MARUTHI POLYTECHNIC COLLEGE – ATTUR

BOARD PRACTICAL EXAMINATION – APRIL – 2018


DEPARTMENT OF CIVIL ENGINEERING
SUBJECT : COMPUTER APPLICATIONS IN CIVIL ENGINEERING PRACTICE TIME : 10:00am to 1:00pm
PRACTICAL CODE : 508-1010-31066 DATE : 04 .07.2022

1
A. Prepare the estimate sheet with given data:-
1.Earth work excavation:-
NO L B D
RCC column - 15 2.50 2.50 3.00
Ramp - 2 6.00 2.50 0.15
Plinth beam - 1 15.20 0.20 0.30
2.PCC 1:5:10:-
RCC column - 15 2.50 2.50 0.15
Ramp (Base) - 2 6.00 2.50 0.15
Ramp (Slope) - 2 6.00 2.50 0.30
3.Brick work with CM 1:6:-
Main wall - 1 36.00 0.23 3.00
Wall B/W kitchen and living - 1 3.50 0.23 3.00
Wall B/W hall and living - 1 4.20 0.23 3.00
Parapet wall - 1 36.00 0.23 0.60

B. Continuous one way slab(with three equal spans):-

Clear span - 4300mm


Width of support on either sides - 200mm
Total thickness of slab - 160mm
Clear cover for sides, top & bottom - 15mm

Reinforcement details:-

Main reinforcement - 10mm RTS bars @ 170mm C/C


Distributors and supporting main bar - 8mm RTS bars @ 210mm C/C
Slab breath - (Assume 2000mm)

INTERNAL EXAMINER EXTERNAL EXAMINER


MARUTHI POLYTECHNIC COLLEGE – ATTUR
BOARD PRACTICAL EXAMINATION – APRIL – 2018
DEPARTMENT OF CIVIL ENGINEERING
SUBJECT : COMPUTER APPLICATIONS IN CIVIL ENGINEERING PRACTICE TIME : 10:00am to 1:00pm
PRACTICAL CODE : 508-1010-31066 DATE : 04 .07.2022

2
A. Prepare the abstract sheet with given data:-
1. Earth work excavation - 260m3 (60/m3)
2. PCC 1:5:10 - 120m3 (180/m3)
3. Brick work with CM 1:6 - 200m3 (2000/m3)
4. Sand filling - 65m3 (120/m3)
5. RCC 1:2:4 in lintel and sunshade - 150m3 (4000/m3)
6. Flooring concrete 1:4:8 - 36m2 (300/m2)

B. Carry out the analysis and design of RCC structures:-

4m 4m

3m Bed room-1 Bed room-2

Kitchen Hall

3m

Given data:-

Footing level to below plinth - 3m


Ceiling height - 3m
Column size - 230mm x 230mm
Plinth beam - 230mm x 400mm
Roof beam - 230mm x 380mm
Udl load on roof level - 8KN/m
Udl load on plinth level - 24KN/m
Grade of concrete - M20
Grade of steel - Fe415

INTERNAL EXAMINER EXTERNAL EXAMINER


MARUTHI POLYTECHNIC COLLEGE – ATTUR
BOARD PRACTICAL EXAMINATION – APRIL – 2018
DEPARTMENT OF CIVIL ENGINEERING
SUBJECT : COMPUTER APPLICATIONS IN CIVIL ENGINEERING PRACTICE TIME : 10:00am to 1:00pm
PRACTICAL CODE : 508-1010-31066 DATE : 04 .07.2022

3
A. Calculate area and elongation for the given data using MS- Excel:-
Pull in N P- 16000
Length in mm L- 1500
External diameter in mm D- 20
Internal diameter in mm d-16
Young’s modulus in N/mm2 E- 75000

B. Simply supported two way slab (Corners not held down):-

Size of the room - 6.0m x 5.0m


Width of support - 200mm
Thickness of slab - 160mm
Clear cover - 15mm
Edge cover - 25mm

Reinforcement details:-

Reinforcement parallel to longer span 12mm RTS bars @ 200mm C/C


Reinforcement parallel to shorter span 12mm RTS bars @ 250mm C/C
Supporting bars 8mm RTS bars @ 200mm C/C

4
A. Calculate the effective depth and area of steel for the given data suing MS-Excel:-
INTERNAL EXAMINER EXTERNAL EXAMINER
MARUTHI POLYTECHNIC COLLEGE – ATTUR
BOARD PRACTICAL EXAMINATION – APRIL – 2018
DEPARTMENT OF CIVIL ENGINEERING
SUBJECT : COMPUTER APPLICATIONS IN CIVIL ENGINEERING PRACTICE TIME : 10:00am to 1:00pm
PRACTICAL CODE : 508-1010-31066 DATE : 04 .07.2022

b in mm -300
fck in N/mm2 -20
fy in N/mm2 -415
Qu -2.76
Mu in Nmm -160000000

B. Restrained two way slab:-

Size of the room - 4.0m x 3.6m


Width of supports - 200mm
Thickness of slab - 150mm
Clear cover - 15mm top & bottom
Edge cover - 25mm

Reinforcement details:-

For middle strip


Parallel to longer span 12mm Fe415 steel @ 180mm C/C
Parallel to shorter span 12mm Fe415 steel @ 200mm C/C
Edge strip
Parallel to longer span 10mm Fe415 steel @ 180mm C/C
Parallel to shorter span 10mm Fe415 steel @ 180mm C/C
Torsion reinforcement
8mm Fe415 steel @ 140mm C/C

5
A. Find the base pressure and check the stability of the dam:-
Top width a- 2.0m

INTERNAL EXAMINER EXTERNAL EXAMINER


MARUTHI POLYTECHNIC COLLEGE – ATTUR
BOARD PRACTICAL EXAMINATION – APRIL – 2018
DEPARTMENT OF CIVIL ENGINEERING
SUBJECT : COMPUTER APPLICATIONS IN CIVIL ENGINEERING PRACTICE TIME : 10:00am to 1:00pm
PRACTICAL CODE : 508-1010-31066 DATE : 04 .07.2022

Bottom width b- 6.0m


Height of dam H- 10.0m
Height of water h- 8.0m
Specific weight of masonry γ c- 22000 N/m3
Specific weight of water γ w- 9810 N/m3

B. Singly reinforced rectangular beam:-

Size of the beam - 250 x 300mm


Clear span - 3.0m
Thickness of walls - 300mm
Clear cover (for All) - 25mm

Reinforcement details:-

Tension reinforcement 5 No’s of 18mm Fe415 steel


Hanger bars 2No’s of 10mm Fe415 steel
Stirrups 6mm of Fe250 @ 200mm C/C

6
A. Find the centre of gravity Ixx and Iyy for the L section:-

Angle section:-

INTERNAL EXAMINER EXTERNAL EXAMINER

2
MARUTHI POLYTECHNIC COLLEGE – ATTUR
BOARD PRACTICAL EXAMINATION – APRIL – 2018
DEPARTMENT OF CIVIL ENGINEERING
SUBJECT : COMPUTER APPLICATIONS IN CIVIL ENGINEERING PRACTICE TIME : 10:00am to 1:00pm
PRACTICAL CODE : 508-1010-31066 DATE : 04 .07.2022

Web - 40x300mm

Flange - 400x30mm

B. Doubly reinforced continuous rectangular beam with two equal spans:-

Size of beam - 300 x 600mm


Width of support - 300mm
Spacing of the beams - 6m C/C

Reinforcement details:-

For end supports


Tension reinforcement at top - 6 No’s of 18mm dia bars
Compression reinforcement at bottom - 2 No’s of 10mm dia bars
For interior support
Tension reinforcement at top - 6 No’s of 18mm dia bars
Compression reinforcement at bottom - 2 No’s of 10mm dia bars
For mid span sections
Tension reinforcement at top - 5 No’s of 18mm dia bars
Compression reinforcement at bottom - 2 No’s of 14mm dia bars
Stirrups 6mm of Fe250 @ 250mm C/C

7
A. Find the centre of gravity Ixx and Iyy for the I section:-
I section:-

Top flange - 400x40mm


3
INTERNAL EXAMINER
2 EXTERNAL EXAMINER
MARUTHI POLYTECHNIC COLLEGE – ATTUR
BOARD PRACTICAL EXAMINATION – APRIL – 2018
DEPARTMENT OF CIVIL ENGINEERING
SUBJECT : COMPUTER APPLICATIONS IN CIVIL ENGINEERING PRACTICE TIME : 10:00am to 1:00pm
PRACTICAL CODE : 508-1010-31066 DATE : 04 .07.2022

Web - 40x200mm

Bottom flange - 400x40mm

B. Carry out the analysis and design of RCC structures:-

4m 4m

3m Bed room-1 Bed room-2

Kitchen Hall

3m

Given data:-

Footing level to below plinth - 3m


Ceiling height - 3m
Column size - 230mm x 230mm
Plinth beam - 230mm x 400mm
Roof beam - 230mm x 380mm
Udl load on roof level - 8KN/m
Udl load on plinth level - 24KN/m
Grade of concrete - M20
Grade of steel - Fe415

8
A. Find the centre of gravity Ixx and Iyy for the I section:-

T section:-

1
INTERNAL EXAMINER EXTERNAL EXAMINER
MARUTHI POLYTECHNIC COLLEGE – ATTUR
BOARD PRACTICAL EXAMINATION – APRIL – 2018
DEPARTMENT OF CIVIL ENGINEERING
SUBJECT : COMPUTER APPLICATIONS IN CIVIL ENGINEERING PRACTICE TIME : 10:00am to 1:00pm
PRACTICAL CODE : 508-1010-31066 DATE : 04 .07.2022

Flange - 300x30mm

2 Web - 30x400mm

B. Dog legged staircase:-


Clear size of staircase room - 4.8m x 2.4m
Width of stair - 1100mm
Rise of stair - 150mm
Thread of stair - 250mm
No of steps in each flight - 11 No’s
Thickness of slab - 160mm
Reinforcement details:-
Footing reinforcement - 12mm main bars & 10mm distributers @ 200mm C/C
Main reinforcement for waist & landing - 12mm Fe415 steel @ 150mm C/C

9
A. Prepare the estimate sheet with given data:-
1.Earth work excavation:-
NO L B D
RCC column - 15 2.50 2.50 3.00
Ramp - 2 6.00 2.50 0.15
INTERNAL EXAMINER EXTERNAL EXAMINER
MARUTHI POLYTECHNIC COLLEGE – ATTUR
BOARD PRACTICAL EXAMINATION – APRIL – 2018
DEPARTMENT OF CIVIL ENGINEERING
SUBJECT : COMPUTER APPLICATIONS IN CIVIL ENGINEERING PRACTICE TIME : 10:00am to 1:00pm
PRACTICAL CODE : 508-1010-31066 DATE : 04 .07.2022

Plinth beam - 1 15.20 0.20 0.30


2.PCC 1:5:10:-
RCC column - 15 2.50 2.50 0.15
Ramp (Base) - 2 6.00 2.50 0.15
Ramp (Slope) - 2 6.00 2.50 0.30
3.Brick work with CM 1:6:-
Main wall - 1 36.00 0.23 3.00
Wall B/W kitchen and living - 1 3.50 0.23 3.00
Wall B/W hall and living - 1 4.20 0.23 3.00
Parapet wall - 1 36.00 0.23 0.60

B. RCC Column with square isolated footings:-

Size of footings - 2400 x 1600mm


Column footing edge to tapper top (H-distance) - 600 x 300mm
Tapper top size - 1200 x 1000mm
Column footing edge to column edge (H-distance)- 900 x 600mm
Size of column - 600 x 400mm
Depth of PCC - 50mm
Depth of mat - 200mm
Depth of tapper - 600mm
Thickness of footing at the edge - 200mm
Cover - 50mm

Reinforcement details:-

For column
8 No’s of compression reinforcement - 18mm dia bars Fe415 steel
Lateral ties - 8mm dia bars Fe415 steel @ 220mm C/C
For footings
10 No’s of 14mm dia Fe415 steel at both directions

10
A. Prepare the abstract sheet with given data:-
1. Earth work excavation - 260m3 (60/m3)
2. PCC 1:5:10 - 120m3 (180/m3)
3. Brick work with CM 1:6 - 200m3 (2000/m3)
4. Sand filling - 65m3 (120/m3)

INTERNAL EXAMINER EXTERNAL EXAMINER


MARUTHI POLYTECHNIC COLLEGE – ATTUR
BOARD PRACTICAL EXAMINATION – APRIL – 2018
DEPARTMENT OF CIVIL ENGINEERING
SUBJECT : COMPUTER APPLICATIONS IN CIVIL ENGINEERING PRACTICE TIME : 10:00am to 1:00pm
PRACTICAL CODE : 508-1010-31066 DATE : 04 .07.2022

5. RCC 1:2:4 in lintel and sunshade - 150m3 (4000/m3)


6. Flooring concrete 1:4:8 - 36m2 (300/m2)

B. Developthe CPM/PERT network for the following works:-

1. Earth work excavation - 10 Days


2. PCC 1:4:8 in foundation - 3 Days
3. RCC Column mat - 2 Days
4. RCC column 1:2:4 upto plinth beam - 3 Days
5. Plinth beam 1:2:4 mix - 1 Day
6. Column shoe - 1Day
7. Column - 6 Days
8. Roof slab - 1 Day
9. Brick work - 7 Days
10. Plastering with CM 1:3 - 8 Days

11
A. Calculate area and elongation for the given data using MS- Excel:-
Pull in N P- 16000
Length in mm L- 1500

INTERNAL EXAMINER EXTERNAL EXAMINER


MARUTHI POLYTECHNIC COLLEGE – ATTUR
BOARD PRACTICAL EXAMINATION – APRIL – 2018
DEPARTMENT OF CIVIL ENGINEERING
SUBJECT : COMPUTER APPLICATIONS IN CIVIL ENGINEERING PRACTICE TIME : 10:00am to 1:00pm
PRACTICAL CODE : 508-1010-31066 DATE : 04 .07.2022

External diameter in mm D- 20
Internal diameter in mm d-16
Young’s modulus in N/mm2 E- 75000

B. Developthe CPM/PERT network for the following works:-

1. Earth work excavation - 10 Days


2. PCC 1:4:8 in foundation - 3 Days
3. RCC Column mat - 2 Days
4. RCC column 1:2:4 upto plinth beam - 3 Days
5. Plinth beam 1:2:4 mix - 1 Day
6. Column shoe - 1Day
7. Column - 6 Days
8. Roof slab - 1 Day
9. Brick work - 7 Days
10. Plastering with CM 1:3 - 8 Days

12
A. Calculate the effective depth and area of steel for the given data suing MS-Excel:-
b in mm -300
fck in N/mm2 -20
INTERNAL EXAMINER EXTERNAL EXAMINER
MARUTHI POLYTECHNIC COLLEGE – ATTUR
BOARD PRACTICAL EXAMINATION – APRIL – 2018
DEPARTMENT OF CIVIL ENGINEERING
SUBJECT : COMPUTER APPLICATIONS IN CIVIL ENGINEERING PRACTICE TIME : 10:00am to 1:00pm
PRACTICAL CODE : 508-1010-31066 DATE : 04 .07.2022

fy in N/mm2 -415
Qu -2.76
Mu in Nmm -160000000

B. Carry out the analysis and design of RCC structures:-

4m 4m

3m Bed room-1 Bed room-2

Kitchen Hall

3m

Given data:-

Footing level to below plinth - 3m


Ceiling height - 3m
Column size - 230mm x 230mm
Plinth beam - 230mm x 400mm
Roof beam - 230mm x 380mm
Udl load on roof level - 8KN/m
Udl load on plinth level - 24KN/m
Grade of concrete - M20
Grade of steel - Fe415

13
A. Find the base pressure and check the stability of the dam:-
Top width a- 2.0m
Bottom width b- 6.0m
Height of dam H- 10.0m
Height of water h- 8.0m
Specific weight of masonry γ c- 22000 N/m3
Specific weight of water γ w- 9810 N/m3
INTERNAL EXAMINER EXTERNAL EXAMINER
MARUTHI POLYTECHNIC COLLEGE – ATTUR
BOARD PRACTICAL EXAMINATION – APRIL – 2018
DEPARTMENT OF CIVIL ENGINEERING
SUBJECT : COMPUTER APPLICATIONS IN CIVIL ENGINEERING PRACTICE TIME : 10:00am to 1:00pm
PRACTICAL CODE : 508-1010-31066 DATE : 04 .07.2022

B. Carry out the analysis and design of RCC structures:-

4m 4m

3m Bed room-1 Bed room-2

Kitchen Hall

3m

Given data:-

Footing level to below plinth - 3m


Ceiling height - 3m
Column size - 230mm x 230mm
Plinth beam - 230mm x 400mm
Roof beam - 230mm x 380mm
Udl load on roof level - 8KN/m
Udl load on plinth level - 24KN/m
Grade of concrete - M20
Grade of steel - Fe415

14
A. Find the centre of gravity Ixx and Iyy for the L section:-
Angle section:-

Web - 40x300mm
2
Flange - 400x30mm

INTERNAL EXAMINER
1 EXTERNAL EXAMINER
MARUTHI POLYTECHNIC COLLEGE – ATTUR
BOARD PRACTICAL EXAMINATION – APRIL – 2018
DEPARTMENT OF CIVIL ENGINEERING
SUBJECT : COMPUTER APPLICATIONS IN CIVIL ENGINEERING PRACTICE TIME : 10:00am to 1:00pm
PRACTICAL CODE : 508-1010-31066 DATE : 04 .07.2022

B. Carry out the analysis and design of RCC structures:-

4m 4m

3m Bed room-1 Bed room-2

Kitchen Hall

3m

Given data:-

Footing level to below plinth - 3m


Ceiling height - 3m
Column size - 230mm x 230mm
Plinth beam - 230mm x 400mm
Roof beam - 230mm x 380mm
Udl load on roof level - 8KN/m
Udl load on plinth level - 24KN/m
Grade of concrete - M20
Grade of steel - Fe415

15
A. Find the centre of gravity Ixx and Iyy for the I section:-
I section:-

Top flange - 400x40mm


3
Web - 40x200mm
2
Bottom flange - 400x40mm

INTERNAL EXAMINER EXTERNAL EXAMINER


MARUTHI POLYTECHNIC COLLEGE – ATTUR
BOARD PRACTICAL EXAMINATION – APRIL – 2018
DEPARTMENT OF CIVIL ENGINEERING
SUBJECT : COMPUTER APPLICATIONS IN CIVIL ENGINEERING PRACTICE TIME : 10:00am to 1:00pm
PRACTICAL CODE : 508-1010-31066 DATE : 04 .07.2022

B. Developthe CPM/PERT network for the following works:-

1. Earth work excavation - 10 Days


2. PCC 1:4:8 in foundation - 3 Days
3. RCC Column mat - 2 Days
4. RCC column 1:2:4 upto plinth beam - 3 Days
5. Plinth beam 1:2:4 mix - 1 Day
6. Column shoe - 1Day
7. Column - 6 Days
8. Roof slab - 1 Day
9. Brick work - 7 Days
10. Plastering with CM 1:3 - 8 Days

16
A. Find the centre of gravity Ixx and Iyy for the I section:-

T section:-

1
Flange - 300x30mm

2 Web - 30x400mm

INTERNAL EXAMINER EXTERNAL EXAMINER


MARUTHI POLYTECHNIC COLLEGE – ATTUR
BOARD PRACTICAL EXAMINATION – APRIL – 2018
DEPARTMENT OF CIVIL ENGINEERING
SUBJECT : COMPUTER APPLICATIONS IN CIVIL ENGINEERING PRACTICE TIME : 10:00am to 1:00pm
PRACTICAL CODE : 508-1010-31066 DATE : 04 .07.2022

B. Developthe CPM/PERT network for the following works:-

1. Earth work excavation - 10 Days


2. PCC 1:4:8 in foundation - 3 Days
3. RCC Column mat - 2 Days
4. RCC column 1:2:4 upto plinth beam - 3 Days
5. Plinth beam 1:2:4 mix - 1 Day
6. Column shoe - 1Day
7. Column - 6 Days
8. Roof slab - 1 Day
9. Brick work - 7 Days
10. Plastering with CM 1:3 - 8 Days

INTERNAL EXAMINER EXTERNAL EXAMINER