SCOPE:

This Procedure describes and defines in Hazard Identification Plan the minimum mandatory requirements
for the demolition of existing Dining Facility as per contractual requirement, to comply with the applicable
Saudi Aramco Safety Instruction Manual and Standard Procedures.

OBJECTIVE:

To be able to demolish the old dining building as required by the scope of work, reinstate the area in
compliance with Schedule “B”of contract and as per project plan and safety requirements.

GENERAL:

Numerous factors must be taken into account before the method of demolition is decided. Of prime
importance are the age of the structure, the method of construction, the state of preservation, its previous
use, and the surrounding environment. These factors must be known before any planning can begin.

Many problems are peculiar to the demolition of structures, ancillary pipe and electrical works associated
with the building. For instance, many serious accidents have resulted when due consideration was not given
to the shutting down of supplied power line to the building before work began.

INSTRUCTIONS AND STANDARDS

Saudi Aramco General Instructions:

GI 2.100 Work Permit System


GI 2.711 Fire and Safety Watch
GI 6.012 Isolation, Lockout And Use of Hold Tags
GI 8.001 Safety Requirements for Scaffolds
GI 150.001 Asbestos Regulation

American National Standards Institute:


ANSI A 10.6-83

Safety Requirements for Demolition


ANSI Z 88.2-80

Standard Practice for Respiratory Protection


ANSI Z 117.1-89
ISAM KABBANI & PARTNERS CO.
CONSTRUCTION SERVICES AND MAINTENANCE DIVISION

Site Preparation:

 Initiate a tool box meeting with the demolition team before starts of the work

Demolition Team:

Site Engineer – 1
Safety officer – 1
First Aid personnel – 1
Traffic Signal – 1
Craftsmen (15)

 Obtain work permit from the proponent issuer on site.


 Where areas are required for warning signs and devices shall be installed and flagmen shall be
deployed
 All demolition workers should be provided with and make use of the following protective
equipment:

1 Safety helmet
2 Goggles
3 Heavy duty gloves
4 Appropriate respiratory equipment (whenever necessary to prevent inhalation of dust
and fumes).
5 Safety shoes

Work execution:

 All utility services such as electricity, gas, and water must be shut off and the main supplies
disconnected outside the line of the demolition work must be completely disconnected from
inlet, outlet, and overflow points.

 Adjacent Saudi Aramco facilities or structures such as substation building and associated
equipments transformers and fences shall be protected from demolition debris that can likely
cause hazard. Roads near the demotion area shall be kept clean and safe.

 Barricades must be erected around the work area. Signs bearing the words "Danger - Demolition
in Progress" shall be written readable and clear in English Text.

 Loss prevention and Industrial shall be notified in case of presence of asbestos (if any) and
insulation, to ensure safe procedures are followed. Proper personnel protective equipment and
disposal systems must be utilized. (See Chapter 4 and GI 150.001.)
ISAM KABBANI & PARTNERS CO.
CONSTRUCTION SERVICES AND MAINTENANCE DIVISION

 As work progresses, continuing inspections must be made to detect hazards arising through
unsupported walls or loose material. Immediate steps shall be taken by bracing or by other means
to prevent the premature collapse of the whole or any part of the structure.

 Lateral support should not be removed at any time before starting to demolish it. When a wall
from which support has been removed must be left standing at anytime, including overnight and
off-shift work hours, adequate bracing (guying) must be provided to prevent collapse and to
guard against wind pressures.

 A safe means of access to and egress from all working places must be provided. Work places and
the areas around ladders and stairways must be kept clear of material and debris.

 Nails in timber must be removed or bent over, or the timber must be stacked where it will not be
a source of danger. All glass in windows, doors, partitions, etc. should be completely removed
prior to structural demolition.

 All usable materials shall be recovered and transported to Saudi Aramco designated lay-down
yard by the instruction of Aramco representative. Likewise, materials that are not reusable or
considered waste materials shall be disposed to designated area.