Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

X | CROCHETEZ RIPPLE BLANKET | CRAFT

CRAFT I SKILL LEVEL : INTERMEDIATE

MEASUREMENTS working yarn up through next


Approx 55" x 65" [139.5 x 165 cm] 5 loops of foundation row to
create 5 knit sts. Pull next 3 loops
GAUGE from working yarn all up through
5 sts = 4" [10 cm]. next loop to increase 2 knit sts. Pull
next 5 loops from working yarn
INSTRUCTIONS through next 5 loops of foundation
Stripe Pattern row to create 5 knit sts. Pull
*With A, 5 rows. next loop up through all next
With B, 5 rows. 3 loops together to decrease
With C, 5 rows. 2 knit sts. Repeat from * until last
Repeat from * 3 times more. 13 loops. Pull next 5 loops from
With A, 5 rows. working yarn up through next
These 65 rows complete Stripe 5 loops of foundation row to
Pattern. create 5 knit sts. Pull next loop
up through all next 3 loops
Note: Right side of project is together to increase 2 knit sts.
facing at all times. Do not turn Pull next 5 loops from working
work at end of rows. yarn up through next 5 loops of
foundation row to create 5 knit
With A, count 85 loops for sts. Pull next loop up through
MATERIALS foundation row (noting yarn end is both of last 2 loops together to
Bernat® Alize Blanket-EZ™ (6.4 oz/180 g; 18 yds/16 m) at far right and all loops are facing decrease 1 knit st. Do not turn work.
Contrast A Mauve (37016) 3 balls upwards). 85 sts in row.
Contrast B Slate Grays (37024) 3 balls 1st row: Working from left to right, 2nd row: Working from right to
Contrast C Cream (37013) 3 balls with working yarn in back, pull the left, with working yarn in back,
86th loop (from ‘working yarn’) pull next loop from working yarn
ABBREVIATIONS up through both 85th and 84th up through both of next 2 sts
Approx = Approximately St(s) = Stitch(es) loops (last 2 loops of foundation together – K2tog made (1 st
K2(3)tog = Knit next 2(3) stitches row) from behind to decrease 1 decreased). *Pull next 5 loops from
together knit stitch. *Pull next 5 loops from working yarn up through next
SKU
BRN0502-013703M
# EZ RIPPLE BLANKET
X | CROCHET
| CRAFT 1 of X
2
X | CROCHETEZ RIPPLE BLANKET | CRAFT

5 sts. Pull next 3 loops from working Bind off row: Working from
yarn all up through next st – right to left, pull 2nd st through
Double increase made. Pull next first st. Pull 3rd st through 2nd
5 loops from working yarn up st. Pull 4th st through 3rd st.
through next 5 sts. Pull next loop Continue in this manner to end of
up through all next 3 sts together row. Cut last loop to create yarn ‘tail’.
– K3tog made (2 sts decreased). Tie to secure and weave in ends.
Repeat from * until last 13 sts. Pull
next 5 loops from working yarn up
through next 5 sts. Double increase
in next st. Pull next 5 loops from
working yarn up through next 5 sts.
K2tog. Do not turn.
3rd row: Working from left to
right, K2tog. *Pull next 5 loops
from working yarn up through
next 5 sts. Double increase in next
st. Pull next 5 loops from working
yarn up through next 5 sts. K3tog.
Repeat from * until last 13 sts.
Pull next 5 loops from working
yarn up through next 5 sts. Double
increase in next st. Pull next 5 loops
from working yarn up through next
5 sts. K2tog. Do not turn.
First 3 rows of Stripe Pattern
complete.
Repeat 2nd and 3rd rows until
all 65 rows of Stripe Pattern are
complete.

SKU
BRN0502-013703M
# EZ RIPPLE BLANKET
X | CROCHET
| CRAFT 2
1 of X
2

You might also like