Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

Gas Turbine Engines

For Gas Pipelines


IN THE MARINE, POWER
AND GAS INDUSTRY

The State Enterprise “Zorya-Mashproekt” Gas Turbine


Reasearch & Production Complex has a 50-years experience in
designing & production gas turbines for Navies, commercial and
passenger vessels, power plants and gas piping units and
drivers for production equipments. The turbines developed for
marine application have been excellently proven on land. Since
1953 over 3000 marine & industrial gas turbines have been
produced and supplied. Thousands of varies reduction gears for
different class displacement ships, hovercrafts & hydrofoils also
for industrial application have been produced.
Ships of 20 countries worldwide, over 60 power stations,
more than 100 gas pipelines compressor stations in Russia,
Ukraine, Kazakhstan, Belarus, Czechia, Canada, Azerbaijan,
Iran and other countries are equipped with Zorya-Mashproekt
gas turbines. The total power of the turbines exceeds 24 million
kW and total firing time over 26 million hours.
According to GAZPROM statistics, the gas pumping units
(GPU) driven by our gas turbines have been acknowledged most
reliable comparing to driven by another companies. They have
highest mean value of technical utilization coefficient, maximum
time between failure and the highest availability factor.
Owing to the constant work on support and upgrade of the
technical level, the of-time of many turbines exceeded 80000
firing hours without factory repair. UGT16000 (DR59) second
generation leading turbine have accumulated over 35000 hours,
UGT25000 fourth generation turbine over 28000 hours,
UGT10000 fourth generation turbine has been put in to trial-
commercial operation at Kirovogradskaya compressor station
(Ukraine) in 2002.
“Zorya-Mashproekt” gas turbines were created for naval
applications; they are also adjusted for working off-shore, on
floating & stationary oil & gas platforms.

“ZORYA-MASHPROEKT”
Nikolaev, Ukraine
3

FROM PROJECT THROUGH DELIVERY

The specialist of «Mashproekt» (Scientific Research &


Experimental-Design Works Center) is constantly working at
creating new & upgrading early-developed gas turbines widely
using modern sophisticated CAD\CAM systems.
“Zorya-Mashproekt” facilities & laboratories have been equipped
with up-to-date tools, equipment & technologies, the personnel
there is well trained. High-temperature steel & alloy precision
casting, precise isothermal & impulse extrusion, electro-beam
welding, electro-beam & plasma coatings, laser cutting, electric
methods of metal treatment-these make an incomplete list of
advanced technologies applied at the enterprise.
Possessing tooling allows realizing on time & qualitative
production preparation.
Gas turbines parts & assembling operational development &
testing are held on the test-beds of the Scientific Research
Department. 11 test-beds for full-scaled turbines & units testing are
situated on the main territory, & 5 test-beds are in Kaborga village
where is a marine test station, & a special loading gas ring for
testing GPU is built.
The specialist of the complex perform contract supervision,
adjustment & alignment, guaranteed maintenance of prototype &
stock-produced items on-site of the customer, and also after-sale
maintenance through the whole service life.
GAS TURBINE ENGINES
FOR GAS PIPELINES COMPRESSORS DRIVE

“Zorya-Mashproekt” turbines for gas pumping Each type of the gas turbine has several
incorporate merits of aviation engines (light weight modifications different in speed, power turbine
& overall dimensions, easy transportation, ability fo rotation direction and support construction, which
replacement of the whole unit or its module), as allow to use them as part of domestic and import
well as reliability & long service life of industrial gas pumping units without gearings.
engines. “Zorya-Mashproekt” gas turbines are adopted
The turbines are 3-shaft design: low- and high- for lubrication by same lubrication oil as driven
pressure compressors driven by own axial compressor what permits to simplify the
turbines, unified for each turbine type and a free compressor stations lubricating system. As a rule,
power turbine. The combustion chamber is can- the turbines are equipped with electrical starting
annular type. devices.

Features

1 - Variable geometry inlet guide vane


2 - Low pressure compressor (LPC)
3 - High pressure compressor (HPC)
4 - Combustion chamber (CC)
5 - High pressure turbine (HPT)
6 - Low pressure turbine (LPT)
7 - Power turbine (PT)
8 - Auxiliary drive gearbox
9 - Electric starter
10 - Frame
UGT 3000 (DE76)

Compressor - axial, 8 stages LPC,


9 stages HPC.
Pressure ratio - 13,5.
Combustion chamber - can-annular
reverse flow with 9 combustion
liners, TIT - 1020 0C.
Gas generator turbines - axial, single
stage LPT and HPT.
3-stage power turbine speed - 9700 rpm.
Start - electric motors AC U=380 V,

Efficiency, %
Power, MW
N= 70 kW.

Ambient air temperature, 0C Ambient air temperature, 0C

Power, kW Exhaust gas temperature, 0C


Efficiency, % Dimensions (LxWxH), m
Heat rate, nm3/kW-hr Weight, ton
Exhaust gas mass flow, kg/sec

UGT 6000, UGT 6000+


(DT71, DV71)
Compressor - axial, 8 stages LPC,
9 stages HPC.
Pressure ratio - 14/15,3.
Combustion chamber - can-annular
reverse flow with 10 combustion
liners, TIT - 1015 - 1100 оC.
Gas generator turbines - axial, single
stage LPT and HPT.
Power turbine speed - 3000, 4800,
5400, 8200, 9700 rpm.
Start - electric motors AC U=380 V,
N=70 kW.
Efficiency, %
Power, MW

Ambient air temperature, 0C Ambient air temperature, 0C

Engine Engine
Power, kW Exhaust gas temperature, 0C
Efficiency, % Dimensions (LxWxH), m
3
Heat rate, nm /kW-hr Weight, ton
Exhaust gas mass flow, kg/sec

Note: ISO condition


6

UGT 10000 (DN70, DI70, DU70)

Compressor - axial, 9 stages LPC,


9 stages HPC.
Pressure ratio - 19,5.
Combustion chamber - can-annular
reverse flow with 10 combustion
liners, TIT - 1200 0C.
Gas generator turbines - axial, single
stage LPT and HPT.
Power turbine speed - 3600, 4800, 6500 rpm.
Start - electric motors AC U=380 V,
Efficiency, %
Power, MW

N= 70 kW.

Ambient air temperature, 0C Ambient air temperature, 0C

Power, kW Exhaust gas temperature, 0C


Efficiency, % Dimensions (LxWxH), m
Heat rate, nm3/kW-hr Weight, ton
Exhaust gas mass flow, kg/sec

UGT 15000, UGT 15000+ (DB90, DG90, DA91)


Compressor - axial, 9 stages LPC,
10 stages HPC.
Pressure ratio - 19,6.
Combustion chamber - can-annular
reverse flow with 16 combustion
liners, TIT - 1075 1160 оC.
Gas generator turbines - axial, single
stage LPT and HPT.
Power turbine speed - 3000, 5300 rpm.
Start - electric motors AC U=380 V,
N= 2 х 70 kW.
Efficiency, %
Power, MW

Ambient air temperature, 0C Ambient air temperature, 0C

Engine Engine
Power, kW Exhaust gas temperature, 0C
Efficiency, % Dimensions (LxWxH), m
3
Heat rate, nm /kW-hr Weight, ton
Exhaust gas mass flow, kg/sec
UGT 16000 (DG 59)

Compressor - axial, 7 stages LPC,


9 stages HPC.
Pressure ratio - 12,8.
Gas generator turbines - axial, 2
stage LPT and HPT.
Combustion chamber - can-annular
with 10 combustion liners, TIT - 865 0C.
Power turbine - axial, 3 stages.
Power turbine speed - 5300 rpm. 24 34
Start - electric motors AC U=380 V, 20 32

Efficiency, %
Power, MW

N=3 x 70 kW. 16 30
12 28
8 26
4 24
-35 -25 -15 -5 5 15 25 35 45 -35 -25 -15 -5 5 15 25 35 45
0
Ambient air temperature, C Ambient air temperature, o0C

Power, kW Exhaust gas temperature, 0C


Efficiency, % Dimensions (LxWxH), m
3
Heat rate, nm /kW-hr Weight, ton
Exhaust gas mass flow, kg/sec

UGT 25000 (DG80, DI80, DN80, DU80)

Compressor - axial, 9 stages LPC,


9 stages HPC.
Pressure ratio - 21.0
Combustion chamber - can-annular
reverse flow with 16 combustion
liners, TIT - 1245 0C.
Gas generator turbines - axial, single
stage LPT and HPT.
Power turbine speed - 3600, 4850 rpm.
Start - electric motors AC U=380 V,
N=3 x 70 kW.
35 42

30 38
Efficiency, %
Power, MW

25 34

20 30

15 26

10 22
-35 -25 -15 -5 5 15 25 35 45 -35 -25 -15 -5 5 15 25 35 45
Ambient air temperature, 0C Ambient air temperature, o0C

Power, kW Exhaust gas temperature, 0C


Efficiency, % Dimensions (LxWxH), m
3
Heat rate, nm /kW-hr Weight, ton
Exhaust gas mass flow, kg/sec
“ZORYA-MASHPROEKT” Gas Turbines
For New & Modernized Gas Pumping Units
Experience of using “Zorya-Mashproekt” gas turbines “Zorya-Mashproekt” performs projects of on-site drive
as integrated parts of gas pumping units achieves over 25 adjustment in the units under upgrading. It also prepares
years. To date most of the gas pumping units based on equipment sets document necessary for gas pumping
the DR59 gas turbine has exhausted their service life. The units upgrading. They include field changing of the
specialists of the company have developed the concept of equipment available on site (blowers, supports, air
using the third & fourth generation gas turbines in gas intake devises, exhausters, serving the auxiliary
pumping units of compressor stations under construction equipment). By the customer's desire, the experts of the
& modernization for drive replacement, both domestic & company can perform automatic control system
foreign ones. engineer's project of the units under upgrading.
34 modernization projects have been developed for To increase independence of the compressor stations
gas pumping units in operation. They include replacement work when the outer power source is off & with the
of out-of-date drives with exhausted life by modern, more purpose to decrease cost on buying electric power,
economical “Zorya-Mashproekt” gas turbines. As a result “Zorya-Mashproekt” suggests using free space after out-
of such reconstruction, at the working compressor station of-date engines removed for construction own power
the modern technical level is being provided something station for providing compressor station uninterruptible
nonstop. The greatest economical effect attributes to the power supply. “Zorya-Mashproekt” offers power stations
upgrading of the working compressor shops in the with rated power 2.5, 6, 16 MW as well as turbo-
conditions, when the new shop construction is either expander generating sets.
impossible or extremely difficult (in the mountainous
pipeline sections, frozen grounds of the Extreme North, in
the swamped territories when there are problems with
land a purchasing).

DE76 gas turbine modification with speed 9700


rpm was developed for the direct drive “Prague
Energo” 3RSC56/3RSD56 centrifugal compressor
without gearbox. This unit is used for gas pumping
in and out at underground gas storage in Czech.
The turbine has absolutely new two channel
burners for NOx reduction and a special cage
design with many layer sound isolation. The
DE76E gas turbine can be used also in “URAL
GPU-3C” compressor set developed by “ISKRA
SPE”, Perm, Russia.

Gas pumping unit driven by DE76E at Stramberk


underground gas storage engine room

The UGT6000 (DT71) gas turbine engine is


used in GPU-C-6,3C unit produced by the
“FRUNZE” company as serial production. It is also
used to replace NK-12ST aeroderivated engine
while upgrading GT-750-6 gas pumping units.
This gas turbine is possible to be used for
upgrading GTN-6 and GT-6-750 units produced by
Russian company “Turbomotorworks”.
There is UGT6000+ boosted version with rated
power up to 8MW.

Gas pumping unit GPA-C-6,3S with Dt71 gas turbine


The UGT10000 fourth generation gas turbine GTK-10-I gas pumping unit modernization via replacing
has been developed with several modifications: old MS3002 by new one DI70P gas turbine
DN70L with 4-stage left-rotated power turbine
and rated speed 4800 rpm for GTC-10-2, GTC-10- Air inlet
modernization
4 and GTU-10 gas pumping units upgrading; Exhaust
Auxiliary
mechanism
DI70P with 3-stage right-rotated power turbine gas gearbox
DI70P vent
and rated speed 6500 rpm for GTC-10I gas Auxiliary alternator

pumping units upgrading;


DI70L with 3-stage left-rotated power turbine
and rated speed 6500 rpm for GT-750-6 gas
pumping units upgrading;
DU70L gas turbine with modernized flowing part
to the power of 16MW by means of steam injection
with 4-stage left-rotated power turbine and rated Auxiliary mechanism Auxiliary mechanism
speed 4800 rpm is used in “Aquarius” GPU-16K gearbox gearbox

unit.
One of the features of this upgrading is the new
gas turbine “building in” the acting design scheme
of the original unit maintaining all of its functions
including house generating drive & united
GTK-10-4 gas pumping unit modernization lubricating oil system.
Frequency converter provides constancy of the
frequency of the electrical energy produced by the
Air inlet
Gas house generator. This converter is used also for
Conteiner Intermediate compressor
bearing
gas turbine starter control and provides smooth
gas pumping unit starting.
Air for gas
turbine cooling

Gas compressor
lubricating oil tank

Modernized GTK-10-4 gas pumping unit with air inlet chamber


and lubricating oil unit in the assembling workshop

Container with gas turbine is manufactured with


highest noise insulation degree. Turboblock and air
inlet unit integral design gives opportunity to reduce
building and assembly jobs period.
Gas compressor lubricating is integrated with
gas turbine lubricating oil system, this design gives
opportunity to exclude electrically driven pump.
Modernized gas pumping unit GTK-10-4 with
DN70L gas turbine at CS Kirovogradskaya, Ukraine
The UGT 15000 gas turbine engine has the Noise killer
Inlet air filter
following modifications:
DG90L, DG90L2 with power turbine frequency
5300 rpm of left rotation to be used in new GPUs of
compressor shops:
GPA-C-16S - developed by "Frunze" company Gas
turbine
(Sumy, Ukraine); engine
GPA-16 "Ural" - developed by "Iskra" company
((Perm, Russia);
GPA-16 "Volga" (Kazan, Russia);
GPA-16 "Neva" (St. Peterburg, Russia);
while upgrading GPUs increasing the drive
power:
GTK-10-4 (GTK-10-2) developed by NZL (St.
Peterburg, Russia) Luboil unit Supercharger
GTE cooler GTE container
GPU-10 developed bu "Zorya"-"Mashproekt"
(Nikolayev, Ukraine), The gas pumping unit diagram
GPU-16 developed by "Frunze" company (Sumy,
Ukraine).
- DG90P with power turbine speed of 5300 rpm
of right rotation for upgrading Coberra-183 imported
units by Cooper -Rolls company.
The main pattern of DG90P engine was installed
in 1994 at Bogandinskaya compressor station
(Surgutgasprom) as a part of Coberra-182 upgraded
unit.
Two compressor shops were upgraded with
DG90P engines at Bogandinskaya and
Turtasskaya compressor stations.
Some compressor stations with actual
efficiency of no more then 20% were upgraded with
DG90L2 engine (Surgutgasprom & Volgotransgas
companies).
GPU-10 (GPU10-01) upgrading is held by means
replacing DR59L second generation engine rating at
10 MW & efficiency of 27% with DG90L rating at 16
MW.
While upgrading new DG90L installation
provided housed in the finished serial block from the
reserve recourse stock.
They perform upgrading or replacement of the
blower supercharger, complex air cleaner, gas
exhaust path, automatic control system, as well as
ventilation, fuel & lubrication systems changes. Gas pumping unit GPA-16C
At Vyngapurovskaya compressor station there's driven by UGT15000 gas turbine
also a shop equipped with upgraded GPU16-16S
units powered by DG90L2.

DG90L2 engnes as part of new gas pumping


units are used by gas transportation & production
companies of Ukraine, Russia, Belarus, Turkistan
(over 50 engines? As well as to power ammonia
compressors at Odessa Port Plant (two engines).
"Zorya"-"Mashproekt" has totally produced over
140 UGT15000 engines in different modifications.
The leading engines at Surgutgasprom compressor
station have accumulated over 37.00 fire hours.

Container with ammonia compressor


driven by UGT15000 gas turbine
at Odessa Port Plant
Bt their design & parameters turbines of UGT16000
family (DR59, DJ59) are of the second generation, but they
have proved themselves as the most reliable at the gas
pumping stations.
10MW DR59 with efficiency of 28% is used in GPU-10 &
GPU-10-01. “Zorya-Mashproekt” and “KRTZ VOSKHOD”
have produced 536 turbines totally. The leading DR59
turbines have accumulated over 100000 firing hours.
DJ59 with efficiency 30% and rated power 16MW is
used in GPU-16 developed by Ukrainian company
“FRUNZE”. Totally over 120 units like this have been
manufactured.
Beginning in 1992, DH59L2 have been widely used for
replacing out-of-date drives while upgrading GTC-10-4 &
GPU-25/76 units developed by “Nevskiy Zavod” from St.
Petersburg, Russia, and replacing COBERRA-182 gas
generator from Cooper-Rolls” company. 33 DJ59L2
turbines are working in the upgraded units at 9 compressor
stations of “Permtransgas” ltd and “Vologotransgas” ltd Gas pumping unit GPU-16A
companies.

UGT25000 fourth generation gas turbine also has


several versions of power turbines in speed & rotation
direction:
DN80L with speed of 3300 rpm is used for upgrading
GPU-25/76 at Ukrainian & Russian gas pipelines as well as
at underground gas storages in Gasli (Uzbekistan).
DI80P with speed of 4850 rpm & right rotation is
intended to replace MS5003 engines (manufactured by
General Electric) in GTC-25I units produced Nuovo
Pignone.
DU80L with speed 4850-5000 rpm and left rotation is
intended for “URAL GPU-C-25” and GPU-25C gas
pumping units manufactured by Russian company “ISKRA”
and Ukrainian company “FRUNZE”.
Over 40 DN80L gas turbines have been produced and
leading turbine has been accumulated over 28000 firing
hours.
Gas pumping unit GPA-26/76 modernization project
with using of DN80L gas turbine

Sofievskaya compressor station, Ukraine Modernized GPA-25/76 gas pumping


in the Sofievskaya compressor station
engine room
Sophisticated Cycle Installations
For Gas Pumping

It increases efficiency & power of the units, “AQUARIUS”


decreasing contaminant emission in
combustion products. Thus, 16MW gas Installation Diagram
pumping unit GPU-16K driven by UGT10000
gas turbine working in a heat recovery unit of
“Aquarius” type with energetic & ecological Exhaust gas
steam injections and water recovery from
Cooling water
combustion products. First GPU-16K is in
service at Stavischi compressor station, Condansate
Fuel
“Cherkassytransgas”, Ukraine. Feed water
The merits of the «Aquarius» are high
efficiency up to 43% in ISO condition and low
Energetical Steam-Gas
emission. The Nox emission levels for 25MW Ecological
STIG STIG Mix
installation equal to 25 ppm at rated power and
for 16MW installation they are 35 ppm. CO Air

emissions amount to 30 ppm.


The steam generated in the waste heat
recovery boiler is used for generating additional 1 - gas turbine
power and for Nox/CO suppression down to 2 - waste heat recovery boiler
25/30 ppm. 3 - contact condenser
4 - condensate collector
In the contact condenser, which is installed 5 - condensate cleaning unit
at the top of the waste heat recovery boiler 6 - feed water tank
7 - water cooler
water condensation and recovery out of the 8 - pump
steam and gas mixture occur. The “Aquarius” 9 - gas compressor
type installations are capable of generating
additional fresh water as a result of chemical
reaction by fuel burning in the gas turbine when
the cooling water in the installation inlet is
lower than 30 centigrade.
An experimental 25 MW “Aquarius”
installation has been successfully operates
since 1995 and has accumulated over 10000
working hours at the “Zorya-Mashproekt” test
facility.

Ecological Energetical
STIG STIG

UGT10000 (DU70L) gas turbine with STIG


Gas pumping unit GPU-16K at Stavischy compressor station
Interregional Center “GASTURBOSERVICE”
on the repair of gas pumping units

In November 1996 Open JSC “GASTURBOSERVICE” -


Interregional Center on overhaul and maintenance of Zorya-
Mashproekt gas turbine engines being used in gas pumping units
was created. Its founders are: “Surgutgasprom” Ltd., Open JSC
“Turbomotorworks” and GTR PC “Zorya-Mashproekt”.
Available up-to-date technology, highly precise equipment and
skilled personnel provide qualitative repair and maintenance of
products, being operated in Russia. Moreover, time of repair and
transportation charges are being reduced, customs expenses are
being excluded.
Among the Customers of Open JSC “Gasturboservice”are:
Yamburggasdobycha, Tumentransgas, Severgasprom,
Permtransgas, Uraltransgas, Bashtransgas, Samaratransgas,
Tattransgas, etc.
Open JSC “Gasturboservice” performs the repair and
maintenance of DR59L, DJ59L, DC59 gas turbine engines for gas
pumping units and autonomous power plants.
In future Open JSC “Gasturboservice” plans to carry out the
repair and maintenance of “Zorya-Mashproekt” third and fourth
generation gas turbine engines.

Center address:
1, Khutoryanskiy Square, Tyumen-625014, Russia
Tel/Fax: (3452) 21-34-74, 21-60-46, 21-09-37
(095) 719-60-99,
e-mail: gazts@tyumen.ru
New and up-dating gas pumping units
with "Zorya”-“Mashproekt" gas turbines

Efficiency, %
Engine Type Power, MW Units Type (at station)
Model Speed, rpm

Initial New
DE76
GPA-3S "Ural'
DT71 GPA-C-6,3
GT-6-750-6
GT-6-750
GTN-6

DN70L GTK-10-2
GTK-10-4

GPU-10
GPU-10-1

DI70P GTK-10I

DI70L
GT-750-6
DU70L GPU-16K"Vodoley"

DG90L2 GTK-10-2
GTK-10-4
GPA-C-16S
GPU-16S
GPA-C-16S "Ural"
GPA-16 "Volga"
GPA-16 "Neva"
GPU-16A
DG90P1 Coberra-182

DG90P1 GPA STD 12,5

DJ59L2 GPA-16
GTK-10-4
GPA25/16
Coberra-182

DN80L GPA25/16

DI80P GTK25I

DU80L GPA-C-25S

GPA-25S "Ural"
15

REFERENCE LIST
DR59 for GPU-10, GPU-10-01
Beginning of Number
operation Location of gas turbines

RUSSIA. Total number 284 GPU, total power 2840 MW


Bashtransgas. Total number 48 GPU, total power 480 MW
1980 CS Urgala, Bashkortostan 8
1980 CS Arkaulovo, Bashkortostan 8
1982-83 CS Polyanzkaya, Bashkortostan 16
1982-83 CS Sharan, Bashkortostan 16

Volgotransgas. Total number 6 GPU, total power 60 MW


1995 CS Yavasskaya, Mordovia 6

Kavkaztransgas. Total number 21 GPU, total power 210 MW


1988 CS Artezianskaya, Kalmykiya 7
1991 CS Zenzelinskaya, Astrakhan region 7
1995 CS Zamyanskaya, Astrakhan region 7

Lentransgas. Total number 9 GPU, total power 90 MW


1978 OPCS Torzhok, Torzhok town 3
1994 CS Pikalevo, Leningrad region 3
1995 CS Volhovskaya, Leningrad region 3

Permtransgas. Total number 8 GPU, total power 80 MW


1990 CS Gremyachinskaya, Perm region 8

Samaratransgas. Total number 24 GPU, total power 240 MW


1990 CS Sokovka, Orenburg region 24

Severgasprom. Total number 36 GPU, total power 360 MW


1981 CS Nyuksenitsa, Vologda region 8
1981 CS Privodino, Arkhangelsk region 8
1981 CS Urdoma, Arkhangelsk region 8
1981 CS Yubileinaya, Vologda region 8
1995 CS Sheksna, Arkhangelsk region 4

Surgutgasprom. Total number 4 GPU, total power 40 MW


1996 CS Karasulinsraya, Tyumen region 4

Tomsktransgas. Total number 5 GPU, total power 50 MW


1997 CS Kozhurlinskaya Novosibirsk region 5

Tyumentransgas. Total number 91 GPU, total power 910 MW

1982-83 CS Peregrebnoe, Tyumen region 16


1982-83 CS Lyalinskaya, Ekaterinburg region 16
1984-86 CS Bobrovskaya, Tyumen region 14
1985 CS Purovskaya, Tyumen region 12
1985 CS Sosnovskaya, Tyumen region 14
1990 CS N. Komsomolskaya, Tyumen region 6
1992-2002 CS Tayozhnaya, Tyumen region 6
1993 CS N. Ivdelskaya, Ekaterinburg region 7

Uraltransgas. Total number 8 GPU, total power 80 MW


1981 CS Dolmatovskaya, Kurgans region 8

Сhechensgas. Total number 3 GPU, total power 30 MW


1990 CS Chervlennaya, Chechnya 8

UKRAINE. Total number 44 GPU, total power 440 MW


Donbastransgas. Total number 8 GPU, total power 80 MW
1981 CS Novopskov, Lugansk region 8

Kievtransgas. Total number 21 GPU, total power 210 MW


1987-98 CS Romnenskaya, Sumy region 7
1987 CS Zenkovskaya, Sumy region 7
1987 CS Reshetilovskaya, Poltava region 7
DR59 (prolongation)
Beginning of Number
operation Location of gas turbines

Prikarpattransgas. Total number 8 GPU, total power 80 MW


1991 CS Golyatinskaya, Zakarpatie region 8

Cherkassytransgas. Total number 7 GPU, total power 70 MW


1996 CS Gusyatinskaya, Ternopol region 7

KAZAKHSTAN. Total number 22 GPU, total power 220 MW 7


1998 CS Akkolskaya, Kaspi area
8
1998 CS Redutskaya, Kaspi area
7
1991 CS Taimanskaya, Kaspi area

UGT16000 (DJ59)
Beginning of Location Number
operation of gas turbines

RUSSIA. Total number 133 GPU, total power 2128 MW


Volgotransgas, 22 GPU, total power 352 MW
1995 CS Vyatskaya, Kirov region 8 (3 modernization GPA-25/76)
1995 CS Morkinskaya, Maryi El Republic 8 (3 modernization GPA-25/76)
1998 CS Pilnenskaya, Gorky region 6 (GPU-16)

Permtransgas, 48 GPU, total power 768 MW


CS Dobryanskaya, Perm region 7 (3 modernization GPA-25/76)
1991-1994
1991 CS Ocherskaya, Perm region 5 (GPU-16)
1992-1993 CS N. Kungurskaya, Perm region 8 (GPU-16)
1993-1994 CS Almaznaya, Perm region 10 (GPU-16)
1994 CS Agryzskaya, Perm region 5 (modernization GTK-10-4)
1994 CS Vavolzhskaya, Perm region 5 (GPU-16)
1996 CS Igrinskaya, Perm region 5 (GPU-16)
1997--2000 CS Ordinskaya, Perm region 3 (modernization GTK-10-4)

Tattransgas, 9 GPU, total power 144 MW


1995-1997 CS Shemordan, Tatarstan 9 (6 modernization GTK-10-4,
3 modernization GPA-25/76)

Tumentransgas, 10 GPU, total power 160 MW


1990-2002 CS N. Komsomolskaya, Tumen region 10 (GPU-16)

Yamburggasdobycha, 30 GPU, total power 480 MW


1995 DCS-1, Yamburg 5 (GPU-16)
1995 DCS-6, Yamburg 5 (GPU-16)
1997 DCS-2, Yamburg 5 (GPU-16)
1997 DCS-5, Yamburg 5 (GPU-16)
1998 DCS-3, Yamburg 5 (GPU-16)
2000 DCS-7, Yamburg 5 (GPU-16)

UKRAINE. Total number 8 GPU, total power 128 MW


Kievtransgas, 4 GPU, total power 64 MW
1996 CS Grebenkovskaya, Poltava region 4 (GPU-16)

Cherkassytransgas, 4 GPU, total power 64 MW


1997 CS Stavishchenskaya, Kiev region 4 (GPU-16)

IRAN. Total number 12 GPU, total power 192 MW


1995 CS X-1, near Farrashband town 3 (GPU-16)
1996-2000 CS X-2, near Nur Abad city 4 (GPU-16)
1998-2000 CS X-4, near Zarin Shahr city 5 (GPU-16)
UGT3000 (DЕ76)
Beginning of Number
operation Location of gas turbines

CZECH, 1 GPU, power 3 MW

1995 CS Shtremberg 1 (3RS56/3RD56)

UGT6000 (DT71)
Beginning of Number
operation Location of gas turbines
RUSSIA. Total number 3 GPU, total power 18,9 MW

1995 Mostransgas, Total number 3 GPU, total power 18,9 MW


CS Gavrilov Yam, Yaroslavl region 1 (modernisation GPA-C-6,3S)
1995 1 (modernisation GPA-C-6,3S)
1996 CS Oktyabrskaya, Stavropol territory
CS Tchaplyginskaya, Lipetsk region 1 (modernisation GPA-C-6,3S)

UKRAINE. Total namber 16 GPU, total power 100,8 MW

Kievtransgas, 7GPU, total power 44,1 MW


1995 CS Diranka, Poltava region 7 (GPA-C-6,3S)

Prikarpattransgas 7 GPU, total power 18,9 MW


2001 , Yzhgorodskaya, Zakarpatie region
CS 7 (GPA-C-6,3S)

Kharkovtransgas, 2 GPU, total power 12,6 MW


1993 CS Kupyanskaya, Khharkov region 2 (modernization GPA-C-6,3S)

UGT10000 (DN70, DU70)


Beginning of Number
operation Location of gas turbines
UKRAINE. Total namber 2 GPU, total power 26 MW

Cherkassytransgas, 1 GPU, power 16 MW


2002 CS Stavishchenskaya, Kiev region 1 DU70 (GPU-16K "Vodoley"

Cherkassytransgas 1 GPU, power 10 MW


2002 CS Kirovogradskaya 1 DN (modernization GTK-10-4)

CS Stavishchenskaya, Kiev region


UGT 15000 (DG90)
Beginning Number
of operation Location of gas turbines

RUSSIA. Total number 66 GPU total power 1056 MW


Volgotransgas, 5 GPU total power 80 MW
1997 CS Zavolzhskaya, Chuvashiya 5 (modernization GTK-10-4)

Noyabrskgasdobycha, 10 GPU total power 160 MW


1998 CS Komsomolskaya, Tyumen region 6
2002 CS Gubkinskaya, Tyumen region 4

Surgutgasprom, 33 GPU total power 528 MW


1991 CS Bogandinskaya, Tyumen region 5 (modernization GTK Coberra-182)
1995-2002 CS Turtasskaya, Tyumen region 5 (modernization GTK-10-4)
5 (modernization GTK Coberra-182)
1997 CS Vyngapurovskaya-3, Tyumen region 6
1996 CS Demyanskaya, Tyumen region 6 (modernization GTK-10-4)
2001 CS Vyngapurovskaya-1, Tyumen region 6 (modernization GTK-10-4)

Yamburggasdobycha, 18 GPU total power 288 MW


2002 DKS-1, Yamburg 6
2002 DKS-3, Yamburg 6
2002 DKS-6, Yamburg 6
UKRAINE. Total number 6 GPU total power 96 MW
Prikarpattransgas, 4 GPU total power 64 MW
2001 CS Tarutinskaya, Odessa region 3
2001 CS Dolyna, Ivano-Frankovsk region 1
1999 Odessa Port Plant 2 "Coberra"

BELARUS. Total number 5 GPU total power 80 MW


1999 CS Nesvizh, Minsk region 5

UGT25000 (DN80)
Beginning Number
of operation Location of gas turbines

Russia. Total number 15 GPU, total power 375 MW

Permtransgas, 6 GPU, total power 150 MW


2002 CS Agryzskaya, Perm region 3 (modernization GTK-25/76)
2002 CS Ordinskaya, Perm region 3 (modernization GTK-25/76)

Tyumentransgas, 9 GPU, total power 225 MW


2002 CS Tayozhnaya-4, Tyumen region 3 (modernization GTK-25/76)
2002 CS Tayozhnaya-5, Tyumen region 3 (modernization GTK-25/76)
2002 CS N.Komsomolskaya,Tyumen region 3 (modernization GTK-25/76)

UKRAINE. Total number 8 GPU, total power 200 MW

Kievtransgas, 4 GPU, total power 100 MW


1998 CS Romnenskaya, Sumy region 3 (modernization GTK-25/76)
1998 CS Grebenkovskaya, Poltava region 2 (modernization GTK-25/76)

Cherkassytransgas, 4 GPU, total power 100 MW


1995 CS Sofievskaya, Cherkassy region 1 (modernization GTK-25/76)
1998 CS Barskaya, Vinnitsa region 2 (modernization GTK-25/76)
19

SRDP GC “Zorya”-”Mashproekt”
also offers:

Industrial and marine gas turbine engines


Gas turbine propulsion plants
Gas turbine power plants
Gas pumping units
Fuel and pneumatic equipment for gas turbine
engines
Waste heat recovery boilers
Another tailor-made industrial equipment
Everybody need reliable machines and reliable partners.
We make reliable machines.

GTR&PC “Zorya”-”Mashproekt”
42a Oktyabrsky prospekt
Nikolaev, 54018, Ukraine.
Tel. +38 0512 50-90-40, 50-25-61, 55-69-92,
Fax +38 0512 50-90-50, 55-68-68

You might also like