, Code No 11.23.1
11.23.1 Makrana white second quality
Page 7 of 31
ABSTRACT
Rate Amount
Sl No. Description UOM Quantity Remarks
(INR) (INR)
15.0 Providing and fixing false ceiling at all height including providing and
fixing of frame work made of special sections, power pressed from
M.S. sheets and galvanized with zinc coating of 120 gms/sqm (both
side inclusive) as per IS : 277 and consisting of angle cleats of size 25
mm wide x 1.6 mm thick with flanges of 27 mm and 37mm, at 1200
mm centre to centre, one flange fixed to the ceiling with dash fastener
12.5 mm dia x 50mm long with 6mm dia bolts, other flange of cleat
fixed to the angle hangers of 25x10x0.50 mm of required length with
nuts & bolts of required size and other end of angle hanger fixed with
12.45.1
intermediate12.5
G.I.mm thick45x15x0.9
channels taperedmm edge gypsum
running plain board
at the spacing of
conforming to IS: 2095- (Part I) : 2011 (Board
1200 mm centre to centre, to which the ceiling section 0.5 mm with BIS
thick Reference - DSR-2021,
Sqm 1145.95 720.00 825084.00
certification
bottom wedge marks)
of 80 mm with tapered flanges of 26 mm each having Vol-1, Code No 12.45.1
lips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a
direction perpendicular to G.I. intermediate channel with connecting
clips made out of 2.64 mm dia x 230 mm long G.I. wire at every Sub Total (INR) 13,157,215
junction, including fixing perimeter channels 0.5 mm thick 27 mm high
having flanges of 20 mm and 30 mm long, the perimeter of ceiling
fixed to wall/partition with the help of rawl plugs at 450 mm centre,
with 25mm long dry wall screws @ 230 mm interval, including fixing of
Overhead @ 15% 1,973,582
gypsum board to ceiling section and perimeter channel with the help
of dry wall screws of size 3.5 x 25 mm at 230 mm c/c, including
jointing and finishing to a flush finish of tapered and square edges of
Grand Total (INR) 15,130,797
the board with recommended jointing compound , jointing tapes ,
finishing with jointing compound in 3 layers covering upto 150 mm on
both sides of joint and two coats of primer suitable for board, all as
per manufacturer's specification and also including the cost of making
openings for light fittings, grills, diffusers, cutouts made with frame of
perimeter channels suitably fixed, all complete as per drawings,
specification and direction of the Engineer in Charge but excluding the
cost of painting with
Page 8 of 31
Name of the Project :
QUANTITY
1.0 EARTHWORK - QUANTITY
Sl. No. Description No. Length Width Depth Quantity Remarks
(m) (m) (m) (Cum)
1.1 EARTH WORK IN EXCAVATION
Refer the foundation drawing
Excavation - from 0 to 1.5 m depth
Total 220.20
Name of the Project : Construction of Kuingai Baptist Church
QUANTITY
Total 169.70
Name of the Project : Construction of Kuingai Baptist Church
QUANTITY
3. PCC M15 GRADE
TOTAL 70.23
Name of the Project : Construction of Kuingai Baptist Church
QUANTITY
4.0 - RCC M25 GRADE
a Footing
b Plinth Beam -
c Column -
a Column
b Tie Beam -
c Roof Beam -
d Slab -
QUANTITY
5.0 - SHUTTERING WORK
Total 19.31
Total 73.02
Total 79.00
4 Shuttering (Mid Tie Beam)
Total 132.60
Total 134.40
6 Shuttering (Slab)
7 Shuttering (column)
Total 26.64
9 Stairs
Base Sqm 2 1.00 5.00 1.50 15.00
Sides Sqm 2 2.00 5.00 0.15 3.00
Total 18.00
Total 321.72
1430.13
Name of the Project : Construction of Kuingai Baptist Church
QUANTITY
QUANTITY
8.0 - BRICK WORK
Depth/
Sl No. Description Unit Nos Length Height Thickness Quantity Remarks
Deduction
QUANTITY
9.0 - PLASTER
Sl No. Description Unit Nos Set Length Depth/ Height Quantity Remarks
Deduction
QUANTITY
10.0 - Structural Steel
Plan area Unit Weight
Structural Steel works Unit Nos. Length Width
(sqm) (kg/sqm)
Weight Remarks
Total 11736.00
QUANTITY
12.0 - PAINT
Sl No. Description Unit Nos Set Length Depth/ Height Quantity Remarks
Deduction
QUANTITY
13.0 - FLOORING
13.1
Description UoM Length Breadth Quantity
QUANTITY
14.0 - Roofing
Description UoM Nos. Length Breadth Quantity
QUANTITY
Total 720.00
LIST OF MATERIALS REQUIRED FOR CONSTRUCTION OF CHURCH
(FOR BUDGET PURPOSE)
Ratio 1 2 4
Concrete volume=1.54m3
PCC
Ratio 1 2 4
Concrete volume=1.54m3
RCC 147.09
Plastering
Area= 1 m2
Thickness= 0.012
Volume= 0.01
Sand 0.01296
22.9438656 23
1550Kg/m3 Aggregates
1550Kg/m3 Aggregates
230mm*110mm*70mm
0.001771