SAP Project Systems - Configuration Document

Page 2
of 17
Configuration Document

Author Mr. Pranav Goel

File Name Configuration Document of Project Systems

Created 02.08.2021

Last Edited 02.08.2021

Number Of Pages

Configuration Client 050

Target Readership

Sign

Author/
Version Revision Revision Sign-Off
Date Description Process Owner

V0 02.08.2021 Initial Version

Page 3
of 17
Configuration Document

This document has to read in conjunction with the KDS document

Page 4
of 17
Configuration Document

INDEX

1 Purpose...............................................................................6
2 Configuration........................................................................6
3 Preparation..........................................................................6
3.1 Prerequisites...............................................................................6
4 Project Systems Configuration..................................................6
4.1 Define Special Characters for Projects................................................7
5 Annexure.............................................................................7

Page 5
of 17
Configuration Document

1 Purpose
This document captures in detail the steps required to configure the SAP system to
meet the business requirements as envisaged in the CLIENT’s Business Process
Documents as documented in the Business Blueprint phase. The configuration steps
have mappings to the corresponding menu path where the configuration has been
done in the IMG (Implementation Guide). The descriptive procedure along with
rationale of all configurations is also provided.

The documentation provides visibility to all project teams members on the system
settings and changes. This is very important due to the highly integrated nature of
SAP. All future changes or updates to the system should be done based on this
document and the documentation updated accordingly.

This customization manual outlines the way, how the Project System Module has
been configured for CLIENT as per the requirement of their business scenarios and
should be seen in conjunction with the document.

This document explains the settings done i.e. Configurations done for the present
implementation only and not all the nodes available.

Other Nodes are kept as standard (as delivered by SAP).

2 Configuration

Use

In this step, all the Customizing settings are done in the development client i.e.
050.

3 Preparation

Page 6
of 17
Configuration Document

.1 Prerequisites
 CLIENT’s Organizational Structure Configuration

4 Project Systems Configuration

.2 Define Special Characters for Projects


Use

To define coding masks in Customizing, you must first enter several settings in
customizing activity ‘Define Special Characters for Projects’. This configuration
setting enables to define the Special Characters in Project Number and length of
the coding mask.

Following setting are maintained through this setting.

1. Length of the key for the coding mask.


2. To specify whether the key for coding the project definition and WBS
elements must always have exactly the same length as the one you defined.
3. Entry tool special character for to simplify the tabular creation of WBS
elements.
4. Special characters to use as separators between two sections when defining
the coding mask
5. Edit Indicator to determine that only coded project numbers may be used
within the Project System.
6. Automatic number assignment field to specify that numbers for new WBS
elements are to be assigned by the system.

Page 7
of 17
Configuration Document

5 Annexure

Plant codes:

Plant Description

1000 HEAD OFFICE

1001 OGNAJ

1002 MUMBAI OFFICE

1003 DELHI OFFICE

1021 AMBALA KAITHAL

1022 AMLOHRI-NCL

1023 ANANTPUR

1024 ANANTPUR PACK-2

1025 ANANTPUR PACK-3

1026 ANANTPUR PACK-52

1027 ANANTPUR PACK-53

1028 ANANTPUR PACK-8

1029 AURANGABAD JALNA

Page 8
of 17
Configuration Document

1030 BADMER (KAPURDI) - SWML

1031 BAHUTI CANAL

1032 BANDUHURANG-UCIL

1033 BHANPURA CANAL

1034 BHAVNAGAR-TALAJA

1035 BHILWARA RAJSAMAND

1036 BLBC - ANANDAPUR - ODISHA

1037 DHANBAD (BASANTI MATA)-BCCL

1038 DHANBAD (DHANSAR)-BCCL

1039 DHANBAD (KATRAS)-BCCL

1040 DHANBAD (KUSUNDA)-BCCL

DHANDHUKA (VALLABHIPUR- BR.


1041 CANAL)

1042 DMRC - 47 (DELHI)

1043 DMRC - CC 43 (HARYANA)

1044 DMRC - CC 57 (BAHADURGARH)

1045 EP EXPRESS PACK 1 - HARYANA

1046 EP EXPRESS PACK 1 - UP

1047 EP EXPRESS PACK 2 - UP

Page 9
of 17
Configuration Document

1048 GAURAVELLY

1049 HALON-DAM (MP)

1050 JODHPUR PACHAPADRA

1051 KBC PACK-IR2 (ADIPUR)

1052 KBC PACK-IR3 (ADIPUR)

1053 KBC PACK-IR4 (ADIPUR)

1054 KBC PACK-IR8 (ADIPUR)

1055 KODIMAL

1056 MANAGULI DEVAPARA

1057 MBCP - BEDIKIPADA (SEL)

1058 MBCP - CHORWAD (SEL)

1059 MBCP - DEORI (SEL)

1060 MBCP - HEAD OFFICE (SEL)

1061 MBCP - INSULI (SEL)

1062 MBCP - KAGAL (SEL)

1063 MBCP - MARWADE (SEL)

1064 MBCP - PIMPALKUTTI (SEL)

1065 MBCP - RAJORA (SEL)

Page 10
of 17
Configuration Document

1066 MBCP - SAWNER (SEL)

1067 MBCP - SINOLI (SEL)

1068 MORBI CANAL

1069 MYSORE - BELLARY

1070 NARASINGHPUR

1071 NATHDWARA

1072 NMC PACK-7 (GANDHINAGAR)

1073 OMKAR (SEL-GKC-JV-I)

1074 OMKAR (SEL-GKC-JV-II)

1075 OMKARESHWARE CANAL

1076 PANCHKULA (YAMUNA PKG-2)

1077 RADHANPUR - MANPUR

1078 RAMPUR-KATHGODAM PACK-1 (UP)

1079 RAMPUR-KATHGODAM PACK-2 (UK)

1080 RANCHI (SEL-GKC-JV)

1081 ROHTAK HISSAR

1082 SEL-PIPL JV- BHATINDA

1083 SEONI

Page 11
of 17
Configuration Document

1084 SHAPAR VERAVAL

1085 UNA-KODINAR

1086 VIZAG

1087 WIND FARM PROJECT

1088 YAMUNANAGAR (PKG-1)

1089 MBCP - ACCHAD (SEL)

1090 MBCP - DEGLOOR (SEL)

1091 MBCP - WARUD (SEL)

1092 MBCP - RAJURA (SEL)

1093 MBCP - KELVAD (SEL)

1094 MBCP - PETH (SEL)

1095 CHHINDWADA

1096 BRT TIGER RESERVE

2000 SIPL-HEAD OFFICE

2021 SIPL-AHMEDABAD RING ROAD

2022 SIPL-AURANGABAD JALNA

2023 SIPL-NAGPUR SEONI

2024 SIPL-MAHARASHTRA BORDER

Page 12
of 17
Configuration Document

2025 SIPL-BIJAPUR HUNGUND

2026 SIPL-HYDERABAD YADGIRI

2027 SIPL-ROHTAK PANIPAT

2028 SIPL-SHREENATHJI UDAIPUR

2029 SIPL-BHILWARA RAJSAMAND

2030 SIPL-ROHTAK HISSAR

2031 SIPL-DHULE PALESNAR

2032 SIPL-MYSORE BELLARY

2033 SIPL-SADBHAV RUDRAPUR

2034 SIPL-SADBHAV NAINITAL

2035 SIPL-SADBHAV UNA

2036 SIPL-SADBHAV BHAVNAGAR

2037 SIPL-SADBHAV BANGALORE

2038 SIPL-ACHHAD

2039 SIPL-AKKALKUVA

2040 SIPL-BEDIKIPADA(NAVAPUR)

2041 SIPL-BILLOLI

2042 SIPL-BORGAO

Page 13
of 17
Configuration Document

2043 SIPL-CENTRAL CONTROL ROOM

2044 SIPL-CHORWAD

2045 SIPL-DEGLOOR

2046 SIPL-DEORI

2047 SIPL-HADAKHEDA

2048 SIPL-INSULI

2049 SIPL-KAGAL

2050 SIPL-KHARPI

2051 SIPL-MANDRUP

2052 SIPL-RAMTEK(MANEGAO)

2053 SIPL-MARAWADE

2054 SIPL-OMERGA

2055 SIPL-PIMPALKUTTI

2056 SIPL-PUMAD(MUKTAINAGAR)

2057 SIPL-RAJORA

2058 SIPL-SAWNER

2059 SIPL-SINOLI(CHANDGARH)

2060 SIPL-WARUD

Page 14
of 17
Configuration Document

2061 SIPL-KELOD

2062 SIPL-PENTH

3000 MBCPNL-HEADOFFICE

3011 MBCPNL-ACHHAD

3012 MBCPNL-AKKALKUVA

3013 MBCPNL-BEDIKIPADA(NAVAPUR)

3014 MBCPNL-BILLOLI

3015 MBCPNL- BORGAON

3016 MBCPNL-CENTRAL CONTROL ROOM

3017 MBCPNL-CHORWAD

3018 MBCPNL-DEGLOOR

3019 MBCPNL-DEORI

3020 MBCPNL-HADAKHEDA

3021 MBCPNL-INSULI

3022 MBCPNL-KAGAL

3023 MBCPNL-KHARPI

3024 MBCPNL-MANDRUP

3025 MBCPNL-RAMTEK(MANEGAO)

Page 15
of 17
Configuration Document

3026 MBCPNL-MARARWADE

3027 MBCPNL-OMERGA

3028 MBCPNL-PIMPALKUTTI

3029 MBCPNL-PUMAD(MUKTAINAGAR)

3030 MBCPNL-RAJORA

3031 MBCPNL-SAWNER

3032 MBCPNL-SINOLI(CHANDGARH)

3033 MBCPNL-WARUD

3034 MBCPNL-KELOD

3035 MBCPNL-PENTH

4006 ARRIL

4026 AJTL

4046 BRTPL

4066 BHTPL

4086 HYTPL

4106 NSEWL

4126 RHTPL

4146 RPTPL

Page 16
of 17
Configuration Document

4166 SUTPL

4186 MBHPL

4206 DPTL

4226 SRHPL

4246 SNHPL

4266 SUHPL

4286 SBHPL

4306 SBNHPL

Page 17
of 17