Download as pdf or txt
Download as pdf or txt
You are on page 1of 55

DIGITAL + ENGINEERING

We provide technology
solutions to overcome
your challenges --
together.
Radix
O&G
VALUE
PROPOSITION
Radix is a customer-centric company, we
deliver innovative solutions that support our
customers to provide the ENERGY that moves
the WORLD.
why Radix?
We are a Digital Engineering Company . Innovation is in our DNA.

30 Years of Oil & Gas Domain Expertise Combined with a World


Class Ecosphere of Software Technology Partners

1000+ Employees and Growing. Financial Strength – Owned 70%


by a $2B Caterpillar Dealer.

Services provider with field presence worldwide, we have deep


knowledge of the operations challenges

We have an Extensive Digital Suite which has been Established


Across Multiple Verticals

We work with Best-In-Class Oil & Gas Companies with a Focus on


EHS, Climate Change & Delivering Enabling Financial Impact
OUR Value
PROPOSITION
We provide technology
solutions to overcome We nurture solid
We combine We care about We commit to
your challenges.
Technologies customers’ our customers’ and long-term
Together. relationships
and expertise unique needs success
Radix's
GLOBAL Local Interface
Amsterdam
team houston
Execution Team
Local Interface
Georgetown Local Interface
Radix is prepared to attend
global projects through a team
Singapore
located in Rio de Janeiro,
Houston, Amsterdam,
Singapore
rio de janeiro
Execution Team
and Georgetown.

Execution and Tender Center


Representation Office
+60
AND DEEP-WATER EXPERTS
Brazil is responsible for over 30% of deep-water oil production.
Radix provides services for over 40 FPUs in deep water offshore
Brazil

of Brazil
Oil production.

42
Radix's DeepWater Experience
Radix has 30+ years of experience in Brazilian operations from
Exploration to Production

Extracting insights from data Merged ET / IT/ OT – innovative approach to Optimizing asset operation: EHS and
optimizing reservoir analysis save money and compress schedule Business Perfomance
3D Simulator Reservoir (Petrobras); Concept to Detail Engineering Design Troubleshooting and optimization (Chevron, Modec, SBM,
2D/3D seismic AI modelling (Eneva); (Modec, GEE, Aker); Teekay);
Predictive Models (Shell) ; FEED / FID package (Chevron); Brownfield engineering (Chevron, Equinor);
Regulatory Tropicalization (Teekay); Predictive Maintenance (Petrobras) ;
MAC (Petrobras);

Asset Management and visibility to Addressing operation needs and de- Addressing innovation through structured R&D
the Oil Companies risking startup and handover ANP Projects Management (Petrobras);
Real time Asset Management activities Innovation Challenge (Galp);
(Sondopolis Petrobras); Virtual HAZOP (XOM);
Operations Training Simulator
Specific Applications for drilling (Petrobras);
companies (ETESCO, Asset Digitalization (Chevron);
Halliburton, Ocyan); Data Handover from Operations
- real time and transaction
(Trident);
Digital Engineering
Cloud & FOG Computing
Big Data
Analytics
INDUSTRIAL WIRELESS
System Integration
Augmented Reality
Internet of Things
Simulation
Machine Learning
Cybersecurity
Engineering Technology
Conceptual and Special Studies
Multidisciplinary Capital Engineering (Basic to Detailed Design all disciplines)
Rotating Equipment/critical system special studies
Construction and Commissioning Support

Operation Technology
Conceptual and Consulting Services
Traditional Automation (PLCs, DCSs and SCADA)
IIoT and Instrumentation (Data Gathering)
Industrial Networks and Cyber Security
Machine Learning and AI
Rotating Equipment/critical systems Troubleshooting
System/Application Support

Information Technology
Tailored Software Development
Software Architecture and Platforms
Bid Data and Analytics
Governance A unique
Software Support
Perspective
Radix differentiates by the
combination of ET, OT and IT.

Providing complete solutions from


the physical problems to the
functional system.
KEY COMPONENTS FOR RADIX DIFFERENTIATION

Company Strength
Project Team Qualification &
In-country robust
Methodology Value Improved
structure Formal employees' Practices (VIP) Feedback Expertise
policies ISO
Continuous grow and Cost Focus
Best company to work Construction
investors support Knowledge
for in Brazil
Management Constructability
Stablished partner of Operation
Fast Mobilization and
several companies
scalability plan Standards
Special Studies
The “Go To” Subject Internal & External in House Maintenance
Matter Expert in FPSOs Consultants Documentation
Methodology
IPA / FEL METHODOLOGY

Brownfield
Engineering

RADIX has experience with the production processes, FEL (Front End Loading) design methodology,
constructability analysis, support to construction, commissioning, and operational technical assistance.
The competence and experience includes feasibility and conceptual development, FEED, EPC, hook-up,
completion and operation & maintenance support.
Non-exhaustive
M A I N P R O J E C T A C T I V IT I E S

Commissioning/
Conceptual
Feasibility Study Basic Design Detailed Design Construction start-up /
Design
production

•Production •Scope Definitions •Final Main •Final Design & •Site Improvements •Maintenance
Capacity •Site Selection Equipment Engineering •Construction Testing
•Block Flow •Environmental Specifications including auxiliary Mobilization and •Software Testing
Diagrams Assessment •Final P&IDs systems Execution •Operator Testing
•Technology •Heat & Material (Process Systems) •PHA/MOC •Equipment •Trial Runs
Assessment Balances •Environmental •Equipment Installation •Operator Training
•Level of •PFDs Review Procurement •Commissioning •Start-up
Automation •Generic Equipment •Soil Investigation •Constructability Plan Procedures
•Major Equipment Specifications (onshore Projects) review •Maintenance Plan
List •Equipment •Foundation design •Construction
•Material Flow Arrangements (onshore Projects) Planning
Analysis •Plot Plan •Single Line •Building Permits
•Block Layouts Diagrams •Cost of Work
•Operation &
•Expansion Plans Maintenance •Instrument Index Estimate (+10%;-
•Site Planning and Strategy •I/O List 10%)
Logistics options •Value Engineering •Constructability
Studies Analysis
D E T A IL E D D E S I GN W O R K F L O W O V E R V I E W Non-exhaustive
Process
flow Heat and Material
diagrams Balances

Equipment Process
P&ID Fluid List
List Datasheet
C&E Matrix
Instrument Pipe Mechanical
General Vendor data (TBE
LIst Material Datasheet
Plot Plan Workflow)
Class Specs
Equipment
Process General
Sizing and Instrument Piping Connection Equipment Power
Control Arrangeme
Specification Datasheets First Piping Drawing foundation Consumpti
System Routing nt DWG
MTO on
Studies

Instrument
ation & Foundation Electrical
Second
Cable Drawings Loads
Piping MTO
Routing Structure
Instrument Calculation, Electrical
atHook-up Design & MTO Distribution
Piping And Stress Analysis DWG
& MTOs
Support
Electrical
Electrical
cable
Support Piping calculations
layout
Drawings Isometrics
Electrical Electrical
Final Piping equipment wirings
MTO DS

Electrical
MTO
E N G I N E ER I N G R A D I X W O R K IN S T R U C T I O N S

Sharepoint-based system to access standards, templates and work instructions


E N G I N E ER I N G R A D I X W O R K IN S T R U C T I O N S

Nome
IT-RDX-002-004 Instrução para Elaboração de Projetos de Engenharia.docx
IT-RDX-002-005 Instrução de Documentação e Qualidade para Projetos de Engenharia.docx
IT-RDX-002-010 Gestão de Normas de Projetos.docx
IT-RDX-002-019 Classificação de Projetos de Engenharia.docx
IT-RDX-002-020 Emissão de ART e AES.docx
IT-RDX-002-023 Organização e controle dos documentos gerenciais de projetos_PT.docx
IT-RDX-002-024 Instrução para Utilização do GED [Usuário].docx
IT-RDX-002-025 Instrução de Documentação e Qualidade para Documentos de Fornecedor (ADF).docx

https://radixengazure.sharepoint.com/sites/SGI40
K N O W L E D G E M A N A G E ME N T

Knowledge Management

Holds all common knowledge from


Radix.

It´s a bilingual secure platform


(based um sharepoint), divided in
areas/libraries (Radix Business
Units) and disciplines.

This is a living project that started


in May / 2020 and grows every day.
Knowledge management involves
not only the documents libraries,
but also the promotion of lectures,
specific trainings and the incentive
of documentation writing from all
the various Radix Business Units.
K N O W L E D G E M A N A G E ME N T

Each library has video and


reading materials, separated
by subject. Currently, the
Engineering library holds
about 90 documents.
K N O W L E D G E M A N A G E ME N T

So far, Radix University has promoted 6.093 hours of


training for all company.

Of these, 2.284 hours are training for O&G area with the
puporse of emproving performance in Projects.
PROJECT ORGANIZATION CHART
PROJECT MANAGER

TECHNICAL
PMO
COORDINATOR

DOCUMENTATION INTERFACE ENGINEER


SUPPLY TEAM
TEAM

PROCESS INSTRUMENTATION TELECOM ELECTRICAL MECHANICAL/HVAC PIPING STRUCTURE/ARCHITECTURE SAFETY

ADVISOR ADVISOR ADVISOR ADVISOR ADVISOR ADVISOR ADVISOR ADVISOR

ENGINEERS ENGINEERS ENGINEERS ENGINEERS ENGINEERS ENGINEERS ENGINEERS ENGINEERS

DESIGNERS DESIGNERS DESIGNERS DESIGNERS DESIGNERS DESIGNERS ARCHITECTS DESIGNERS

DESIGNERS
TEAM ORGANIZATION STRATEGY
Steering Committee Customer and Radix members

Radix Project Manager

QA/QC Team
Engineering Squads CAD/CAE Horizontal specialists
Interface Manager Teams that support all
Scope of work is divided into Discipline Job Leaders
packages
delivery packages, each of it …
with one project coordinator
assigned as the package leader.
Discipline teams are internally Cross-functional
organized to have specialized Leader Leader Leader Leader
squads formed by
teams working on each of the … multidisciplinary teams
packages simultaneously toward a common goal

Scope 1 Scope 2 Scope 3 Scope N


PROJECT MANAGEMENT WORKFLOW

Five process groups as per PMBOK


standard.
Each of the process groups present
an specific workflow as per
following slides
P R O J E C T I N I T I A T IO N W O R K F L O W

• This process orchestrates the


knowledge transfer between sales team
and Operation team
• Project Manager will receive officially
the project and the approval for the
project Execution and the company
commit on providing the Resources as
per Execution Authorization form
PROJECT PLANNING WORKFLOW

• This process involves important


artifacts such as:
• Kick-off meeting
• Project Plan, containing:
• Document list
• Project schedule
• Risk Plan
• Cost Controls
M A N AG EM E N T O F E X E C U T I O N O F E N G I N E ER I N G P R O J E C T S

• This process comprises the documentation


execution workflows
• Main KPI of this process is the
documentation approval rate by the client.
• Complementary to this procedure, a work
instruction for engineering projects
Execution is available to provide guidelines
to the teams
PROJECT CONTROLS

• Refers to the monitoring of the project


performance according to prevously
defined criteria (described in Project Plan).
• Radix utilizes SAP module Project System
(PS) to monitor physical status of the
projects in comparison with baselines. SAP
is integrated with Power BI to export
dynamic dashboards.
• EDMS is also connected with Power BI to
create a web-based dynamic view of
documentation status for all stakeholders.
Project Performance – Project
Management Dashboards
PROJECT MANAGEMENT DASHBOARD

Mockup screen created


for Mero 4 project based
Radix current controls
M A N AG EM E N T O F C H AN G E

A project change can have


different sources and it is
mandatory immediately
impact evaluation prior to
any decision.
After this careful analysis of
impact and identifying that
the change will affect scope,
schedule and/or cost, a
formal Changer Order is
created.
This form need to be
approved by the
stakeholders involved in the
project and only after this
procedure completed, the
change can be
implemented.
S C H E D U L E M A N A G EM E N T

Activity budget/ Schedule


Activity Activity Activity duration development/
Create project WBS resource
definition sequencing estimating
estimating project baseline
and critical path

Schedule Management is one of the major sources of risk due to the need of concurrent Execution of
engineering, Procurement and Construction, close control of the schedule and risk anticipation is a key
success factor
CONCURRENT EXECUTION
S C H E D U L E M A N A G EM E N T – P R O G R E S S R E P O R T S
Total Project
(Services)

Construction
Engineering
Support During the planning phase of the project the scope of work will
be divided in work packages and the rules of credit for each of
Area 1 Area 2 this packages will be defined, based on the Manpower effort to
execute.
Piping Civil Mechanical Structure
Example of rule of credit for review cycle of Piping documents:

Specs
Rule of credit

Model Step Review Cycle Increment (%) Cumulative (%)


1 Study and design preparation 5% 5%
MTOs 2 Issue for review (IFR) 10% 15%
3 Issue for approval (IFA) 20% 35%
4 Issue for Construction (IFC) 30% 65%
Isometrics
5 Approved for Construction 35% 100%

Drawings
R I S K M A N A G E ME N T

Risk management covers the


identification, assessment,
monitoring, reduction and control of
risks. The outcome is the
identification of preventive actions to
reduce the likelihood of adversity as
well as mitigation actions to reduce
impacts.
The risk register is a live capture of
the risks of the project at that
moment and the steering commitee
meetings can be used to address
high severity risks categorized by the
project risk matrix.
C O M M U N I C AT I O N M A N A G E M E N T

Method of
Description Frequency Audience Owner
Communication
The communication plan
Radix Project
Internal Kick-off meeting One-time event Meeting Radix Project Team enables to effectively
Manager
deliver information to
Project Kick-off meeting One-time event Meeting Radix-SBM Integrated Team
Radix Project appropriate stakeholders.
Manager A correct and well
executed communication
Radix-SBM Integrated Team Radix Interface
Status meetings Weekly Meeting plan is an important
(technical leaders only) Coordinator
mitigation action to the
Project Management Team Radix Planning risks related to Interface
Status Reports Bi-weekly Email
(SBM) Coordinator Management.
Reference Mero 4
Steering Committee Radix Directors and SBM Radix Project
Monthly or bi-monthly Meeting Proposal
Meeting TBD stakeholders Manager

Project Management Team Radix Project


Close-out Meeting One-time event Meeting
(SBM) Manager
Quality Management
System and Continuous
Improving Policy
Quality
Process
Interactions
Document and Quality Control –
EDMS e-clic
DOCUMENT CONTROL
At the start of the project, a specific quality assurance (QA)  Discipline Internal Checks (DIC)
Plan will be developed. Radix corporate QA Manual will be
DIC’s will be performed by checkers from within the
the reference for the development of the specific QA Plan
discipline that generates the design documents. The
to this Project which will describe the relevant applicable
primary purpose of DIC is to ensure that the technical
QA Procedures and any specific project QA requirements,
contents of the design documents are satisfies the
such as:
intended objectives of scope, direction,
 Checking and Inter-discipline Checking completeness, quality requirements and standards.
 Document Flow Control
 Inter-Discipline Checks (IDC)
 Document Filling and Archiving
 Change Control IDC’s will be performed after DIC. The documents to
 HSSE be checked will be routed to the various disciplines
for verification. The primary purpose of the IDC is for
Nome
the disciplines other than the original discipline to
IT-RDX-002-004 Instrução para Elaboração de Projetos de Engenharia.docx verify design compatibility and interfacing with their
IT-RDX-002-005 Instrução de Documentação e Qualidade para Projetos de Engenharia.docx
IT-RDX-002-010 Gestão de Normas de Projetos.docx discipline’s designs. In addition, the IDC chain allows
IT-RDX-002-019 Classificação de Projetos de Engenharia.docx
IT-RDX-002-020 Emissão de ART e AES.docx
for independent views and comments from the other
IT-RDX-002-023 Organização e controle dos documentos gerenciais de projetos_PT.docx disciplines, whether of a technical nature or otherwise
IT-RDX-002-024 Instrução para Utilização do GED [Usuário].docx
IT-RDX-002-025 Instrução de Documentação e Qualidade para Documentos de Fornecedor (ADF).docx
to be made and incorporated.
D I S C IP L IN E I N T E R N A L C H E C K S ( D I C )
DIC’s will be performed by checkers from within the discipline that generates the design documents. The Checker
shall be a separate qualified engineer other than the engineer who has prepared the design document. The primary
purpose of DIC is to ensure that the technical contents of the design documents are satisfying the intended
objectives of scope, direction, completeness, quality requirements and standards.
Doc
DIC
Control
Pipeline
Pipeline
Originator can
be: Approver is a
An engineer or a senior engineer
project designer or manager
Document can be
rejected by the checker
including comments
and remarks
Originator Checker Approver QA/QC
Document
originator execute
the work and Doc control checklist
perform self check  Template
 Title
 Tags
Approver can return the  Workflow
document to the originator to
restart the workfllow
I N T E R- D I S C I P L I N E C H E C K S ( I D C )
IDC’s will be performed after DIC. The documents to be checked will be routed to the various disciplines for
verification. The primary purpose of the IDC is for the disciplines other than the original discipline to verify design
compatibility and interfacing with their discipline’s designs. In addition, the IDC chain allows for independent views
and comments from the other disciplines, whether of a technical nature or otherwise to be made and incorporated.
Repeat until all
Doc disciplines involved
IDC have verified IDC
Control
Pipeline Pipeline
Pipeline Disciplines
identify
previously the
documents
important for
IDC
Provide discipline Provide discipline
comments / remarks comments / remarks
IDC Verifier IDC Verifier Originator
QA/QC
(discipline 1) (discipline 2)
Yes

ID
No
C Client
DO
C? Submission Originator verify all IDC
comments prior to restart the
DIC workflow
DOCUMENT CONTROL
Engineering WF
• Client review cycle
• Client review
Client duration
Documents Approval /
submitted to Comments
client

Vendor documents WF
Engineering
Documents Comments
submission
• Vendor duration to
Comments incorporate the
comments
• Vendor delivery
Client estimation
Documents Vendor
submission
Radix and SBM sustain continuous engagement since 2015. The main focus initially was to support Brazil Fleet
Operations, which became global while the relationship expanded.
In 2020 SBM decided for the first time to develop a ESC (Engineering Sub Contractor) for new builds. Radix was
selected as SBM Global Supplier for new builds and a new Frame Agreement was signed with this purpose.

© SBM Offshore. All rights reserved. www.sbmoffshore.com


Sbm – new builds
Signature April June July August September
of MSA
2021

Almirante Tamandare PO issued by SBM for AT Handover Period in


PO issued by SBM for
FPSO Project – Start of starting AT project. Schiedam – SBM Office
starting Mero 4 project.
Commercial discussions
Mero 4 – Start of
commercial discussions

Project Category Description Size/Weight


Almirante Tamandare Detailed Engineering RADIX is responsible for the detailing engineering project for 6 modules: AT FPSO will produce 225,000 barrel oil
FPSO and 12 million m3 of gas per day.
Discipline - TS043 – Service Crane Support Module
AT Multidisciplinary - TS045 – Riser Winch Support 45,996.18 ton – AT Topside - Weight
Piping - TS101 – Chemical Injection Module
Structural - TS151 – Main Laydown Module ~5,000 ton – RADIX responsibility - Weight
Instrumentation - TS152 – Starboard Laydown Module Aft
Electrical - TS170 – Metering Unit

Category Description
Project Size/Weight
Basic Engineering Support RADIX is responsible for the detailing engineering project for 7 modules:
Mero 4 Detailed Engineering ADG FPSO will produce 180,000 barrel oil
Operations - TS031 – Power Generation Module 1 and 12 million m3 of gas per day.
ADG – Alexandre de - TS032 – Power Generation Module 1
Gusmão FPSO Discipline - TS045 – Riser Winch Support 46,296.41 ton – ADG Topside - Weight
Multidisciplinary - TS051 – Flare Knockout Drum and TEG Regeneration Module
Piping - TS170 - Metering Unit ~10,000 ton – RADIX responsibility - Weight
Structural - TS002 – Separation Module 2
Instrumentation - VE202 – Mooring and Subsea HPU
Electrical
Process /Safety
Process Safety Studies
Category Description Projects
Hydraulic balance The main objective of the study is to resize the in Accommodation Fire Water Deluge and ACCOMMODATION DELUGE SYSTEM
evaluate the substitution impact of ½” tubing and piping for 1” piping. EVALUATION
Discipline Hydraulic balance was evaluated using the software PIPEFLO®. FPSO Cidade de Itajaí
Process Safety

Category Description Projects


Stress Analysis; Piping vibration During FPSO Pioneiro de Libra oil production it was observed that some lines connected to WELL SERVICE PUMPS – PIPING VIBRATION
Well Services Pumps has been subjected to excessive piping vibrations. ANALYSIS
Discipline Based on vibration measurements presented, RADIX evaluated possible failures due to FPSO Pioneiro de Libra
Piping, Structure vibration level on piping small bore connections installed on piping supported at platform.

Category Description Projects


Depressurization study The main objective of the study is to analyze the depressurization of the gas dehydration BDVs STUDY
system of the FPSO Pioneiro de Libra, checking the size of the currently installed FPSO Pioneiro de Libra
Discipline restriction orifices and the time required to reach safe pressures in an emergency
Process scenario.

Category Description Projects


Depressurization study Engineering study for evaluation of chemical tank relief devices. The main objective was CHEMICAL TANKS RELIEF STUDY
to provide relief solutions for safety areas in normal and fire scenarios. Piping was FPSO Cidade de Itajaí
Discipline designed to flow relieved fluids. Designed of PVSVs and flame arrestors. In addition,
Process, Piping and Mechanical mechanical data from tanks were analyzed to verify consistency and guarantee safety.

Category Description Projects


Depressurization study The main objective of the study was to analyze the depressurization of all systems of the DEPRESSURIZATION STUDY
FPSO Pioneiro de Libra at the current CO2 percentage in the streams, checking the size of FPSO Pioneiro de Libra
Discipline all installed restriction orifices and properly depressurizing time. In addition, CO2
Process concentration limits and flare capacity were verified related to fire cases.
Petrobras track record
Category Description Projects
Feed The Replicants FEED project platforms with over 150000 man hours The Replicants FEED project
• 900,000 oil barrel/day + 50 MM m3 gas/day P-66, P-67, P-68, P-69, P-70, P-71, P-72 & P-73
Discipline • 1 year FEED project + 3 years Owner Engineer
Multidisciplinary • 1,100+ documents all disciplines
• 3D model going to 2” pipes
• Material requisitions to LLIC during FEED
Category Description Projects
Owner’s Engineering The Interface Management System is an information management software developed by The Replicants Owner’s Engineering
P-66, P-67, P-68, P-69, P-70, P-71, P-72 & P-73
OWNER’S Discipline
Radix for the Replicants FEED project that complements the traditional engineering project
management aiming to minimize impacts and misalignments between different
ENGINEERING Multidisciplinary subcontractors that could result in delays in the detailed Engineering and Construction
Project.

Category Description Projects


Detailed Engineering Mexilhão’s revamp project for the Brazilian natural gas market is responsible for handling
MEXILHÃO’S REVAMP PROJECT
15-20% of all country’s production. Main Topsides revamp items:
Fixed Platform Mexilhão MXL-1
Discipline New riser 18” Pre-Salt – platform pull in system and fenders detailed design, New system
Multidisciplinary pre-salt (HP2500#), CEDRO system demobilization, BS-500 – Duplex / Super-duplex
changing, GASMEX 34-inches class upgrade (600# to 900#), HIPPS (High Integrity
Pressure Protection System) to BS-500 and Pre-Salt, Seawater Heating System, Gas
Heating System.
Category Description Projects
This scope of work covers activities:
MAINTENANC Maintenance Engineering
• Maintenance Indicators Management (Backlogs, etc.)
UO-RIO MAINTENANCE CONTRACT
P-38, P40, P-51 and P-56
E SUPPORT Discipline • Equipment Technical Assistance
• Electrical Generation and Compression Systems Maintenance Engineering and
Multidisciplinary
Technical Support
• Specialized technical services associated with support activities in Maintenance
Over 225.000 man-hours Contract
Mexilhão’s revamp project for
the Brazilian natural gas market is
responsible for handling 15-20% of
all country’s production

Main Topsides revamp items:


• New riser 18” Pre-Salt – platform pull in
system and fenders detailed design;
• New system pre-salt (HP2500#)
• CEDRO system demobilization;
• BS-500 – Duplex / Super-duplex changing;
• GASMEX 34-inches class upgrade (600# to
900#)
• HIPPS (High Integrity Pressure Protection 1123 tons of assemble weight and
System) to BS-500 and Pre-Salt 345 of disassemble weight
• Seawater Heating System;
• Gas Heating System;
Petrobras Marlim Sul Maintenance Engineering
Contract
• Platforms Covered P-38, P40, P-51 and P-56
• Maintenance Indicators Management (Backlogs, etc.)
• Equipment Technical Assistance
• Electrical Generation and Compression Systems Maintenance Engineering and Technical Support
• Critical Equipment Maintenance Engineering and Technical Support
• Specialized technical services associated with support activities in Maintenance

First Selected PI Applications: Over 225.000


• Chemical Analysis man-hours
• Critical Rotating Machines Monitoring Contract
Engineering Studies
Category Description Projects
Hydraulic balance Design the Deluge System for fire protection of five sets of H2S Scavenger Injection Skids DELUGE SYSTEM DESIGN
and for the Corrosion Inhibitor pump skids (existing and new), and corrosion inhibitor tank. FPSO Cidade de Niterói – MV18
Discipline Hydraulic calculation using the software Pipe-Flo® to determine the required pressure and
Process Safety flow at each nozzle/sprinkler.

Category Description Projects


Lighting Study A study was carried out to replace the light fixtures, with high maintenance cost, with LIGTHING STUDY
floodlights in order to reduce the maintenance costs, maintaining the minimum lighting FPSO Cidade de Macaé – MV15
Discipline requirements established by the standards
Electrical

Category Description Projects


CCTV study The main objective of the study was to identify the best way to change the current CCTV UPDATE
cameras installed in the MV-20 and to identify areas that is not contemplated by cameras FPSO Cidade de Santos – MV20
Discipline in the existing CCTV system.
Telecom

Category Description Projects


Owner’s Engineering The main objective of the project was to analyze and comment the engineering GLYCOL FILTRATION SKID
documents of all disciplines designed by a third part group, and the vendor documents of FPSO Fluminense
Discipline the filters and pumps achieved by MODEC for a glycol filtration skid.
Multidisciplinar
Engineering Studies
Category Description Projects
Layout Study Perform a layout study for the Topsides Oil Processing Module (2-P), based on P&IDs, LAYOUT TOPSIDE OIL PROCESSING
equipment dimensions and FPSO overall keyplan of MV-29 (Tartaruga Verde). The scope FPSO Tartaruga Verde – MV18
Discipline of work includes equipment location, large bore line routing, module primary structure
Piping Structure design (for layout constraints verification) on a PDMS 3D.

Category Description Projects


Owner’s Engineering Owner Engineer of MOMEX to be the interface with Eni Mexico. RADIX plays a balanced MOMEX OWNER’S ENGINEERING
OWNER’S role in protecting owner interest in front of designer/builder and filling gaps and FPSO Eni Mexico Area 1
Discipline
ENGINEERING Process
supplementing a plant owner’s resources.

Category Description Projects


Flushing study The main objective of the study was to develop a flushing system of potable water for the FLUSHING SYSTEM
deluge system. RADIX specified a new pump using software Pipe-Flo® and the new piping FPSO Fluminense
Discipline and cable routing.
Process, Electrical, Piping

Category Description Projects


FEED Engineering The main objective of the study was to develop a FEED project to adjust the topside
FEED PROJECT system to operate with new process conditions, to produce oil from the Lapa field that will
FEED LAPA
FPSO Cidade de Caraguatatuba – MV27
Discipline be connected to the FPSO.
Multidisciplinar
Master Service Agreement since 2012
Chevron Brasil Ltda.
• Facilities – Capitals and small capitals Brownfield Projects
• Construction
• Base Business – Maintenance Engineering
• MOCs Coordination
• Automation and Software - Operational Intelligence
• Regulation and Standards Consultancy
• HES
Master Service Agreement since 2019 - EQUINOR

• Fleet Support activities


• Maintenance Engineering
• Regulation Compliance Support
• Process Safety design
• Special Studies
Offshore Modules Engineering Capabilities are based in
several previous Capital Projects
Customer / Vessel Project Details Size Total Weight

Sulphate Removal Skid / Complete


Aker Process System / 27m (height) x 5.1m
Detailed Engineering Design including 126 ton (dry)
Modec FPSO MV-24 (OD)
construction support on field

Electrical Module (E-House) / Complete 27.81m (width) x


General Electric / Petrobras
Detailed Engineering Design including 21.81m (length) x 17.5m 1,570 ton
P-75
construction support on field (height)

Electrical Module (E-House), where we


27,81m (width) x
General Electric / Petrobras suplied Complete Detailed Engineering
21.81m (length) x 17.5m 1,570 ton
P-77 Design including construction support on
(height)
field

Electrical Module (E-House) / Complete 20m (width) x 31.4m


General Electric / Petrobras
Detailed Engineering Design including (length) x 28.2m 1,225.7 ton
Libra Pilot
construction support on field (height)
Offshore Modules Engineering Capabilities are based in several
previous Capital Projects
Customer / Vessel Project Details Size Total Weight

Sulphate Removal Skid / Complete


Aker Process System / 16.5m (width) x 12m
Detailed Engineering Design including 176 ton (dry)
Petrobras FPSO P-58 (length) x 10m (height)
construction support on field

Sulphate Removal Skid / Complete


Aker Process System / 16.5m (width) x 12m
Detailed Engineering Design including 160 ton (dry)
Petrobras FPSO P-62 (length) x 10m (height)
construction support on field

Water Filtration and Chemical Injection


Aker Process System / Skid / Complete Detailed Engineering 24m (width) x 19m
660 ton (dry)
Modec FPSO MV-24 Design Including construction support on (length) x 10m (height)
field

Aker Process System / Sulphate Removal Skid / Complete 11.44m (width) x 8m


209 ton (dry)
Modec FPSO MV-24 Detailed Engineering (length) x 12m (height)
ENEVA has a thermal generation park with 2.2 GW of
installed capacity, being 1.4GW to Natural Gas and
725MW to Mineral coal. The RESERVOIR-TO-WIRE model (R2W) consists of the thermal
generation in close of the onshore NATURAL gas producing fields

BROWNFIELD PROJECTS GAVIÃO CABOCLO


UTG / CLUSTERS DETAILED DESIGN

2015 12/2016 06/2017 01/2018 04/2018 05/2018 07/2019


REVAMP EPGVB – GAVIÃO PRETO – FEL 3 BROWNFIELD PROJECTS AZULÃO FEL UTE - PARNAIBA V AZULÃO
DETAILED DESIGN ENEVA POWER UNITS 2 FEL 2 DETAILED DESIGN &
CONSTRUCTION SUPPORT

You might also like