Zorya Presentation
Zorya Presentation
“ZORYA-MASHPROEKT”
Nikolaev, Ukraine
3
“Zorya-Mashproekt” turbines for gas pumping Each type of the gas turbine has several
incorporate merits of aviation engines (light weight modifications different in speed, power turbine
& overall dimensions, easy transportation, ability fo rotation direction and support construction, which
replacement of the whole unit or its module), as allow to use them as part of domestic and import
well as reliability & long service life of industrial gas pumping units without gearings.
engines. “Zorya-Mashproekt” gas turbines are adopted
The turbines are 3-shaft design: low- and high- for lubrication by same lubrication oil as driven
pressure compressors driven by own axial compressor what permits to simplify the
turbines, unified for each turbine type and a free compressor stations lubricating system. As a rule,
power turbine. The combustion chamber is can- the turbines are equipped with electrical starting
annular type. devices.
Features
Efficiency, %
Power, MW
N= 70 kW.
Engine Engine
Power, kW Exhaust gas temperature, 0C
Efficiency, % Dimensions (LxWxH), m
3
Heat rate, nm /kW-hr Weight, ton
Exhaust gas mass flow, kg/sec
N= 70 kW.
Engine Engine
Power, kW Exhaust gas temperature, 0C
Efficiency, % Dimensions (LxWxH), m
3
Heat rate, nm /kW-hr Weight, ton
Exhaust gas mass flow, kg/sec
UGT 16000 (DG 59)
Efficiency, %
Power, MW
N=3 x 70 kW. 16 30
12 28
8 26
4 24
-35 -25 -15 -5 5 15 25 35 45 -35 -25 -15 -5 5 15 25 35 45
0
Ambient air temperature, C Ambient air temperature, o0C
30 38
Efficiency, %
Power, MW
25 34
20 30
15 26
10 22
-35 -25 -15 -5 5 15 25 35 45 -35 -25 -15 -5 5 15 25 35 45
Ambient air temperature, 0C Ambient air temperature, o0C
unit.
One of the features of this upgrading is the new
gas turbine “building in” the acting design scheme
of the original unit maintaining all of its functions
including house generating drive & united
GTK-10-4 gas pumping unit modernization lubricating oil system.
Frequency converter provides constancy of the
frequency of the electrical energy produced by the
Air inlet
Gas house generator. This converter is used also for
Conteiner Intermediate compressor
bearing
gas turbine starter control and provides smooth
gas pumping unit starting.
Air for gas
turbine cooling
Gas compressor
lubricating oil tank
Ecological Energetical
STIG STIG
Center address:
1, Khutoryanskiy Square, Tyumen-625014, Russia
Tel/Fax: (3452) 21-34-74, 21-60-46, 21-09-37
(095) 719-60-99,
e-mail: gazts@tyumen.ru
New and up-dating gas pumping units
with "Zorya”-“Mashproekt" gas turbines
Efficiency, %
Engine Type Power, MW Units Type (at station)
Model Speed, rpm
Initial New
DE76
GPA-3S "Ural'
DT71 GPA-C-6,3
GT-6-750-6
GT-6-750
GTN-6
DN70L GTK-10-2
GTK-10-4
GPU-10
GPU-10-1
DI70P GTK-10I
DI70L
GT-750-6
DU70L GPU-16K"Vodoley"
DG90L2 GTK-10-2
GTK-10-4
GPA-C-16S
GPU-16S
GPA-C-16S "Ural"
GPA-16 "Volga"
GPA-16 "Neva"
GPU-16A
DG90P1 Coberra-182
DJ59L2 GPA-16
GTK-10-4
GPA25/16
Coberra-182
DN80L GPA25/16
DI80P GTK25I
DU80L GPA-C-25S
GPA-25S "Ural"
15
REFERENCE LIST
DR59 for GPU-10, GPU-10-01
Beginning of Number
operation Location of gas turbines
UGT16000 (DJ59)
Beginning of Location Number
operation of gas turbines
UGT6000 (DT71)
Beginning of Number
operation Location of gas turbines
RUSSIA. Total number 3 GPU, total power 18,9 MW
UGT25000 (DN80)
Beginning Number
of operation Location of gas turbines
SRDP GC “Zorya”-”Mashproekt”
also offers:
GTR&PC “Zorya”-”Mashproekt”
42a Oktyabrsky prospekt
Nikolaev, 54018, Ukraine.
Tel. +38 0512 50-90-40, 50-25-61, 55-69-92,
Fax +38 0512 50-90-50, 55-68-68